Policy Replication

Distribution system versus bulk power system: identifying the source of electric service interruptions in the US

Joseph H. Eto, Kristina Hamachi LaCommare, Heide Caswell, David Till
2019 · IET Generation Transmission & Distribution · article · doi:10.1049/iet-gtd.2018.6452 · 32 scholarly citations

A free copy is available at the open-access link. Its license does not let us host the file here.

Cited in 8 places in policy documents

Greenhouse Gas Emissions Standards for Heavy-Duty Vehicles-Phase 3

Federal Register2024-04-22 · ENVIRONMENTAL PROTECTION AGENCY · fn 495
Eto, Joseph H, Kristina Hamachi LaCommare, Heidemarie C Caswell, and David Till. "Distribution system versus bulk power system: identifying the source of electric service interruptions in the US." IET Generation, Transmission & Distribution 13.5 (2019) 717-723.

Greenhouse Gas Emissions Standards for Heavy-Duty Vehicles-Phase 3

Federal Register2024-04-22 · ENVIRONMENTAL PROTECTION AGENCY · fn 460
Eto, Joseph H, Kristina Hamachi LaCommare, Heidemarie C Caswell, and David Till. “Distribution system versus bulk power system: identifying the source of electric service interruptions in the US.” IET Generation, Transmission & Distribution 13.5 (2019) 717-723.

2024-03-14 EO 12866 EPA Preamble and RIA passback

Regulatory impact analysis2024-04-22 · EPA · fn 457
Eto, Joseph H, Kristina Hamachi LaCommare, Heidemarie C Caswell, and David Till. "Distribution system versus bulk power system: identifying the source of electric service interruptions in the US." IET Generation, Transmission & Distribution 13.5 (2019) 717-723

Documents supporting the RIA and Preamble from Jung

Regulatory impact analysis2024-04-18 · EPA · Explained: Reliability of the Current Power Grid (NREL section) fn Eto et al. 2019
Eto, Joseph H., Kristina H. LaCommare, Heidemarie C. Caswell, and David Till. 2019. “Distribution System Versus Bulk Power System: Identifying the Source of Electric Service Interruptions in the US.” IET Generation, Transmission & Distribution 13 (5): 717–723. https://doi.org/10.1049/iet-gtd.2018.6452.

Documents supporting the RIA and Preamble from Jung

Regulatory impact analysis2024-04-18 · EPA · page 15
Distribution system versus bulk power system: identifying the source of electric service interruptions in the US IET Research Article

Final RIA, Preamble, Regs, and RTC

Regulatory impact analysis2024-04-18 · EPA · distribution interruptions
J. L. Eto, Distribution system versus bulk power system: identifying the source of electric service interruptions in the US 2019

SAN-8953-RIN-2060-AV49-LMDV-2027-RIA-FRM-Final-03142024

Regulatory impact analysis2024-04-18 · EPA · Distribution Grid Reliability / Chapter 5 References
Eto, J., LaCommare, K, Caswell, H, and Till, D. 2019. Distribution system versus bulk power system: identifying the source of electric service interruptions in the US. Institution of Engineering and Technology.

Documents supporting the RIA and Preamble from Jung

Regulatory impact analysis2024-04-18 · EPA · refsec
IET Gener. Transm. Distrib., 2019, Vol. 13 Iss. 5, pp. 717-723 This is an open access article published by the IET under the Creative Commons Attribution-NonCommercial-NoDerivs License (http://creativecommons.org/licenses/by-nc-nd/3.0/) 17518695, 2019, 5, Downloaded from https://ietresearch.onlinelibrary.wiley.com/doi/10.1049/iet-gtd.2018.6452, Wiley Online Library on [13/03/2024]. See the Terms and Conditions (https://onlinelibrary.wiley.com/terms-and-conditions) on Wiley Online Library for rules of use; OA articles are governed by the applicable Creative Commons License This work is not intended to suggest that more investment is needed to improve distribution system reliability or that less investment is warranted for maintaining transmission system reliability. Rather, the purpose of this work is to facilitate dialogue among utilities and their regulatory agencies and state or local governments who are charged with making these determinations by providing them with more accurate information on the actual reliability performance of past (and future) efforts to maintain or improve reliability. 177 FERC ¶ 61,179