NERC Standards and Standards Compliance: Still a Work in Progress?
Publisher page (DOI)OpenAlex record
Cited in 5 places in policy documents
Documents supporting the RIA and Preamble from Jung
Lyons, C., Jacobi, J., Starkweather, R.: ‘NERC standards and standards compliance: still a work in progress?’, Electr. J., 2008, 21, (3), pp. 29–39
Documents supporting the RIA and Preamble from Jung
[6] J. H. Eto and K. H. LaCommare, “Tracking the Reliability of the U.S. Electric Power System: An Assessment of Publicly Available Information Reported to State Public Utility Commission,” Lawrence Berkeley National Laboratory, Berkeley, CA, LBNL-1092E, Oct. 2008.
Documents supporting the RIA and Preamble from Jung
[38] E. B. Fisher, R. P. O’Neill, and M. C. Ferris, "Optimal transmission switching," IEEE Transactions on Power Systems, vol. 23, no. 3, p. 1346–1355, 2008.
Documents supporting the RIA and Preamble from Jung
[39] K. W. Hedman, R. P. O’Neill, E. B. Fisher, and S. S. Oren, "Optimal transmission switching—sensitivity analysis and extensions," IEEE Transactions Power Systems, vol. 23, no. 3, p. 1469–1479, 2008.
Documents supporting the RIA and Preamble from Jung
[123] EPRI, Demonstration of advanced conductors for overhead transmission lines, CEC-5002013-030, Palo Alto, 2008.