Policy Replication

← Rulemakings

Public Notice Requirements for Combined Sewer Overflow Discharges to the Great Lakes

RIN 2040-AF67 · ENVIRONMENTAL PROTECTION AGENCY · 27 references in its rule and RIA documents

A rulemaking follows one regulatory action through all its stages. A stage often has several Federal Register documents (the proposal itself, comment-period extensions, meeting notices, supplemental proposals, corrections), the regulatory impact analysis can be several files for each of the proposed and final rule, and an agency may keep more than one docket. Each document says why it is in this rulemaking and how sure that link is.

Complete Every stage OIRA reviewed is here.

4 documents in this rulemaking.
Pre-rulenoneNo OIRA review
Proposed ruleheld, not OIRA-reviewedNo OIRA review · 1 document
Interim final rulenoneNo OIRA review
Final ruleheldOIRA review 2017-11-16 · 1 document
Regulatory impact analysis1 file
Docket documents96 of 101 held1 docket; public comments not listed

Proposed rule stage: Federal Register documents (1)

Public Notification Requirements for Combined Sewer Overflows to the Great Lakes Basin

Proposed rule (NPRM)2017-01-13 · FR 2016-31745 · ENVIRONMENTAL PROTECTION AGENCY · 11 references, 1 linked to papers
Federal Register action: Proposed rule.
In this rulemaking because: RIN printed on the document (RIN 2040-AF67) · high confidence

Final rule stage: Federal Register documents (1)

Public Notification Requirements for Combined Sewer Overflows to the Great Lakes Basin

Final rule2018-01-08 · FR 2017-27948 · ENVIRONMENTAL PROTECTION AGENCY · 5 references
Federal Register action: Final rule.
In this rulemaking because: RIN printed on the document (RIN 2040-AF67) · high confidence

Regulatory impact analyses (1)

For the proposed rule

Economic Analysis for the Proposed Great Lakes CSO Rule Draft 12-1-2016 v2

RIA2017-01-24 · Regulatory impact analysis · EPA · 11 references
In this rulemaking because: RIN printed on the document (RIN 2040-AF67) · high confidence

Docket documents

EPA-HQ-OW-2016-0376: 101 documents, 96 held · Analyses 1 (1 held), Correspondence 13 (13 held), Data 9 (9 held), Other 33 (33 held), Publications 30 (26 held), Reports 11 (11 held), OIRA review record 1 (1 held), Rule documents 3 (2 held)

CSO Public Noticification Plan

ReportsHeld2017-01-24 · EPA-HQ-OW-2016-0376-0069 · Supporting & Related Material · Report

Rule 2.1. Combined Sewer Overflow Public Notification

ReportsHeld2017-01-24 · EPA-HQ-OW-2016-0376-0072 · Supporting & Related Material · Report

Rule 2.1. Combined Sewer Overflow Public Notification

ReportsHeld2017-01-24 · EPA-HQ-OW-2016-0376-0073 · Supporting & Related Material · Report

Combined Sewer System Pollution Prevention Plan

ReportsHeld2017-01-24 · EPA-HQ-OW-2016-0376-0077 · Supporting & Related Material · Report

Overflow Reporting Procedures

ReportsHeld2017-01-24 · EPA-HQ-OW-2016-0376-0080 · Supporting & Related Material · Report

Northeast Ohio Regional Sewer District Reporting Procedure

ReportsHeld2017-01-24 · EPA-HQ-OW-2016-0376-0081 · Supporting & Related Material · Report

WPDES Permit No. WI-0025593-08-1 Superior Sewage Disposal System

ReportsHeld2017-01-24 · EPA-HQ-OW-2016-0376-0083 · Supporting & Related Material · Report

SPDES Compliance and Enforcement SFY 2014/15 Annual Report

ReportsHeld2017-01-24 · EPA-HQ-OW-2016-0376-0103 · Supporting & Related Material · Report

Permit No. WA0031682 Seattle, WA

ReportsHeld2017-01-24 · EPA-HQ-OW-2016-0376-0115 · Supporting & Related Material · Report

Summary of State CSO Public Notification Requirements in the Great Lakes Basin

ReportsHeld2017-01-24 · EPA-HQ-OW-2016-0376-0125 · Supporting & Related Material · Report

Annual Combined Sewer Overflow (CSO) Status Report

ReportsHeld2018-01-08 · EPA-HQ-OW-2016-0376-0187 · Supporting & Related Material · Report

OIRA reviews (1)

Final Rulereceived 2017-11-16, concluded 2017-12-18 · Consistent with Change