Policy Replication

← Rulemakings

Revisions to the Underground Injection Control Regulations for Class V Injection Wells

RIN 2040-AB83 · Underground Injection Control Regulations for Class V Injection Wells,; ENVIRONMENTAL PROTECTION AGENCY · 119 references in its rule and RIA documents

A rulemaking follows one regulatory action through all its stages. A stage often has several Federal Register documents (the proposal itself, comment-period extensions, meeting notices, supplemental proposals, corrections), the regulatory impact analysis can be several files for each of the proposed and final rule, and an agency may keep more than one docket. Each document says why it is in this rulemaking and how sure that link is.

Complete Every stage OIRA reviewed is here.

23 documents in this rulemaking.
Pre-rulenoneNo OIRA review
Proposed ruleheldOIRA review 1995-07-17, 1998-06-04 · 3 documents
Interim final rulenoneNo OIRA review
Final ruleheldOIRA review 1999-08-24 · 1 document
Regulatory impact analysis15 files
Docket documents82 of 172 held1 docket; public comments not listed

Proposed rule stage: Federal Register documents (3)

Class V WellsRegulatory Determination and Minor Revisions to the Underground Injection Control Regulations; Technical Correction to the Regulations for Class I Wells

Proposed rule (NPRM)1995-08-28 · FR 95-20765 · ENVIRONMENTAL PROTECTION AGENCY · 7 references
Federal Register action: Proposed rule.
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Revisions to the Underground Injection Control Regulations for Class V Injection Wells

Proposed rule (NPRM)1998-07-29 · FR 98-19936 · ENVIRONMENTAL PROTECTION AGENCY · 15 references
Federal Register action: Proposed rule.
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Reopening of Comment Period on Revisions to the Underground Injection Control Regulations for Class V Injection Wells

Comment period extended or reopened1998-09-29 · FR 98-26008 · ENVIRONMENTAL PROTECTION AGENCY
Federal Register action: Proposed rule; notice of reopening of comment period.
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Final rule stage: Federal Register documents (1)

Revisions to the Underground Injection Control Regulations for Class V Injection Wells

Final rule1999-12-07 · FR 99-31048 · Underground Injection Control Regulations for Class V Injection Wells,; ENVIRONMENTAL PROTECTION AGENCY · 7 references
Federal Register action: Final rule.
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Regulatory impact analyses (15)

For the proposed rule

Economic Analysis for the Proposed Revisions to Underground Injection Control Regulations for Class V Injection Wells Volume 1 [W-98-05 I-B-16]

RIAundated · Regulatory impact analysis · EPA
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Economic Analysis for the Proposed Revisions to Underground Injection Control Regulations for Class V Injection Wells, Addendum 1 [I-B.21] (Part 1)

RIA2004-01-07 · Regulatory impact analysis · EPA
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Economic Analysis for the Proposed Revisions to Underground Injection Control Regulations for Class V Injection Wells [I-B.20] (Part 6)

RIA2005-01-07 · Regulatory impact analysis · EPA
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Economic Analysis for the Proposed Revisions to Underground Injection Control Regulations for Class V Injection Wells (Part 1) [W-98-05 I-B-20]

RIA2005-01-07 · Regulatory impact analysis · EPA
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Economic Analysis for the Proposed Revisions to Underground Injection Control Regulations for Class V Injection Wells [I-B.20] (Part 5)

RIA2005-01-07 · Regulatory impact analysis · EPA
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Economic Analysis for the Proposed Revisions to Underground Injection Control Regulations for Class V Injection Wells [I-B.20] (Part 3)

RIA2005-01-07 · Regulatory impact analysis · EPA
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Economic Analysis for the Proposed Revisions to Underground Injection Control Regulations for Class V Injection Wells, Addendum 1 [I-B.21] (Part 3)

RIA2005-01-07 · Regulatory impact analysis · EPA
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Economic Analysis for the Proposed Revisions to Underground Injection Control Regulations for Class V Injection Wells [I-B.20] (Part 4)

RIA2005-01-07 · Regulatory impact analysis · EPA
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Economic Analysis for the Proposed Revisions to Underground Injection Control Regulations for Class V Injection Wells [I-B.20] (Part 2)

RIA2005-01-07 · Regulatory impact analysis · EPA
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Environmental Protection Agency. 1998. Office of Ground Water and Drinking Water. Washington, DC. Economic Analysis for the Proposed Revisions to Underground Injection Control Regulations for Class V Injection Wells. Volume 2. Draft. May 12. 77 pp [W-98-05-III-B-5]

RIA2026-03-09 · Regulatory impact analysis · EPA · 7 references
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Environmental Protection Agency. 1999. Office of Ground Water and Drinking Water. Washington, DC. Economic Analysis for Final Rule: Revisions to the Underground Injection Control Regulations for Class V Injections Well. November 19. 152 pp [W-98-05-III-B-2]

RIA2026-03-09 · Regulatory impact analysis · EPA · 19 references
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

USEPA. May 12, 1998. Economic Analysis for the Proposed Revisions to the Underground Injection Control Regulation for Class V Injection Wells: Volume 2. Prepared by Cadmus Group, Inc. [W-98-05-I-B-20]

RIA chapter2026-05-21 · Regulatory impact analysis · EPA · 34 references
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

USEPA. May 12, 1998. Economic Analysis for the Proposed Revisions to the Underground Injection Control Regulation for Class V Injection Wells: Addendum 2 Draft. Prepared by Cadmus Group, Inc [W-98-05-I-B-22]

RIA2026-05-21 · Regulatory impact analysis · EPA · 11 references
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

USEPA. May 12, 1998. Economic Analysis for the Proposed Revisions to the Underground Injection Control Regulation for Class V Injection Wells: Addendum 1 Draft. Prepared by Cadmus Group, Inc. [W-98-05-I-B-21]

RIA2026-05-21 · Regulatory impact analysis · EPA · 9 references
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

USEPA. Undated. Proposed Class V UIC Rule: Initial Regulatory Flexibility Analysis (IRFA) [W-98-05-I-B-15]

RIA2026-05-21 · Regulatory impact analysis · EPA · 10 references
In this rulemaking because: RIN printed on the document (RIN 2040-AB83) · high confidence

Docket documents

EPA-HQ-OW-2002-0018: 172 documents, 82 held · Analyses 15 (15 held), Correspondence 31, Data 7 (7 held), Other 22 (1 held), Publications 30 (21 held), Reports 41 (33 held), OIRA review record 4 (4 held), Rule documents 22 (1 held)

Underground Injection Control Program - Notice of Final Determination for Class V Wells; Notice of final determination; and final rule [W-98-05-V-A-1]

Rule documents · EPA-HQ-OW-2002-0018-0001 · Rule · Final Rule · FR 02–14368

Consolidated Permit Regulations: RCRA Hazardous Waste; SDWA Underground Injection Control; CWA National Pollutant Discharge Elimination System; CWA Section 404 Dredge or Fill Programs; and CAA Prevention of Significant Deterioration [W-98-05-A2-1]

Rule documents · EPA-HQ-OW-2002-0018-0002 · Rule · Final Rule · FR 33290

Water Programs; Consolidated Permit Regulations and Technical Criteria and Standards; State Underground Injection Control Programs; Final Rule for Part 146 and Amendments to Part 122 [W-98-05-A2-2]

Rule documents · EPA-HQ-OW-2002-0018-0003 · Rule · Final Rule · FR 42472

Underground Injection Control Program Criteria and Standards, Technical Amendments to Final Regulations [W-98-05-A2-3]

Rule documents · EPA-HQ-OW-2002-0018-0004 · Rule · Final Rule · FR 43156

Underground Injection Control Program Criteria and Standards; Final Rule [W-98-05-A2-4]

Rule documents · EPA-HQ-OW-2002-0018-0005 · Rule · Final Rule · FR 4992

Underground Injection Control Program; Final Rule [W-98-05-A2-5]

Rule documents · EPA-HQ-OW-2002-0018-0006 · Rule · Final Rule · FR 2938

Environmental Permit Regulations: RCRA Hazardous Waste; SDWA Underground Injection Control; CWA National Pollutant Discharge Elimination System; CWA Section 404 Dredge or Fill Programs; and CAA Prevention of Significant Deterioration; Final Rule [W-98-05-A2-6]

Rule documents · EPA-HQ-OW-2002-0018-0007 · Rule · Final Rule

Underground Injection Control Program; Federally Administered Programs; Final Rule [W-98-05-A2-7]

Rule documents · EPA-HQ-OW-2002-0018-0008 · Rule · Final Rule · FR 20138

Underground Injection Control Program: Federally-Administered Programs; Final Rule [W-98-05-A2-8]

Rule documents · EPA-HQ-OW-2002-0018-0009 · Rule · Final Rule · FR 45292

Underground Injection Control Program: Hazardous Waste Disposal Injection Restrictions; Amendments to Technical Requirements for Class I Hazardous Waste Injection Wells; and Additional Monitoring Requirements Applicable to all Class I Wells [W-98-05-UIC-PRO-A-9]

Rule documents · EPA-HQ-OW-2002-0018-0011 · Rule · Final Rule · FR 28118

Revisions to the Safe Drinking Water Act. Underground Injection Control Regulations; Final and Interim Final Rule and Request for Comments [W-98-05-A1-1]

Rule documents · EPA-HQ-OW-2002-0018-0012 · Rule · Interim Final Rule · FR 63890

Standards Applicable to Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, Underground Storage Tanks, and Underground Injection Control Systems; Financial Assurance; Letter of Credit [W-98-05-III-B-6]

Rule documents · EPA-HQ-OW-2002-0018-0013 · Rule · Final Rule · FR 29958

Indian Tribes; Eligibility for Program Authorization [W-98-05-III-B-7]

Rule documents · EPA-HQ-OW-2002-0018-0014 · Rule · Final Rule · FR 64339

National Pollutant Discharge Elimination System and Pretreatment Programs; State and Local Assistance Programs; Effluent Limitations Guidelines and Standards; Public Water Supply and Underground Injection Control Programs: Removal of Legally Obsolete or Redundant Rules [W-98-05-III-B-8]

Rule documents · EPA-HQ-OW-2002-0018-0019 · Rule · Final Rule · FR 33926

Class V Wells - Regulatory Determination and Minor Revisions to the Underground Injection Control Regulations; Technical Correction to the Regulations for Class I Wells; Proposed Rule [W-98-05-UIC-PRO-A1-1]

Rule documents · EPA-HQ-OW-2002-0018-0020 · Rule · FR 44652

Revisions to the Underground Injection Control Regulations for Class V Injection Wells; Proposed Rule [W-98-05-I-A1-1]

Rule documents · EPA-HQ-OW-2002-0018-0021 · Rule · FR 40586

Revisions to the Underground Injection Control Regulations for Class V Injection Wells; Notice of Data Availability and Request for Comment on Related Proposed Rule [W-98-05-II-A-1]

Rule documents · EPA-HQ-OW-2002-0018-0051 · Rule · FR 27741

Revisions to the Underground Injection Control Regulations for Class V Injection Wells [W-98-05-III-A-1]

Rule documents · EPA-HQ-OW-2002-0018-0052 · Rule · Final Rule · FR 68546

Underground Injection Control Program; Notice of Proposed Determination for Class V Wells [W-98-05-IV-A-1]

Rule documents · EPA-HQ-OW-2002-0018-0054 · Rule · FR 22971

Revisions to the Underground Injection Control Regulations for Class V Injection Wells; Reopening of Comment Period [W-98-05-I-A1-2]

Rule documentsHeld2025-05-29 · EPA-HQ-OW-2002-0018-0074 · Proposed Rule · FR 98-26008

Revisions to the Underground Injection Control Regulations for Class V Injection Wells; Correction [W-98-05-III-A-2]

Rule documents2025-05-29 · EPA-HQ-OW-2002-0018-0075 · Rule · Correction · FR C9-31048

Revisions to the Underground Injection Control Regulations for Class V Injection Wells; Correction [W-98-05-III-A-3]

Rule documents2025-05-29 · EPA-HQ-OW-2002-0018-0076 · Rule · Correction · FR C9-31048

OIRA reviews (3)

Proposed Rulereceived 1995-07-17, concluded 1995-08-14 · Consistent with change
Proposed Rulereceived 1998-06-04, concluded 1998-07-15 · Consistent with change
Final Rulereceived 1999-08-24, concluded 1999-11-16 · Consistent with change