Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category

RIN 2040-AF14 · ENVIRONMENTAL PROTECTION AGENCY · Econ. significantMajor · 602 references in its rule and RIA documents

A rulemaking follows one regulatory action through all its stages. A stage often has several Federal Register documents (the proposal itself, comment-period extensions, meeting notices, supplemental proposals, corrections), the regulatory impact analysis can be several files for each of the proposed and final rule, and an agency may keep more than one docket. Each document says why it is in this rulemaking and how sure that link is.

Complete Every stage OIRA reviewed is here, with the regulatory impact analysis.

69 documents in this rulemaking, plus 9 identical copies not counted again. 53 documents also name another rulemaking (marked below); each is counted here only.
Pre-rulenoneNo OIRA review
Proposed ruleheldOIRA review 2013-01-15 · 2 documents
Interim final rulenoneNo OIRA review
Final ruleheldOIRA review 2015-07-02 · 2 documents
Regulatory impact analysis12 files2 rule documents with an RIA section
Docket documents165 of 6,474 held2 dockets; public comments not listed

Proposed rule stage: Federal Register documents (2)

Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category

Proposed rule (NPRM)2013-06-07 · FR 2013-10191 · ENVIRONMENTAL PROTECTION AGENCY · 23 references, 1 linked to papers · RIA in rule text (54,589 characters)
Federal Register action: Proposed rule.
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category

Comment period extended or reopened2013-07-12 · FR 2013-16774 · ENVIRONMENTAL PROTECTION AGENCY
Federal Register action: Proposed rule, extension of public-comment period.
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

Final rule stage: Federal Register documents (2)

Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category

Final rule2015-11-03 · FR 2015-25663 · ENVIRONMENTAL PROTECTION AGENCY · 12 references · RIA in rule text (23,742 characters)
Federal Register action: Final rule.
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

Postponement of Certain Compliance Dates for Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category

Final rule2017-04-25 · FR 2017-07811 · ENVIRONMENTAL PROTECTION AGENCY
Federal Register action: Notification; postponement of compliance dates.
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

Regulatory impact analyses (12)

For the proposed rule

Regulatory Impact Analysis For EPA’s Proposed RCRA Regulation Of Coal Combustion Residues (CCR) Generated by the Electric Utility Industry [DCN SE02969]

RIA2013-06-07 · Regulatory impact analysis · EPA · 56 references, 9 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

Technical Support Document: Calculating Benefit Per-Ton Estimates. Final Ozone NAAQS regulatory impact analysis [DCN SE03161]

Technical support document2013-06-07 · Regulatory impact analysis · EPA · 7 references, 2 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

Regulatory Impact Analysis for the Industrial Boilers and Process Heaters NESHAP: Final Report (EPA-452/R-04-0020) [DCN SE03156]

RIA2013-06-07 · Regulatory impact analysis · EPA · 58 references, 16 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

Regulatory Impact Analysis for the Proposed Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category [DCN SE03170]

RIA2013-06-07 · Regulatory impact analysis · EPA · 43 references, 6 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

Final Regulatory Analysis: Control of Emissions from Nonroad Diesel Engines (EPA420-R-04-007) [DCN SE03157]

RIA2013-06-07 · Regulatory impact analysis · EPA · 256 references, 96 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

Quality Assurance Project Plan (QAPP) for Economic Impact and Benefits Analysis for Steam Electric Rulemaking [DCN SE03376]

RIA2013-06-07 · Regulatory impact analysis · EPA · 22 references, 8 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

List of Rulemaking Cost and Economic Impact Files: Steam Electric Effluent Guidelines Rulemaking [DCN SE03351]

RIA2013-06-07 · Regulatory impact analysis · EPA
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence
For the final rule

Technical Update of the Social Cost for Regulatory Impact Analysis under Executive Order 12866. Revised November 2013 [DCN SE06037]

RIA2015-11-03 · Regulatory impact analysis · EPA · 17 references, 15 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

Technical Update of the Social Cost for Regulatory Impact Analysis under Executive Order 12866. Revised July 2015. [DCN SE06038]

RIA2015-11-03 · Regulatory impact analysis · EPA · 17 references, 14 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

Regulatory Impact Analysis for the Proposed Carbon Pollution Guidelines for Existing Power Plants and Emission Standards for Modified and Reconstructed Power Plants [DCN SE06112]

RIA2015-11-03 · Regulatory impact analysis · EPA · 52 references, 40 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

Regulatory Impact Analysis for the Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category [DCN SE05976]

RIA2015-11-03 · Regulatory impact analysis · EPA · 37 references, 16 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

List of Rulemaking Cost and Economic Impact Files: Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category [DCN SE05981]

RIA2015-11-03 · Regulatory impact analysis · EPA · 2 references
In this rulemaking because: RIN printed on the document (RIN 2040-AF14) · high confidence

Docket documents

EPA-HQ-OW-2009-0819: 6,472 documents, 163 held · Analyses 71 (60 held), Correspondence 1,176 (1 held), Data 1,003 (18 held), Other 1,177 (1 held), Publications 1,897 (3 held), Reports 1,074 (14 held), OIRA review record 56 (51 held), Rule documents 18 (15 held)
EPA-HQ-RCRA-2013-0209: 2 documents, 2 held · Rule documents 2 (2 held)

Letter to Peter Silva, USEPA from Elizabeth E. Aldridge, Hunton and Williams L.L.P on behalf of the Utility Water Act Group (UWAG) [DCN SE00112]

CorrespondenceHeld2009-12-30 · EPA-HQ-OW-2009-0819-0024 · Supporting & Related Material · Letter, Memorandum, Email

Letter to Elizabeth E. Aldridge, Hunton and Williams, LLP from Peter S. Silva, Assistant Administrator, USEPA [DCN SE00113]

CorrespondenceHeld2009-12-31 · EPA-HQ-OW-2009-0819-0026 · Supporting & Related Material · Letter, Memorandum, Email

Email to Ron Jordan, US EPA (January 22, 2010) [DCN SE00190]

CorrespondenceHeld2010-03-09 · EPA-HQ-OW-2009-0819-0032 · Supporting & Related Material · Letter, Memorandum, Email

Email to Ron Jordan, USEPA (February 19, 2010) [DCN SE00191]

CorrespondenceHeld2010-03-09 · EPA-HQ-OW-2009-0819-0033 · Supporting & Related Material · Letter, Memorandum, Email

Email to Defenders of Wildlife, Sierra Club, Environmental Integrity, Earth Justice, and Natural Resources Defense Council [DCN SE00192]

CorrespondenceHeld2010-03-09 · EPA-HQ-OW-2009-0819-0034 · Supporting & Related Material · Letter, Memorandum, Email

Email to Utility Water Act Group, American Public Power Association, and Edison Electric Institute [DCN SE00193]

CorrespondenceHeld2010-03-09 · EPA-HQ-OW-2009-0819-0035 · Supporting & Related Material · Letter, Memorandum, Email

Letter to Ron Jordan, USEPA/Engineering and Analysis Division regarding USEPA Draft Steam Effluent Guidelines Questionnaire (November 17, 2009) [DCN SE00195]

CorrespondenceHeld2010-03-09 · EPA-HQ-OW-2009-0819-0036 · Supporting & Related Material · Letter, Memorandum, Email

Letter to Ron Jordan, USEPA/Engineering and Analysis Division regarding Comments on USEPA (February 1, 2010) [DCN SE00197]

CorrespondenceHeld2010-03-09 · EPA-HQ-OW-2009-0819-0037 · Supporting & Related Material · Letter, Memorandum, Email

Email to Ron Jordan, USEPA/Engineering and Analysis Division regarding Steam Electric Power Generating EG - Proposed ICR Follow up Materials (January 20, 2010) [DCN SE00198]

CorrespondenceHeld2010-03-09 · EPA-HQ-OW-2009-0819-0038 · Supporting & Related Material · Letter, Memorandum, Email

Email to Ron Jordan, USEPA dated February 3, 2010 [DCN SE00199]

CorrespondenceHeld2010-03-09 · EPA-HQ-OW-2009-0819-0039 · Supporting & Related Material · Letter, Memorandum, Email

Letter to Ron Jordan, USEPA/Engineering and Analysis Division regarding Ash Handling Systems Cost List (February 18, 2010) [DCN SE00200]

CorrespondenceHeld2010-03-09 · EPA-HQ-OW-2009-0819-0040 · Supporting & Related Material · Letter, Memorandum, Email

Agenda and Example Flue Gas Desulfurization (FGD) Diagram for Discussion Between USEPA and Utility Water Act Group (UWAG) [DCN SE00201]

CorrespondenceHeld2010-03-09 · EPA-HQ-OW-2009-0819-0041 · Supporting & Related Material · Meeting/Teleconference Materials

Ron Jordan and Jezebele Alicea (February 25, 2010) [DCN SE00203]

CorrespondenceHeld2010-03-09 · EPA-HQ-OW-2009-0819-0042 · Supporting & Related Material · Letter, Memorandum, Email

Memorandum to Steam Electric Record [DCN SE00204]

CorrespondenceHeld2010-03-09 · EPA-HQ-OW-2009-0819-0043 · Supporting & Related Material · Letter, Memorandum, Email

Memorandum to Ron Jordan, USEPA [DCN SE00206]

CorrespondenceHeld2010-03-09 · EPA-HQ-OW-2009-0819-0045 · Supporting & Related Material · Letter, Memorandum, Email

Selenium Accumulation Associated with Fish Mortality and Reproductive Failure [DCN SE01851]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0086 · Supporting & Related Material · Meeting Materials

Aquatic Toxicology of Trace Elements of Coal and Fly Ash [DCN SE01854]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0089 · Supporting & Related Material · Meeting Materials

Selenium-Induced Changes in Fish Populations in a Heated Reservoir [DCN SE01885]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0120 · Supporting & Related Material · Meeting Materials

Groundwater Violations Found Near All 14 North Carolina Power Plants With Ash Ponds [DCN SE01896]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0131 · Supporting & Related Material · E-mail

Impacts of Fly Ash on Groundwater in Anne Arundel County, Maryland [DCN SE01946]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0179 · Supporting & Related Material · Meeting Materials

ICR Extension Request for Steam Electric Questionnaire - TVA [DCN SE00819]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0184 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire – Allegheny Energy [DCN SE00820]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0185 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire – Tucson Electric Power Company [DCN SE00821]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0186 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - FirstEnergy Corp. [DCN SE00822]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0187 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Midwest Generation EME [DCN SE00823]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0188 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Tampa Electric Company [DCN SE00824]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0189 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire Westmoreland Partners [DCN SE00825]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0190 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire White Pine Electric Power [DCN SE00826]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0191 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - RRI Conemaugh [DCN SE00827]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0192 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Cheswick Power Plant [DCN SE00828]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0193 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - RRI Choctaw [DCN SE00829]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0194 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Keystone [DCN SE00830]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0195 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Western Farmers Electric Cooperative [DCN SE00831]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0196 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - RRI Hunterstown [DCN SE00832]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0197 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - GWF [DCN SE00833]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0198 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Gulf Power [DCN SE00834]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0199 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Titus [DCN SE00835]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0200 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Seward [DCN SE00836]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0201 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Independence Power & Light [DCN SE00837]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0202 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Elrama Power Plant [DCN SE00838]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0203 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Capital Power Operations, Inc. [DCN SE00839]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0204 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Capital Power Operations, Inc. [DCN SE00840]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0205 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Avon Lake [DCN SE00841]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0206 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire Liberty Electric Power Plant [DCN SE00842]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0212 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire Mississippi Power [DCN SE00843]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0213 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire RRI Niles [DCN SE00844]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0214 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire Big Rivers [DCN SE00845]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0215 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Georgia Power [DCN SE00846]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0217 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - City of Gainesville [DCN SE00847]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0218 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - RRI Energy [DCN SE00848]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0219 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - RRI Energy [DCN SE00849]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0220 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - RRI Energy [DCN SE00850]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0222 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Mount Tom Generating Co. [DCN SE00851]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0226 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Allegheny Energy [DCN SE00852]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0235 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Allegheny Energy [DCN SE00853]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0236 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Allegheny Energy [DCN SE00854]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0237 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Allegheny Energy [DCN SE00855]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0238 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Hatfields Ferry Power Station [DCN SE00856]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0239 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Harrison Power Station [DCN SE00857]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0240 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Allegheny Energy [DCN SE00858]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0241 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Allegheny Energy [DCN SE00859]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0243 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Allegheny Energy [DCN SE00860]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0245 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Alabama Power [DCN SE00861]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0248 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Luminant Generation Co. [DCN SE00862]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0250 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Madison Gas & Electric [DCN SE00863]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0252 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - TES Filer City Station [DCN SE00864]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0254 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - RRI Coolwater [DCN SE00865]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0262 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - RRI Shawville [DCN SE00866]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0265 · Supporting & Related Material · Letter

ICR Extension Request for Steam Electric Questionnaire - RRI Energy - Portland [DCN SE00867]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0271 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - American Electric Power (AEP) [DCN SE00868]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0272 · Supporting & Related Material · Letter

ICR Extension Request for Steam Electric Questionnaire - Arizona Public Service (Cholla) [DCN SE00869]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0275 · Supporting & Related Material · Letter

ICR Extension Request for Steam Electric Questionnaire - Dominion Power [DCN SE00870]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0277 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Duke Energy [DCN SE00871]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0278 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Constellation Energy Environmental [DCN SE00872]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0279 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Calpine Corporation [DCN SE00873]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0280 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Chamois [DCN SE00874]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0281 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Glendale Water & Power [DCN SE00875]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0282 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - CPS Energy [DCN SE00876]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0283 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Southwest Power Station [DCN SE00877]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0284 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - River Road Gen Plant [DCN SE00878]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0285 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire, Dairyland Power Cooperative [DCN SE00879]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0286 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Dayton [DCN SE00880]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0287 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Dynegy [DCN SE00881]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0288 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire Ebensburg Power [DCN SE00882]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0289 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire Fortistar [DCN SE00883]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0290 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Golden Valley Electric Association (Healy) [DCN SE00884]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0293 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Merom [DCN SE00885]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0294 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - St Johns River Power Park [DCN SE00886]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0298 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Quindaro [DCN SE00887]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0301 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Menasha [DCN SE00888]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0303 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Milford Power Project [DCN SE00889]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0305 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Milton R Young [DCN SE00890]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0306 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Mirant [DCN SE00891]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0309 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire Montana-Dakota Utilities, Co. [DCN SE00892]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0312 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Far Rockaway [DCN SE00893]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0313 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Omaha Public Power District (OPPD) [DCN SE00894]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0314 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Stanton Energy Center [DCN SE00895]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0316 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Elmer Smith [DCN SE00896]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0317 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Dave Johnston Plant [DCN SE00897]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0319 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Charles R Lowman [DCN SE00898]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0322 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Public Service Co. of New Hampshire [DCN SE00899]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0324 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - B L England [DCN SE00900]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0327 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Richmond Power & Light [DCN SE00901]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0329 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Salt River Project [DCN SE00902]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0330 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - South Carolina Public Services Authority [DCN SE00903]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0331 · Supporting & Related Material · E-mail

Final Site Inspection for the Battlefield Golf Club Site, City of Chesapeake , Virginia [DCN SE01948]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0333 · Supporting & Related Material · Letter

ICR Extension Request for Steam Electric Questionnaire - SCANA Corporation [DCN SE00904]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0335 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Tenaska Inc [DCN SE00905]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0337 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Tri-State Generation and Transmission Association [DCN SE00906]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0338 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Westar Energy [DCN SE00907]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0340 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Wyandotte Municipal [DCN SE00908]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0342 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Lamar Light and Power [DCN SE00921]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0344 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - City of Hamilton Municipal Power Plant [DCN SE00940]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0349 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - Los Angeles Department of Water and Power (LADWP's) [DCN SE00941]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0350 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire - E. ON U.S. Louisville Gas & Electric Company [DCN SE00942]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0351 · Supporting & Related Material · E-mail

ICR Extension Request for Steam Electric Questionnaire [DCN SE01763]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0353 · Supporting & Related Material · E-mail

Bromides, TDS, and Radionuclides in the Allegheny River: A Possible Link with Marcellus Shale Operations [DCN SE03106]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0365 · Supporting & Related Material · Meeting Materials

Follow Up Emails to Ash Handling Companies on Conference Calls [DCN SE00063]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0392 · Supporting & Related Material · E-mail

Email to Kevin McDonough, United Conveyor Corporation, from Kurt Blohm Eastern Research Group, Inc. regarding Delivering Notes from EPA-UCC Conference Call [DCN SE00146]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0421 · Supporting & Related Material · E-mail

Notes from USEPA-UCC Conference Call with United Conveyor Corporation 1/6/2010 [DCN SE00146A1]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0422 · Supporting & Related Material · Meeting Materials

Email to Headwaters from Kurt Blohm, Eastern Research Group, Inc. regarding Delivering Notes from EPA-Headwaters Conference Call [DCN SE00148]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0423 · Supporting & Related Material · E-mail

Notes from USEPA-Headwaters Conference Call 1/6/2010 [DCN SE00148A1]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0424 · Supporting & Related Material · Meeting Materials

Email to Ronald Jordan, USEPA [DCN SE00180] 2-2-2010

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0425 · Supporting & Related Material · E-mail

Kingston Ash Recovery Project Non-Time-Critical Removal Action Embayment/Dredge Cell Action Memorandum [DCN SE03144]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0489 · Supporting & Related Material · Memorandum

Telecon Notes, SYNMAT Call to Discuss Combined Dewatering of Gypsum and Fly Ash [DCN SE01424]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0500 · Supporting & Related Material · Meeting Materials

Advisory on USEPA’s Issues in Valuing Mortality Risk Reduction [DCN SE03154]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0503 · Supporting & Related Material · Letter

Notes from Pre-Visit Call with Consumers Energy and Karn/Weadock Power Plants on September 14, 2009 [DCN SE00011]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0547 · Supporting & Related Material · Meeting Materials

Notes from Pre-Visit Call with Kinder Morgan Plant Personnel on September 16, 2009 [DCN SE00012]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0551 · Supporting & Related Material · Memorandum

Notes from Site Visit at TECO Energy's Polk Power Station on October 8, 2009 [DCN SE00071]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0554 · Supporting & Related Material · Meeting Materials

Email from Tim Lohner, AEP to Thomas J Finseth, Eastern Research Group, Inc. regarding MT ABMet System [DCN SE02009.A1]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0577 · Supporting & Related Material · E-mail

W. Smagula Letter, Public Service Co of NH to John King, Office of Ecosystem Protection USEPA RE: Public Service Co. of NH Merrimack Station, Bow NH Response to Informal EPA Request Planned State-of-the-Art FGD Wastewater Treatment System Suptl Info [DCN SE02010]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0578 · Supporting & Related Material · Letter

Teleconference Notes between Kevin McDonough & Mike Kippis, United Conveyor Corporation, Ron Jordan and Jezebele Alicea-Virella, USEPA, TJ Finseth, Elizabeth Sabol, ERG, Inc. RE: Ash Handling Conversions in the Industry [DCN SE02016]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0580 · Supporting & Related Material · Meeting Materials

Notes from Pre-Visit Call with DTE Energy and Monroe Plant Personnel on September 15, 2009 [DCN SE00013]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0591 · Supporting & Related Material · Meeting Materials

Email to Jezebele Alicea, USEPA: Monroe's Claim Stating Which Parts of the Site Visit Notes Attachments Should be Considered CBI [DCN SE00580]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0604 · Supporting & Related Material · E-mail

Draft Cape Fear Site Visit Notes Sent to Plant for Review [DCN SE00589]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0607 · Supporting & Related Material · Meeting Materials

Letter to Dean McDevitt, NiSource [DCN SE02058]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0681 · Supporting & Related Material · Letter

Memorandum to Ron Jordan, USEPA [DCN SE02059]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0682 · Supporting & Related Material · Memorandum

CBI - Final Site Visit Notes for Ohio Power Company's Gavin Plant [DCN SE02072]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0693 · Supporting & Related Material · Meeting Materials

Final Site Visit Notes: Dominion Resources Clover Power Station [DCN SE02074]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0695 · Supporting & Related Material · Meeting Materials

CBI - Final Site Visit Notes: Fayette Power Project/Sam Seymour Power Station [DCN SE02077]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0697 · Supporting & Related Material · Meeting Materials

Final Site Visit Notes: Kentucky Utilities Company's Ghent Generating Station [DCN SE02079]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0699 · Supporting & Related Material · Meeting Materials

CBI - Final Site Visit Notes: Louisville Gas & Electric Company's Trimble County Station [DCN SE02080]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0700 · Supporting & Related Material · Meeting Materials

Non CBI - Final Site Visit Notes: Louisville Gas & Electric Company's Trimble County Station on December 10, 2008 [DCN SE02081]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0701 · Supporting & Related Material · Meeting Materials

CBI - Final Site Visit Notes: Constellation Energy’s Brandon Shores Generating Station [DCN SE02089]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0704 · Supporting & Related Material · Meeting Materials

Final Site Visit Notes: Western Kentucky Energy’s Kenneth C. Coleman Station [DCN SE02094]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0705 · Supporting & Related Material · Meeting Materials

Non CBI - Final Site Visit Notes: Duke Energy's Wabash River Generating Station [DCN SE02096]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0707 · Supporting & Related Material · Meeting Materials

Letter to Joe Stanek, EME Homer City Generation L.P.: CBI Substantiation - Homer City Plant [DCN SE01345] 4/20/2012

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0711 · Supporting & Related Material · Letter

Letter to Stephen Frank, GenOn Energy: CBI Substantiation - Portland Generating Station [DCN SE01346] 4/20/2012

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0712 · Supporting & Related Material · Letter

Letter to Chantell Johnson, Tri-State Generation: CBI Substantiation - Craig Station and Escalante Station [DCN SE01347] 4/20/2012

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0713 · Supporting & Related Material · Letter

Letter to Michael Menne, Duck Creek Power Plant: CBI Substantiation - Duck Creek Power Plant [DCN SE01348] 4/20/2012

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0714 · Supporting & Related Material · Letter

Letter to Nathan Craig, Duke Energy: CBI Substantiation Duke Energy Plants [DCN SE01349[

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0715 · Supporting & Related Material · Letter

Letter to Joe Settles, EKPC Spurlock Station: CBI Substantiation, Spurlock Station [DCN SE01350]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0716 · Supporting & Related Material · Letter

Letter to Eric Strassler, USEPA: CBI Substantiation Letter Duck Creek Part F & G [DCN SE01415]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0717 · Supporting & Related Material · Letter

CBI: Letter to Robert Wood, USEPA: CBI Substantiation Letter Tri-State Generation Part F & G [DCN SE01416]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0718 · Supporting & Related Material · Letter

Email to Ronald Jordan, USEPA: Letter to CBI Substantiation Letter GenOn Energy Part F & G [DCN SE01417[

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0719 · Supporting & Related Material · E-mail

Letter to Robert Wood, USEPA: CBI Substantiation Letter Duke Energy Part F & G [DCN SE01418]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0720 · Supporting & Related Material · Letter

Letter to Eric Strassler, USEPA: CBI Substantiation Letter Martins Creek Part F & G [DCN SE01419]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0721 · Supporting & Related Material · Letter

Letter to Robert Wood, Acting Director, USEPA: CBI Substantiation Letter Homer City Part F & G [DCN SE01420]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0722 · Supporting & Related Material · Letter

CBI Letter to Eric Strassler, USEPA: CBI Substantiation Letter Merom Generating Station Part F & G [DCN SE 01421]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0723 · Supporting & Related Material · Letter

Email to Josh Hall, USEPA [DCN SE00488]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0724 · Supporting & Related Material · E-mail

Email to Josh Hall, USEPA [DCN SE00489]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0725 · Supporting & Related Material · E-mail

Teleconference between TJ Finseth, ERG, and Tim Lohner, American Electric Power, Re: FGD Systems and FGD Wastewater Treatment Systems Operation and Verification [DCN SE00066]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0726 · Supporting & Related Material · Meeting Materials

Non-CBI Teleconference between TJ Finseth, ERG, and Pete Kutzora, We Energies, Re: FGD Systems and FGD Wastewater Treatment Systems Operation and Verification [DCN SE00067]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0727 · Supporting & Related Material · Meeting Materials

Non-CBI Teleconference between TJ Finseth, ERG, Lydia Lambert, ERG, and Rich Beer, Reliant Energy, Re: FGD Systems and FGD Wastewater Treatment Systems Operation and Verification [DCN SE00068]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0728 · Supporting & Related Material · Meeting Materials

Teleconference between Kurt Blohm, ERG, and Jim Steiritz, Duke Energy, Re: Duke Energy’s W. H. Zimmer Power Station Flue Gas Desulfurization (FGD) and FGD Wastewater Treatment Systems [DCN SE00069]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0729 · Supporting & Related Material · Meeting Materials

Teleconference between Lydia Lambert, ERG, and Allen Palmer, Public Service Company of New Hampshire, Re: FGD Systems and FGD Wastewater Treatment Systems Operation and Verification [DCN SE00070]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0730 · Supporting & Related Material · Meeting Materials

Email to Josh Hall, USEPA [DCN SE00490]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0731 · Supporting & Related Material · E-mail

Memorandum to the Steam Electric Rulemaking Record: Analytical Database Memorandum [DCN SE02120]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0733 · Supporting & Related Material · Memorandum

Belews Creek Comments on Draft ELG Sampling Plan [DCN SE00514]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0735 · Supporting & Related Material · Letter

Letter to Nathan Craig, Duke Energy: Sampling Episode Report Letter Belews Creek Steam Station [DCN SE01375]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0737 · Supporting & Related Material · Letter

Follow Up Questions about FGD Wastewater Treatment System at Monroe Power Plant [DCN SE00133]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0739 · Supporting & Related Material · E-mail

Email to Joe Stanek Requesting Information on the FGD Wastewater Treatment System at Homer City Generating Station [DCN SE00134]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0740 · Supporting & Related Material · E-mail

Email to Kevin Young Requesting Information on the FGD Wastewater Treatment System at Big Bend Power Station [DCN SE00135]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0742 · Supporting & Related Material · E-mail

Letter to Ronald Jordan, USEPA: Plant Comments on Belews Creek Sampling Episode Report Letter [DCN SE01378]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0743 · Supporting & Related Material · Letter

Email to Kurt Blohm Delivering Responses to Request for Information on FGD Wastewater Treatment System at Big Bend Power Station [DCN SE00136]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0746 · Supporting & Related Material · E-mail

Teleconference between Kurt Blohm, ERG, and Kevin Young, Tampa Electric Company, Re: FGD Systems and FGD Wastewater Treatment Systems Operation and Verification [DCN SE00137]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0747 · Supporting & Related Material · Meeting Materials

Teleconference between Kurt Blohm, ERG, and Jason Brown, DTE Energy, Re: FGD Systems and FGD Wastewater Treatment Systems Operation and Verification at Monroe Power Plant [DCN SE00138]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0748 · Supporting & Related Material · Meeting Materials

Teleconference between Kurt Blohm, ERG, and Catherine Stewart, Constellation Energy, Re: FGD Systems and FGD Wastewater Treatment Systems Operation and Verification at Brandon Shores Generating Station [DCN SE00140]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0749 · Supporting & Related Material · Meeting Materials

Teleconference between Kurt Blohm, ERG, and Shannon Langley, Progress Energy, Re: FGD Systems and FGD Wastewater Treatment Systems Operation and Verification at Asheville Power Plant [DCN SE00141]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0750 · Supporting & Related Material · Meeting Materials

Teleconference between Kurt Blohm, ERG, and Walter Stone, Mirant Corporation, Re: FGD Systems and FGD Wastewater Treatment Systems Operation and Verification [DCN SE00142]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0751 · Supporting & Related Material · Meeting Materials

Teleconference between Kurt Blohm, ERG, and Jim Steiritz, Duke Energy, Re: FGD Systems and FGD Wastewater Treatment Systems Operation and Verification at Miami Fort Generating Station [DCN SE00143]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0752 · Supporting & Related Material · Meeting Materials

E-mail to Josh Hall, USEPA from Shannon Langley regarding Asheville Power Station [DCN SE00189]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0754 · Supporting & Related Material · E-mail

Letter to Dave Lee, We Energies: Sampling Episode Report Letter Pleasant Prairie Power Plant [DCN SE01409]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0756 · Supporting & Related Material · Letter

Letter to Ronald Jordan, USEPA from David M. Lee, Manager, Water Quality,We Energies regarding Plant Comments on Pleasant Prairie Sampling Episode Report Letter [DCN SE01412]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0759 · Supporting & Related Material · Letter

Letter to Ronald P. Jordan, USEPA/EAD, from Donna B. Hill, Chair, Effluent Guidelines Committee, Utility Water Act Group, (UWAG), regarding UWAG Comments on EPA Draft Generic Sampling and Analysis Plan for Steam Electric Power Plants [DCN SE00487]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0762 · Supporting & Related Material · Letter

Comments from We Energies on Pleasant Prairie Power Station Draft Sampling Plan on May 18, 2010 [DCN SE01456]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0763 · Supporting & Related Material · Letter

UWAG Presentation to USEPA Regarding USEPA's Sampling Program [SE00492]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0764 · Supporting & Related Material · Meeting Materials

Letter to Melanie Martin, Duke Energy Carolinas, from Josh Hall, USEPA/EAD [DCN SE00087]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0768 · Supporting & Related Material · Letter

Letter to Plant Manager, Duke Energy Ohio, Miami Fort Station from Mary T. Smith, Director, USEPA/EAD on July 30, 2010 [DCN SE00497]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0769 · Supporting & Related Material · Letter

Letter to Peggy Penner, Tampa Electric Company from Josh Hall, USEPA/EAD on November 12, 2009 [DCN SE00088]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0772 · Supporting & Related Material · Letter

Letter to Dawn Garber, Chesterfield Power Station from Josh Hall, USEPA/EAD/OW on November 12, 2009 [DCN SE00089]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0774 · Supporting & Related Material · Letter

Letter to Nathan Craig, Duke Energy from Mary T. Smith, Director, USEPA/EAD/OW; re: Sampling Episode Report Letter Miami Fort Station on December 15, 2011 [DCN SE01394]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0775 · Supporting & Related Material · Letter

Letter to Ronald Jordan, USEPA: Plant Comments on Miami Fort Sampling Episode Report on january 31, 2012 [DCN SE01396]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0777 · Supporting & Related Material · Letter

Letter to Rich Beer [DCN SE00090]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0779 · Supporting & Related Material · Letter

Letter to Randy Jones [DCN SE00091]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0780 · Supporting & Related Material · Letter

Letter to Joe Stanek [DCN SE00092]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0781 · Supporting & Related Material · Letter

Letter to Jeff Palmer [DCN SE00093]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0782 · Supporting & Related Material · Letter

Letter to Rob Muehlenkamp [DCN SE00094]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0783 · Supporting & Related Material · Letter

Letter to Dana Newcomb [DCN SE00095]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0785 · Supporting & Related Material · Letter

Letter to Nathan Craig, Duke Energy from Mary T. Smith, Director, USEPA/EAD RE: Sampling Episode Report Letter Allen Steam Station [DCN SE01368]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0791 · Supporting & Related Material · Letter

Letter to Ronald Jordan, USEPA: Plant Comments on Allen Sampling Episode Report Letter [DCN SE01371]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0794 · Supporting & Related Material · Letter

Comments from Duke Energy on Draft Sampling Plan for Allen Steam Station [DCN SE01427]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0796 · Supporting & Related Material · Letter

Letter to Ann Wearmouth, GenOn Energy: Sampling Episode Report Letter Dickerson Generating Station [DCN SE01382]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0799 · Supporting & Related Material · Letter

Letter to Ronald Jordan, USEPA/EAD from Ann O. Wearmouth, Environmental Engineer, GenOn, Mid Atlantic, LLC [DCN SE01384)]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0801 · Supporting & Related Material · Letter

Email from Ann Wearmouth, Mirant to Thomas Finseth et al. regarding Draft Dickerson Sampling Plan [DCN SE01442]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0804 · Supporting & Related Material · E-mail

Email to Ron Jordan, USEPA from Sara Marie Baldi, Environmental Operations and Compliance Group, GenOn Energy [DCN SE00596]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0806 · Supporting & Related Material · E-mail

Email to Ronald Jordan, USEPA from Sara Marie Baldi, Environmental Operations and Compliance Group, GenOn Energy, regarding, GenOn Keystone Generating Station [DCN SE01300]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0807 · Supporting & Related Material · E-mail

Letter to Sara Marie Baldi, GenOn Energy from Mary T. Smith, Director, USEPA/EAD [DCN SE01403]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0809 · Supporting & Related Material · Letter

Email from Sara Maria Baldi to Thomas Finseth, ERG regarding Draft Keystone Sampling Plan [DCN SE01445]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0810 · Supporting & Related Material · Letter

Letter from Mary Smith, USEPA [DCN SE00407]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0811 · Supporting & Related Material · Letter

Letter to Joe Lapcevic, Allegheny Energy: Sampling Episode Report Letter Hatfield's Ferry Power Station [DCN SE01388]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0814 · Supporting & Related Material · Letter

Letter to Ronald P. Jordan, USEPA: Plant Comments on Hatfield's Ferry Sampling Episode Report [DCN SE01390]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0816 · Supporting & Related Material · Letter

Email to Donna B. Hill, UWAG from Ronald Jordan, USEPA [DCN SE00316]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0824 · Supporting & Related Material · E-mail

Letter to Ronald P. Jordan and Richard W. Reding, USEPA/EAD from Donna B. Hill, Chair, Effluent Guidelines Committee, Utility Water Act Group (UWAG) [DCN SE00317]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0825 · Supporting & Related Material · Letter

Letter to Ronald P. Jordan and Joshua Hall, USEPA/EAD from Donna B. Hill, Chair, Effluent Guidelines Committee, Utility Water Act Group (UWAG) [DCN SE00410]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0829 · Supporting & Related Material · Letter

Final Steam Study Data Review Notes 365.1 [DCN SE00446]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0851 · Supporting & Related Material · Meeting Materials

Letter from Mary Smith, USEPA [DCN SE00415]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0858 · Supporting & Related Material · Letter

Letter from Mary Smith, USEPA [DCN SE00416]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0859 · Supporting & Related Material · Letter

Letter from Mary Smith, USEPA [DCN SE00496]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0860 · Supporting & Related Material · Letter

Letter from Mary Smith, USEPA [DCN SE00498]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0861 · Supporting & Related Material · Letter

Letter from Mary Smith, Director, Engineering and Analysis Division, USEPA [DCN SE00499]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0862 · Supporting & Related Material · Letter

Letter from Mary Smith, Director, Engineering and Analysis, USEPA [DCN SE00500]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0863 · Supporting & Related Material · Letter

Letter from Nathan Craig, Duke Energy, to TJ Finseth, ERG [DCN SE00562]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0866 · Supporting & Related Material · Letter

Non-CBI Wabash River Engineering Data [DCN SE01287]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0871 · Supporting & Related Material · Letter

Letter to Ann Wearmouth, GenOn Energy: CWA 308 Sampling Events [DCN SE01315]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0874 · Supporting & Related Material · Letter

Letter to Nathan Craig, Duke Energy: CWA 308 Sampling Events [DCN SE01316]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0875 · Supporting & Related Material · Letter

Letter to Joe Lapcevic, Allegheny Energy: CWA 308 Sampling Events [DCN SE01317]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0876 · Supporting & Related Material · Letter

Letter to Thomas Mackin, Iatan: CWA 308 Sampling Events [DCN SE01318]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0877 · Supporting & Related Material · Letter

Letter to Sara Marie Baldi, RRI Energy: CWA 308 Sampling Events [DCN SE01319]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0878 · Supporting & Related Material · Letter

Letter to Tim Lohner, American Electric Power: Mountaineer CWA 308 Sampling Events [DCN SE01320]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0879 · Supporting & Related Material · Letter

Letter to David Lee, WE Energies: CWA 308 Sampling Events [DCN SE01321]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0880 · Supporting & Related Material · Letter

Letter to Karen Sheffield, Polk Power Station: CWA 308 Sampling Events [DCN SE01322]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0881 · Supporting & Related Material · Letter

Letter to Richard Payonk, Wabash River Power Station: CWA 308 Sampling Cover Letter [DCN SE01323]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0882 · Supporting & Related Material · Letter

Letter to Robert K. Wood, Acting Director, USEPA/EAD/OW from Timothy W. Lohner, Environmental Services, American Electric Power (AEP) [DCN SE01324]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0883 · Supporting & Related Material · Letter

Letter to Robert K. Wood, Acting Director, USEPA from Terry L. Eastley, Sr. Environmental Specialist, Environmental, Health, and Safety, Tampa Electric Company (TEC) RE: Request for Extension on Comment Period from TEC on Clean Water Act (CWA) 308 Sampling Report for Polk on April 23, 2012 [DCN SE01333]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0887 · Supporting & Related Material · Letter

Email to Ronald Jordan, USEPA from Tim Lohner, American Electric Power (AEP) RE: EPA Request for Sampling of Carbon Capture Wastewater at Mountaineer on December 6, 2010 [DCN SE01335]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0888 · Supporting & Related Material · E-mail

Letter to Ronald Jordan, USEPA: Final CWA 308 Sampling Comments - Dickerson [DCN SE01341]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0889 · Supporting & Related Material · Letter

Letter to Robert K. Wood, Acting Director, USEPA from David Mitchell, Managing Director, Environmental, Duke Energy RE: Final CWA 308 Sampling CBI Substantiation on April 30, 2012 [DCN SE01342]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0890 · Supporting & Related Material · Letter

Letter to Ronald P. Jordan, USEPA from Joseph P. Lapcevic, Sr. Scientist, First Energy RE: Hatfield's Ferry Data: Monthly Sampling Events CWA 308 on April 30, 2012 [DCN SE01343]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0891 · Supporting & Related Material · Letter

Letter to Ronald P. Jordan, USEPA from David M. Lee, Manager, Water Quality, We Energies RE: Pleasant Prairie Monitoring Data - Monthly Sampling Events CWA 308 on April 30, 2012 [DCN SE01344]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0892 · Supporting & Related Material · Letter

Letter to Ronald P. Jordan, USEPA from Sara Marie Baldi, Senior Environmental Specialist, GenOn RE: Final CWA 308 Sampling Request for Extension - Keystone on April 12, 2012 [DCN SE01351]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0893 · Supporting & Related Material · Letter

Letter to Ronald Jordan, USEPA: Final CWA 308 Sampling Comments - Miami Fort [DCN SE01352]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0894 · Supporting & Related Material · Letter

Letter to Ronald Jordan, USEPA: Final CWA 308 Sampling Comments - Belews Creek [DCN SE01353]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0895 · Supporting & Related Material · Letter

Letter to Ronald Jordan, USEPA: Final CWA 308 Sampling Comments - Allen [DCN SE01354]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0896 · Supporting & Related Material · Letter

Letter to Robert Wood, Acting Director, USEPA: Final CWA 308 Sampling Comments - Polk [DCN SE01355]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0897 · Supporting & Related Material · Letter

Letter to Ronald Jordan, USEPA: Final CWA 308 Sampling Comments - Keystone [DCN SE01359]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0900 · Supporting & Related Material · Letter

Letter to Terry Eastley, Tampa Electric Company: Final CWA 308 Sampling Comment Extension - Polk [DCN SE01360]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0901 · Supporting & Related Material · Letter

Email to Ronald Jordan, USEPA: Final CWA 308 Sampling CBI Substantiation - Allen and Belews Creek [DCN SE01361]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0902 · Supporting & Related Material · E-mail

Email to Nathan Craig, Duke Energy: Final CWA 308 Sampling Comment Extension - Duke Energy [DCN SE01362]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0903 · Supporting & Related Material · E-mail

Steam Electric ELG Rulemaking - UMRA and Federalism Implications: Consultation Meeting [DCN SE03286]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0907 · Supporting & Related Material · Meeting Materials

Steam Electric ELG Rulemaking - UMRA and Federalism Implications: Consultation Meeting (Supplemental Information) [DCN SE03287]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0908 · Supporting & Related Material · Meeting Materials

Steam Electric Utility ELGs Briefing Participants [DCN SE03289]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0910 · Supporting & Related Material · Meeting Materials

Re: UMRA/Federalism Consultation on Steam Electric Rulemaking (Effluent Limitations Guidelines for Steam Electric Generation) (APPA-NRECA) [DCN SE03290]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0911 · Supporting & Related Material · Letter

Re: Meeting with Mayors and City Officials on EPA's Effluent Limitations Guidelines for the Steam Electric Industry (Clinton) [DCN SE03291]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0912 · Supporting & Related Material · Letter

Re: Meeting with Mayors and City Officials on EPA's Effluent Limitations Guidelines for the Steam Electric Industry (Independence) [DCN SE03292]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0913 · Supporting & Related Material · Letter

Re: Meeting with Mayors and City Officials on EPA's Effluent Limitations Guidelines for the Steam Electric Industry (KUA) [DCN SE03293]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0914 · Supporting & Related Material · Letter

Comments of the Lafayette Utilities System [DCN SE03294]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0915 · Supporting & Related Material · Letter

Re: Comments of Michigan Public Power on USEPA's Planned Effluent Limitations & Guidelines for Steam Electric Generators (MMEA) [DCN SE03295]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0916 · Supporting & Related Material · Letter

Re: Meeting with Mayors and City Officials on USEPA's Effluent Limitations Guidelines for the Steam Electric Industry (Newberry) [DCN SE03296]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0917 · Supporting & Related Material · Letter

Re: Meeting with Mayors and City Officials on USEPA's Effluent Limitations Guidelines for the Steam Electric Industry (Sioux Center) [DCN SE03297]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0918 · Supporting & Related Material · Letter

Letter from Mary Smith, USEPA [DCN SE00493]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0919 · Supporting & Related Material · Letter

Letter from Mary Smith, USEPA [DCN SE00494]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0920 · Supporting & Related Material · Letter

Letter from Mary Smith, USEPA [DCN SE00495]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0921 · Supporting & Related Material · Letter

Letter Ronald Jordan, USEPA, Plant Comments on Keystone Sampling Episode Report [DCN SE01405]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-0923 · Supporting & Related Material · Letter

Email to Ron Jordan, USEPA [DCN SE00158]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1198 · Supporting & Related Material · E-mail

Email to State Government Representatives [DCN SE00233]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1199 · Supporting & Related Material · E-mail

Email to Ron Jordan, USEPA [DCN SE 00235]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1200 · Supporting & Related Material · E-mail

Notes from ERG-Headwaters Conference Call [DCN SE00331]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1201 · Supporting & Related Material · Meeting Materials

Notes from ERG-Delta Ducon Conference Call [DCN SE00332]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1202 · Supporting & Related Material · Meeting Materials

Notes from ERG-UCC Conference Call [DCN SE00333]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1203 · Supporting & Related Material · Meeting Materials

Email to Patricia Hutchins, EIA [DCN SE00372]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1204 · Supporting & Related Material · E-mail

Email to Becky Schwantes, Eastern Research Group (ERG) [DCN SE00373]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1205 · Supporting & Related Material · E-mail

Email to Steam Electric Companies [DCN SE00411]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1210 · Supporting & Related Material · E-mail

Email to Defenders of Wildlife, Sierra Club, Environmental Integrity, Earth Justice, and Natural Resources Defense Council [DCN SE00412]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1211 · Supporting & Related Material · E-mail

Email to Mary Smith, USEPA [DCN SE00511]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1215 · Supporting & Related Material · E-mail

Email from Bill Batchelor Transmitting Dissertation [DCN SE00338]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1222 · Supporting & Related Material · E-mail

Letter to Ron Jordan, USEPA from Paul Chu, Senior Project Manager, Electric Power Research Institute (EPRI) [DCN SE00409]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1224 · Supporting & Related Material · Letter

CBI_Memorandum to Ron Jordan, USEPA: FGD Performance Data Summary Memorandum - Vendor Contacts to Ron Jordan, U.S. EPA [DCN SE01313]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1225 · Supporting & Related Material · Memorandum

Corrections made to the Belews Creek data provided by Duke Energy [DCN SE01810]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1228 · Supporting & Related Material · Memorandum

Email Detailing EPA's Analysis and Corrections to State Provided Sampling Data for Progress Energy's Roxboro Plant [DCN SE01813]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1229 · Supporting & Related Material · E-mail

Letter from Elizabeth Aldridge (Hunton & Williams) to Ronald Jordan (USEPA) regarding UWAG Form 2C Database [DCN SE02918]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1237 · Supporting & Related Material · Letter

Email Correspondence from Gary Mooney, Clyde Bergemann Power Group (CBPG) to Jezebele Alicea, USEPA, in response to the copyright permission letter sent regarding CPBG diagrams for the Steam Electric TDD [DCN SE02948]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1454 · Supporting & Related Material · E-mail

Letter from Steve Stultz, Babcock & Wilcox, to Jezebele Alicea, USEPA, in response to the copyright permission letter sent regarding the Babcock and Wilcox diagram for the Steam Electric TDD [DCN SE02949]

Correspondence2013-06-07 · EPA-HQ-OW-2009-0819-1455 · Supporting & Related Material · Letter

Telecon Notes - Call to Discuss FGMC System at Louisville Gas & Electric, Co.'s Trimble County Power Plant [DCN SE02962]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1456 · Supporting & Related Material · Meeting Materials

Telecon Notes - Call to Discuss FGMC System at Northern States Power, Co.'s Sherburne County Power Plant [DCN SE02963]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1457 · Supporting & Related Material · Meeting Materials

Telecon Notes - Call to Discuss FGMC System at Ameren Energy Generating, Co.'s Newton and Meredosia Power Plants [DCN SE02964]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1458 · Supporting & Related Material · Meeting Materials

Telecon Notes - Call to Discuss the Wet Oil Ash Handling system at Georgia Power, Co.' s McManus Power Plant [DCN SE02965]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1459 · Supporting & Related Material · Meeting Materials

Letter from Kevin McDonough, UCC, to Jezebele Alicea, EPA, RE: Copyright Permission Request – United Conveyor Corporation (UCC®) [DCN SE02968]

Correspondence2013-06-07 · EPA-HQ-OW-2009-0819-1460 · Supporting & Related Material · Letter

USEPA - National Tribal Water Council Outreach [DCN SE03813]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1765 · Supporting & Related Material · Meeting Materials

USEPA - National Tribal Caucus Outreach [DCN SE03814]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1766 · Supporting & Related Material · Meeting Materials

Steam Electric Tribal Consultation National Call [DCN SE03815]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1767 · Supporting & Related Material · Meeting Materials

Notification of Consultation and Coordination on Steam Electric Power Generating Effluent Limitations Guidelines and Standards Proposed Rulemaking [DCN SE03816]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1768 · Supporting & Related Material · Letter

Time-Sensitive USEPA Office of Water Information and Tribal Participation Opportunities March/April 2012 [DCN SE03817]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1769 · Supporting & Related Material · E-mail

U.S. EPA - Tribal Consultation Process [DCN SE03818]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1770 · Supporting & Related Material · Meeting Materials

Independence E-mail Correspondence with Maryt Smith [DCN SE03298]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1771 · Supporting & Related Material · E-mail

Email to Steam Electric Plants - RE: Steam Electric Questionnaire - Frequently Asked Questions [DCN SE00406]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1772 · Supporting & Related Material · E-mail

Draft Monfalcone Site Visit Notes Draft to Plant [DCN SE02904]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1782 · Supporting & Related Material · Meeting Materials

Attachments to Draft Monfalcone Site Visit Notes Draft to Plant [DCN SE03792]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1783 · Supporting & Related Material · Meeting Materials

Plant Comments on Draft Monfalcone Site Visit Notes [DCN SE03793]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1785 · Supporting & Related Material · Meeting Materials

Letter to Javier Ceballos, HPD Delivery of Draft Monfalcone Site Visit Notes [CN SE02903]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1786 · Supporting & Related Material · Letter

E-mail Delivering Plant Comments on Draft Monfalcone Site Visit Notes [DCN SE03794]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1788 · Supporting & Related Material · E-mail

Letter to Dr. Francesco Giorgianni, Head of Public Affairs EPA Sampling Cover Letter Enel [DCN SE01340]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1793 · Supporting & Related Material · Letter

CBI Cardinal Plant Wastewater Treatment System Site Visit Presentation [DCN SE00153]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1800 · Supporting & Related Material · Meeting Materials

Hatfield's Ferry FGD Wastewater Treatment Process Flow Diagrams [DCN SE00156]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1803 · Supporting & Related Material · Meeting Materials

E-mail from Timothy Lohner, AEP, to Thomas Finseth, ERG [DCN SE03656]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1817 · Supporting & Related Material · E-mail

Plant Comments on Draft Hatfield's Ferry Site Visit Notes [DCN SE03662]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1824 · Supporting & Related Material · E-mail

E-mail Clarifying CBI in Plant Comments Delivery E-mails - Hatfield's Ferry [DCN SE03663]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1826 · Supporting & Related Material · E-mail

EPA Visit to Brandon Shores FGD WWTP Agenda [DCN SE00261]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1831 · Supporting & Related Material · Meeting Materials

Email to set up EPA site visit to Dickerson [DCN SE00265]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1837 · Supporting & Related Material · E-mail

E-mail Clarifying CBI in Plant Comments Delivery E-mails - Fort Martin [DCN SE03670]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1838 · Supporting & Related Material · E-mail

Letter from Paul Ling, KCP&L [DCN SE00379]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1843 · Supporting & Related Material · Letter

Ameren Telecon [DCN SE00420]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1845 · Supporting & Related Material · Meeting Materials

CBI Letter to Richard Hamblin, Permits Manager (NPDES): Grey Water Treatment Process Description for Edwardsport Generating Station [DCN SE00539]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1846 · Supporting & Related Material · Letter

Letter from Patrick McCabe, Duke Energy, to Ronald Jordan, USEPA [DCN SE00561]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1847 · Supporting & Related Material · Meeting Materials

CBI Letter to TJ Finseth [DCN SE00597]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1849 · Supporting & Related Material · Letter

E-mail from Thomas Weissinger, Raven Power, to Thomas Finseth, ERG [DCN SE03689]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1857 · Supporting & Related Material · E-mail

Cover Letter Delivering Plant Comments for Draft Edwardsport Site Visit Notes [DCN SE03700]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1864 · Supporting & Related Material · Letter

Draft Keystone Site Visit Notes Plant Review [DCN SE01827]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1865 · Supporting & Related Material · Meeting Materials

Draft Dickerson Site Visit Notes Plant Review [DCN SE01828]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1869 · Supporting & Related Material · Meeting Materials

Draft Duck Creek Site Visit Notes Sent to Plant for Review [DCN SE03708]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1870 · Supporting & Related Material · Meeting Materials

Draft Brandon Shores Site Visit Notes Plant Review [DCN SE01829]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1871 · Supporting & Related Material · Meeting Materials

Draft Cardinal Site Visit Notes Plant Review [DCN SE01830]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1872 · Supporting & Related Material · Meeting Materials

Draft Fort Martin Site Visit Notes Plant Review [DCN SE01831]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1873 · Supporting & Related Material · Meeting Materials

Draft Hatfield's Ferry Site Visit Notes Plant Review [DCN SE01832]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1874 · Supporting & Related Material · Meeting Materials

Letter from Michael F. Bollinger, Ameren, to Jezebele Alicea, USEPA on December 6, 2012 [DCN SE03710]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1875 · Supporting & Related Material · Letter

E-mail Delivering Plant Comments on Draft Iatan Site Visit Notes [DCN SE03724]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1885 · Supporting & Related Material · E-mail

E-mail from Christian Kiernan to Thomas Finseth [DCN SE03762]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1886 · Supporting & Related Material · E-mail

CBI Attachment to WVPA Wabash River Site Visit Notes - Plant Comments [DCN SE02026]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1892 · Supporting & Related Material · Meeting Materials

CBI Draft Edwardsport Site Visit Notes Draft to Plant [DCN SE02049]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1896 · Supporting & Related Material · Meeting Materials

Attachments to Draft Wateree Site Visit Notes Sent to Plant for Review [DCN SE03776]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1906 · Supporting & Related Material · Meeting Materials

Email to Thomas Finseth, ERG et al. from Joseph Stanek, Environmental Manager, EME Homer City Generation, LP on November 13, 2012 - [DCN SE03744]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1907 · Supporting & Related Material · E-mail

Final Homer City Site Visit Notes [DCN SE03745]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1908 · Supporting & Related Material · Meeting Materials

Draft Conemaugh Site Visit Notes Sent to Plant for Review [DCN SE03747]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1910 · Supporting & Related Material · Meeting Materials

Plant Comments on Draft Wateree Site Visit Notes [DCN SE03777]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1915 · Supporting & Related Material · Meeting Materials

Draft McMeekin Site Visit Notes Sent to Plant for Review [DCN SE03785]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1918 · Supporting & Related Material · Meeting Materials

Attachments to Draft McMeekin Site Visit Notes Sent to Plant for Review [DCN SE03785A1]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1919 · Supporting & Related Material · Meeting Materials

Letter from Joseph Hermann, Covanta Fairfax Inc., to TJ Finseth, ERG [DCN SE03603]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1928 · Supporting & Related Material · Letter

Draft Covanta Site Visit Notes Sent to Plant for Review [DCN SE03606]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1929 · Supporting & Related Material · Letter

Cover Letter Delivering Plant Comments for draft Gibson Site Visit Notes [DCN SE03617]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1934 · Supporting & Related Material · Letter

Non-CBI Plant Comments on Draft Gibson Site Visit Notes [DCN SE03621]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1935 · Supporting & Related Material · Meeting Materials

E-mail Delivering Draft Wabash River Site Visit Notes to Plant [DCN SE03629]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1939 · Supporting & Related Material · Meeting Materials

E-mail Delivering Non CBI Plant Comments for Wabash Plant [DCN SE03632]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1940 · Supporting & Related Material · Meeting Materials

E-mail Clarifying CBI in Plant Comments Delivery E-mails [DCN SE03633]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1941 · Supporting & Related Material · E-mail

Non-CBI Plant Comments on Draft Wabash River Site Visit Notes [DCN SE03634]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1942 · Supporting & Related Material · Meeting Materials

Letter Delivering CBI Plant Comments for Wabash River Plant [DCN SE03635]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1943 · Supporting & Related Material · Meeting Materials

E-mail From Terry Hogan, WVPA, to Thomas Finseth, ERG [DCN SE03637]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1944 · Supporting & Related Material · E-mail

Non-CBI Attachments to Final Wabash River Site Visit Notes [DCN SE03640]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1947 · Supporting & Related Material · Meeting Materials

Plant Comments on Draft Keystone Site Visit Notes [DCN SE03642]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1948 · Supporting & Related Material · Meeting Materials

E-mail from Sara Marie Baldi, GenOn Energy, to Thomas Finseth, ERG DCN SE03643]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1949 · Supporting & Related Material · E-mail

Letter from Timothy Lohner, AEP, to Jezebele Alicea, USEPA [DCN SE03647]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1950 · Supporting & Related Material · Letter

Plant Comments on Draft Cardinal Site Visit Notes [DCN SE03648]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1951 · Supporting & Related Material · Meeting Materials

Memorandum to Ronald Jordan: Effluent Limitations for FGD Wastewater, Gasification Wastewater, and Combustion Residual Leachate for the Proposed Effluent Limitations Guidelines and Standards for the Steam Electric Rulemaking [DCN SE01999]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1953 · Supporting & Related Material · Memorandum

Memorandum to Steam Electric Rulemaking Record: Assessment of Effluent Limitations and Standards with No Baseline Substitution for the Steam Electric Rulemaking [DCN SE02000]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1954 · Supporting & Related Material · Memorandum

Supplemental Costs and Loads Documentation [DCN SE01825]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1958 · Supporting & Related Material · Memorandum

Memorandum to Cuc Schroeder: Serial Correlations for Steam Electric with and without adjustment for baseline values [EP-C-10-023 WA 2-6 (Steam Electric)] [DCN SE02001]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1963 · Supporting & Related Material · Memorandum

CBI GE Vendor Request [DCN SE01010]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1972 · Supporting & Related Material · Letter

Teleconference Notes between Mark Aron, Black & Veatch and TJ Finseth, ERG, RE: Bottom Ash Installations [DCN SE02982]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1997 · Supporting & Related Material · Meeting Materials

ERG Followup Questions to GE Biotreatment Cost Data [DCN SE01011]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-1999 · Supporting & Related Material · Memorandum

Heat Exchanger Vendor Quote - Carotek [DCN SE01014]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2001 · Supporting & Related Material · E-mail

Email Correspondence between Kevin McDonough, United Conveyor Corporation (UCC) and Elizabeth Sabol, Eastern Research Group, Inc. RE: Ash Handling Data Request [DCN SE02018]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2005 · Supporting & Related Material · E-mail

Notes from Teleconference between Craig Fleming, Gary Mooney, Ron Grabowski, Clyde Bergemann Power Group (CBPG), Ron Jordan, USEPA, TJ Finseth, Elizabeth Sabol, ERG, Inc. RE: Conversion Costs for Wet to Dry Bottom Ash Handling [DCN SE02020]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2006 · Supporting & Related Material · Meeting Materials

Bottom Ash Handling Conversion Cost Data [DCN SE02021]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2007 · Supporting & Related Material · E-mail

CBI Teleconference between Tim Michel, Milestone, Inc. and Kavya Kasturi, Eastern Research Group, Inc. Re: Milestone's Mercury Analyzers [DCN SE02031]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2071 · Supporting & Related Material · Meeting Materials

Email Correspondence between Kevin McDonough, UCC, and Elizabeth Sabol, ERG. RE: Confidential Footer Language [DCN SE03866]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2072 · Supporting & Related Material · E-mail

Email Correspondence between Ron Grabowski, Clyde Bergemann Power Group (CBPG) and Elizabeth Sabol, Eastern Research Group, Inc. RE: Ash Handling Data Request [DCN SE02022]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2073 · Supporting & Related Material · E-mail

CH2MHill Memorandum: Planning-Level Cost Estimates for Landfill Options [DCN SE02954]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2078 · Supporting & Related Material · Memorandum

Email with Dennis Blauser, Marietta Silos and Elizabeth Sabol, ERG, RE: Concrete Silo Costs and Email Footer Language [DCN SE03812]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2081 · Supporting & Related Material · E-mail

Email to Elizabeth Sabol, Eastern Research Group, from Rick Baker, Eastern Research Group, RE: Fuel/Emission Factors for Dump Trucks [DCN SE02960]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2084 · Supporting & Related Material · E-mail

Memorandum of the Conservation Law Foundation: Investigation of Scrubber Costs and Recovery for the Merrimack Station [DCN SE03589]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2089 · Supporting & Related Material · Memorandum

CBI Notes from Call with GE on 4/19/2011 [DCN SE01022]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2101 · Supporting & Related Material · Meeting Materials

CBI Notes from Call with GE on 6/28/2011 [DCN SE01023]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2102 · Supporting & Related Material · Meeting Materials

Email Correspondence from Ronald Breton, GZA Geoenvironmental, Inc. to Bruce Kudrick, Hooksett Sewer Commission, RE: Wastewater Discharge Monitoring Report (September 2012) for Merrimack Station [DCN SE03587]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2106 · Supporting & Related Material · E-mail

Email to Ron Jordan, USEPA, Re: Questionable Mercury Data - Allen and Belews Creek [DCN SE03591]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2107 · Supporting & Related Material · E-mail

CBI Exhibit 3 of Plant Comments on Gibson Site Visit Notes [DCN SE03836]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2109 · Supporting & Related Material · Meeting Materials

E-mail from Mark Ferguson, SCE&G, to Daisy Wang, ERG, Regarding Site Visit Notes Information Removed [DCN SE03862]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2110 · Supporting & Related Material · E-mail

Notes on Groundwater Information Removed from Wateree Site Visit Notes Sent to Plant [DCN SE03863]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2111 · Supporting & Related Material · Meeting Materials

Non-CBI Memorandum to Ron Jordan, USEPA: FGD Performance Data Summary Memorandum - Vendor Contacts to Ron Jordan, USEPA [DCN SE03867]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2112 · Supporting & Related Material · Memorandum

Memorandum to the Steam Electric Rulemaking Record: Surface Impoundment Listings Supporting the Steam Electric Rulemaking [DCN SE03811]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2123 · Supporting & Related Material · Memorandum

Memorandum to the Steam Electric Rulemaking Record: Steam Electric Questionnaire Extraction Methodology and Program Code [DCN SE03832]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2125 · Supporting & Related Material · Memorandum

Memorandum to the Steam Electric Rulemaking Record: Status of Biological Treatment Systems to Remove Selenium [DCN SE03874]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2127 · Supporting & Related Material · Memorandum

Email: Request for Wastewater Sampling Data [DCN SE03883]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2128 · Supporting & Related Material · E-mail

Memorandum to the Steam Electric Rulemaking Record: Steam Electric Effluent Guidelines Non-Water Quality Impacts [DCN 02025]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2133 · Supporting & Related Material · Memorandum

Memorandum to the Steam Electric Rulemaking Record: Analysis of Differences Between the Data Set Used for Limitations Development and the Data Set Used for Loadings [DCN SE02122]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2135 · Supporting & Related Material · Memorandum

CBI Notes from EPA Conference Call on January 22, 2009 with Siemens Regarding FGD Wastewater Treatment Systems [DCN SE03953]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2136 · Supporting & Related Material · Meeting Materials

Presentation from Conference Call on January 16, 2009 with Southern Company and EPA Regarding FGD Wastewater Treatment Evaluations [DCN SE03954]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2137 · Supporting & Related Material · Meeting Materials

CBI Letter to Ron Jordan [DCN SE03955]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2138 · Supporting & Related Material · Letter

CBI Notes from EPA Meeting on June 5, 2008 with HPD/Veolia Water Solutions and Technologies to Discuss FGD Wastewater Treatment [DCN SE03957]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2139 · Supporting & Related Material · Meeting Materials

Notes from EPA Meeting on June 5, 2008 with HPD/Veolia Water Solutions and Technologies to Discuss FGD Wastewater Treatment [DCN SE03856]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2140 · Supporting & Related Material · Meeting Materials

Memorandum to the Rulemaking Record: Methodologies for Estimating Costs and Pollutant Removals for Steam Electric ELG Regulatory Option 4a on April 15, 2013 - [DCN SE03834]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2141 · Supporting & Related Material · Memorandum

CBI Memorandum to Bill Swietlik, RE: Water Quality Model: Plant and Receiving Water Characteristics - [DCN SE01955]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2142 · Supporting & Related Material · Memorandum

Memorandum to the Steam Electric Rulemaking Record: Methodologies for Estimating Costs and Pollutant Removals for Steam Electric ELG Regulatory Options 3a and 3b - [DCN SE03881]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2145 · Supporting & Related Material · Memorandum

Memorandum to the Record: Flue Gas Desulfurization Future Profile Sensitivity Analysis [DCN SE01989]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2148 · Supporting & Related Material · Memorandum

Memorandum to Steam Electric Rulemaking Record: Changes to Industry Profile for Steam Electric Generating Units Updates [DCN SE02033]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2149 · Supporting & Related Material · Memorandum

Memorandum to the Steam Electric Rulemaking Record: Avoided Impoundment Failures Memorandum [DCN SE02121]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2150 · Supporting & Related Material · Memorandum

Memorandum to the Steam Electric Rulemaking Record: Pollutants of Concern Memorandum [DCN SE02124]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2151 · Supporting & Related Material · Memorandum

Memorandum to the Steam Electric Rulemaking Record: Pond Closure Analysis Memorandum [DCN SE02125]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2152 · Supporting & Related Material · Memorandum

Memorandum to the Steam Electric Rulemaking Record: Pond Closure Costs [DCN SE02126]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2153 · Supporting & Related Material · Memorandum

Memorandum to the Steam Electric Rulemaking Record: Additional Industry Profile Changes for Steam Electric Generating Units [DCN SE02133]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2154 · Supporting & Related Material · Memorandum

List of Survey and Supplemental files for the 2010 Steam Electric Questionnaire, Part I – Economic and Financial Data [DCN SE03303]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2167 · Supporting & Related Material · Memorandum

Memorandum to the Steam Electric Rulemaking Record: Evaluation of Chemical Precipitation Costs for Ash Transport Water [DCN SE03869]

CorrespondenceHeld2013-06-07 · EPA-HQ-OW-2009-0819-2182 · Supporting & Related Material · Memorandum

Showing the first 400. Use the JSON download for the full list.

OIRA reviews (2)

Proposed Rulereceived 2013-01-15, concluded 2013-04-19 · Statutory or Judicial Deadline · econ. significant · major
Final Rulereceived 2015-07-02, concluded 2015-09-29 · Consistent with Change · econ. significant · major