Policy Replication

← Rulemakings

Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residues From Electric Utilities: Amendments to the National Minimum Criteria (Phase 1)

RIN 2050-AG88 · ENVIRONMENTAL PROTECTION AGENCY · Econ. significant · 56 references in its rule and RIA documents

A rulemaking follows one regulatory action through all its stages. A stage often has several Federal Register documents (the proposal itself, comment-period extensions, meeting notices, supplemental proposals, corrections), the regulatory impact analysis can be several files for each of the proposed and final rule, and an agency may keep more than one docket. Each document says why it is in this rulemaking and how sure that link is.

Complete Every stage OIRA reviewed is here, with the regulatory impact analysis.

6 documents in this rulemaking.
Pre-rulenoneNo OIRA review
Proposed ruleheldOIRA review 2017-12-20 · 1 document
Interim final rulenoneNo OIRA review
Final ruleheldOIRA review 2018-06-12 · 1 document
Regulatory impact analysis3 files
Docket documents21 of 46 held1 docket; public comments not listed

Proposed rule stage: Federal Register documents (1)

Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Amendments to the National Minimum Criteria (Phase One); Proposed Rule

Proposed rule (NPRM)2018-03-15 · FR 2018-04941 · ENVIRONMENTAL PROTECTION AGENCY · 23 references, 3 linked to papers
Federal Register action: Proposed rule.
In this rulemaking because: RIN printed on the document (RIN 2050-AG88) · high confidence

Final rule stage: Federal Register documents (1)

Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals From Electric Utilities; Amendments to the National Minimum Criteria (Phase One, Part One)

Final rule2018-07-30 · FR 2018-16262 · ENVIRONMENTAL PROTECTION AGENCY · 13 references
Federal Register action: Final rule.
In this rulemaking because: RIN printed on the document (RIN 2050-AG88) · high confidence

Regulatory impact analyses (3)

For the proposed rule

CCR Phase One Proposed Rule RIA - March 1, 2018 (002)

RIA2018-03-15 · Regulatory impact analysis · EPA · 10 references
In this rulemaking because: RIN printed on the document (RIN 2050-AG88) · high confidence
For the final rule

Regulatory Impact Analysis (RIA) for CCR Phase One Part One Final Rule

RIA2018-07-30 · Regulatory impact analysis · EPA · 5 references
In this rulemaking because: RIN printed on the document (RIN 2050-AG88) · high confidence

EO12866 CCR Phase 1 Part 1 2050 AG88 Regulatory Impact Analysis (RIA): Redline Copy Post OMB Review

RIA2018-07-30 · Regulatory impact analysis · EPA · 5 references
In this rulemaking because: RIN printed on the document (RIN 2050-AG88) · high confidence

Docket documents

EPA-HQ-OLEM-2017-0286: 46 documents, 21 held · Analyses 2 (2 held), Correspondence 7, Other 6, Publications 16 (4 held), Reports 11 (11 held), OIRA review record 2 (2 held), Rule documents 2 (2 held)

Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; Amendments to the National Minimum Criteria (Phase One)

Rule documentsHeld2018-03-15 · EPA-HQ-OLEM-2017-0286-0001 · Proposed Rule · Notice of Proposed Rulemaking (NPRM) · FR 2018-04941

FEMA 534 Technical Manual for Dam Owners- Impacts of Plants on Earthen Dams

ReportsHeld2018-03-15 · EPA-HQ-OLEM-2017-0286-0003 · Supporting & Related Material · Technical Support Document

A Ground-Water Protection Strategy for the Environmental Protection Agency (August 1984)

ReportsHeld2018-03-15 · EPA-HQ-OLEM-2017-0286-0006 · Supporting & Related Material · Report

Sensitivity Analysis for the Coal Combustion Waste Risk Assessment. Draft Technical Report. USEPA, OSW, September 1, 2009

ReportsHeld2018-03-15 · EPA-HQ-OLEM-2017-0286-0012 · Supporting & Related Material · Report

TVA and USEPA . 1979. Characterization of Coal Pile Drainage- Interagency Energy-Environment R&D Program Report. [EPA-600-7-79-051]. February 1979

ReportsHeld2018-03-15 · EPA-HQ-OLEM-2017-0286-0013 · Supporting & Related Material · Report

NERC (North American Electric Reliability Corporation). 2010. Special Reliability Scenario Assessment- Potential Resource Adequacy Impacts of U.S. Environmental Regulations. October 2010

ReportsHeld2018-03-15 · EPA-HQ-OLEM-2017-0286-0015 · Supporting & Related Material · Report

NERC (North American Electric Reliability Corporation). 2011. Potential Impacts of Future Environmental Regulations. November 2011

ReportsHeld2018-03-15 · EPA-HQ-OLEM-2017-0286-0016 · Supporting & Related Material · Report

CCR Phase One Proposed Rule RIA - March 1, 2018 (002)

AnalysesHeld2018-03-15 · EPA-HQ-OLEM-2017-0286-0020 · Supporting & Related Material · Analysis

Potential Electric Reliability Risks Due to Cessation of Power Generation as a Result of the Closure of Unlined Surface Impoundments Under 40 CFR Part 257.101 for the Failure to Meet Groundwater Protection Standards. EEI (Edison Electric Institute). 2017

ReportsHeld2018-03-15 · EPA-HQ-OLEM-2017-0286-0022 · Supporting & Related Material · Report

Hazardous and Solid Waste Management System: Disposal of Coal Combustion Residuals from Electric Utilities; Amendments to National Minimum Criteria (Phase One, Part One)

Rule documentsHeld2018-07-30 · EPA-HQ-OLEM-2017-0286-2227 · Rule · Final Rule · FR 2018-16262

USWAG Petition for Rulemaking to Reconsider Provisions of the CCR Rule April 17, 2015

ReportsHeld2018-07-30 · EPA-HQ-OLEM-2017-0286-2231 · Supporting & Related Material · Report

Final 2016 Effluent Guidelines Program Plant, April 2018

ReportsHeld2018-07-30 · EPA-HQ-OLEM-2017-0286-2232 · Supporting & Related Material · Report

Ground-Water Monitoring Guidance for Owners and Operators of Interim Status Facilities March 1983

ReportsHeld2018-07-30 · EPA-HQ-OLEM-2017-0286-2233 · Supporting & Related Material · Report

Supplementary Guidance for Conducting Health Risk Assessment of Chemical Mixtures

ReportsHeld2018-07-30 · EPA-HQ-OLEM-2017-0286-2241 · Supporting & Related Material · Risk Assessment

Regulatory Impact Analysis (RIA) for CCR Phase One Part One Final Rule

AnalysesHeld2018-07-30 · EPA-HQ-OLEM-2017-0286-2245 · Supporting & Related Material · Analysis

EO12866 CCR Phase 1 Part 1 2050 AG88 Regulatory Impact Analysis (RIA): Redline Copy Post OMB Review

OIRA review recordHeld2018-07-30 · EPA-HQ-OLEM-2017-0286-2246 · Supporting & Related Material · Analysis

EO12866 CCR Phase 1 Part 1 2050 AG88 Final Preamble and Rule: Redline Copy Post OMB Review

OIRA review recordHeld2018-07-30 · EPA-HQ-OLEM-2017-0286-2247 · Supporting & Related Material · Report

OIRA reviews (2)

Proposed Rulereceived 2017-12-20, concluded 2018-03-01 · Consistent with Change · econ. significant
Final Rulereceived 2018-06-12, concluded 2018-07-13 · Consistent with Change