Policy Replication

← Rulemakings

Hazardous Materials: Volatility of Unrefined Petroleum Products and Class 3 Materials

RIN 2137-AF24 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 11 references in its rule and RIA documents

A rulemaking follows one regulatory action through all its stages. A stage often has several Federal Register documents (the proposal itself, comment-period extensions, meeting notices, supplemental proposals, corrections), the regulatory impact analysis can be several files for each of the proposed and final rule, and an agency may keep more than one docket. Each document says why it is in this rulemaking and how sure that link is.

Complete Every stage OIRA reviewed is here.

3 documents in this rulemaking.
Pre-ruleheldOIRA review 2016-12-15 · 1 document
Proposed rulenoneNo OIRA review
Interim final rulenoneNo OIRA review
Final rulenoneNo OIRA review
Regulatory impact analysisnone
Docket documents7 of 7 held1 docket; public comments not listed

Pre-rule stage: Federal Register documents (1)

Hazardous Materials: Volatility of Unrefined Petroleum Products and Class 3 Materials

Advance notice (ANPRM)2017-01-18 · FR 2017-00913 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 8 references
Federal Register action: Advance notice of proposed rulemaking (ANPRM).
In this rulemaking because: RIN printed on the document (RIN 2137-AF24) · high confidence

Other Federal Register notices (corrections, delays, withdrawals) (2)

Hazardous Materials: Volatility of Unrefined Petroleum Products and Class 3 Materials

Advance notice (ANPRM)2017-03-21 · FR 2017-05488 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration
Federal Register action: Advance notice of proposed rulemaking (ANPRM); Extension of comment period.
In this rulemaking because: RIN printed on the document (RIN 2137-AF24) · high confidence

Hazardous Materials: Vapor Pressure of Unrefined Petroleum Products and Class 3 Materials

Advance notice (ANPRM)2020-05-20 · FR 2020-10377 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 3 references
Federal Register action: Advance notice of proposed rulemaking (ANPRM); withdrawal.
In this rulemaking because: RIN printed on the document (RIN 2137-AF24) · high confidence

Docket documents

PHMSA-2016-0077: 7 documents, 7 held · Correspondence 1 (1 held), Reports 3 (3 held), Rule documents 3 (3 held)

Hazardous Materials: Volatility of Unrefined Petroleum Products and Class 3 Materials

Rule documentsHeld2017-01-18 · PHMSA-2016-0077-0001 · Proposed Rule · Advance Notice of Proposed Rulemaking (ANPRM) · FR 2017-00913

Hazardous Materials: Volatility of Unrefined Petroleum Products and Class 3 Materials

Rule documentsHeld2017-03-21 · PHMSA-2016-0077-0017 · Proposed Rule · Extension of Comment Period · FR 2017-05488

Hazardous Materials: Vapor Pressure of Unrefined Petroleum Products and Class 3 Materials

Rule documentsHeld2020-05-20 · PHMSA-2016-0077-0092 · Proposed Rule · Advance Notice of Proposed Rulemaking (ANPRM) · FR 2020-10377

OIRA reviews (1)

Prerulereceived 2016-12-15, concluded 2017-01-09 · Consistent with Change