Policy Replication

← Rulemakings

Integration of Powered-Lift: Pilot Certification and Operations; Miscellaneous Amendments Related to Rotorcraft and Airplanes

RIN 2120-AL72 · DEPARTMENT OF TRANSPORTATION; Federal Aviation Administration · Econ. significantMajor · 103 references in its rule and RIA documents

A rulemaking follows one regulatory action through all its stages. A stage often has several Federal Register documents (the proposal itself, comment-period extensions, meeting notices, supplemental proposals, corrections), the regulatory impact analysis can be several files for each of the proposed and final rule, and an agency may keep more than one docket. Each document says why it is in this rulemaking and how sure that link is.

Complete Every stage OIRA reviewed is here, with the regulatory impact analysis.

5 documents in this rulemaking.
Pre-rulenoneNo OIRA review
Proposed ruleheldOIRA review 2023-03-30 · 1 document
Interim final rulenoneNo OIRA review
Final ruleheldOIRA review 2024-07-22 · 2 documents
Regulatory impact analysis1 file2 rule documents with an RIA section
Docket documents11 of 12 held1 docket; public comments not listed

Proposed rule stage: Federal Register documents (1)

Integration of Powered-Lift: Pilot Certification and Operations; Miscellaneous Amendments Related to Rotorcraft and Airplanes

Proposed rule (NPRM)2023-06-14 · FR 2023-11497 · DEPARTMENT OF TRANSPORTATION; Federal Aviation Administration · 45 references · RIA in rule text (20,156 characters)
Federal Register action: Notice of proposed rulemaking (NPRM).
In this rulemaking because: RIN printed on the document (RIN 2120-AL72) · high confidence

Final rule stage: Federal Register documents (2)

Integration of Powered-Lift: Pilot Certification and Operations; Miscellaneous Amendments Related to Rotorcraft and Airplanes

Final rule2024-11-21 · FR 2024-24886 · DEPARTMENT OF TRANSPORTATION; Federal Aviation Administration · 42 references, 2 linked to papers · RIA in rule text (47,546 characters)
Federal Register action: Final rule.
In this rulemaking because: RIN printed on the document (RIN 2120-AL72) · high confidence

Enforcement Policy Regarding “Integration of Powered-Lift: Pilot Certification and Operations; Miscellaneous Amendments Related to Rotorcraft and Airplanes; Correction”

Final rule2025-03-11 · FR 2025-03844 · DEPARTMENT OF TRANSPORTATION; Federal Aviation Administration · 3 references
Federal Register action: Notice of enforcement discretion.
In this rulemaking because: RIN printed on the document (RIN 2120-AL72) · high confidence

Other Federal Register notices (corrections, delays, withdrawals) (1)

Integration of Powered-Lift: Pilot Certification and Operations; Miscellaneous Amendments Related to Rotorcraft and Airplanes; Correction

Correction2025-01-03 · FR 2024-30331 · DEPARTMENT OF TRANSPORTATION; Federal Aviation Administration · 2 references
Federal Register action: Final rule; correction.
In this rulemaking because: RIN printed on the document (RIN 2120-AL72) · high confidence

Regulatory impact analyses (1)

For the final rule

2120-AL72 Powered-lift RIA FAA 2024

RIA2024-11-22 · Regulatory impact analysis · FAA · 11 references, 1 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2120-AL72) · high confidence

Docket documents

FAA-2023-1275: 12 documents, 11 held · Analyses 1 (1 held), Correspondence 2 (2 held), Other 1, Reports 4 (4 held), Rule documents 4 (4 held)

U.S. DOT/FAA - Memorandum

CorrespondenceHeld2023-06-15 · FAA-2023-1275-0003 · Other · Memorandum

Senators Brown and Vance - Letter

CorrespondenceHeld2024-05-15 · FAA-2023-1275-0089 · Other · Letter(s)

OIRA reviews (2)

Proposed Rulereceived 2023-03-30, concluded 2023-05-22 · Consistent with Change
Final Rulereceived 2024-07-22, concluded 2024-10-18 · Consistent with Change · econ. significant · major