Understanding Electric Power Systems: An Overview of Technology, the Marketplace, and Government Regulation
Publisher page (DOI)OpenAlex record
Cited in 12 places in policy documents
RIA cited in FR 2024-09185: Supplemental Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category
Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 220-221 (2d ed. 2010).
Documents supporting the RIA and Preamble from Jung
Delea, F. and J. Cassazza. 2010. Understanding Electric Power Systems: An Overview of the Technology, the Marketplace, and Government Regulation, 2nd Edition. IEEE Press Understanding Science & Technology. Wiley-IEEE Press.
Carbon Pollution Emission Guidelines for Existing Stationary Sources: Electric Utility Generating Units
Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 188 (2d ed. 2010).
``Since power flows on all transmission paths, it is not uncommon to find circumstances in which part of a power delivery within one balancing area flows on transmission lines in adjoining areas, or part of a power delivery between two balancing areas flows over the transmission facilities of a third area.'' \391\ The interconnections are the ``complex machines'' within which EGUs plan, coordinate, and operate, manifesting a degree of both long-term and real-time interdependence that is unique to this industry.
Standards of Performance for Greenhouse Gas Emissions From New, Modified, and Reconstructed Stationary Sources: Electric Utility Generating Units
Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 220-221 (2d ed. 2010).
In 1978, partly in response to fuel security concerns, Congress passed the Public Utilities Regulatory Policies Act (PURPA) which required local electric utilities to buy power from qualifying facilities (QFs).\59\ QFs were either cogeneration facilities \60\ or small
Carbon Pollution Emission Guidelines for Existing Stationary Sources: Electric Utility Generating Units
Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press (2d ed. 2010).
Beginning with the first power station in New York City in 1882, each power station initially served a discrete set of consumers, resulting in small and localized electricity systems.\65\ During the early 1900s, smaller systems consolidated, allowing generation resources to be shared over larger areas.
Federal Plan Requirements for Greenhouse Gas Emissions From Electric Utility Generating Units Constructed on or Before January 8, 2014; Model Trading Rules; Amendments to Framework Regulations
Casazza, J. and Delea, F., Understanding Electric Power Systems: An Overview of the Technology, the Marketplace, and Government Regulations, IEEE Press, at 160 (2010).
Under this approach, planning authorities plan the system to assure the availability of sufficient generation, transmission, and distribution capacity to meet system needs in a way that minimizes the likelihood of equipment failure.\32\ Long-term system planning happens at both the local and regional levels with all segments of the electric system needing to operate together in an efficient and reliable manner.
Carbon Pollution Emission Guidelines for Existing Stationary Sources: Electric Utility Generating Units
Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 159 (2d ed. 2010).
Generation, outages, and transmission changes in one part of the synchronous grid can affect the entire interconnected grid.\22\ The interconnection is such that ``[i]f a generator is lost in New York City, its effect is felt in Georgia, Florida, Minneapolis, St.
Carbon Pollution Emission Guidelines for Existing Stationary Sources: Electric Utility Generating Units
Casazza, J. and Delea, F., Understanding Electric Power Systems: An Overview of the Technology, the Marketplace, and Government Regulations, IEEE Press (2010)
Under this approach, planning authorities plan the system to assure the availability of sufficient generation, transmission, and distribution capacity to meet system needs in a way that minimizes the likelihood of equipment failure.\861\ Long-term system planning happens at both the local and regional levels with all segments of the electric system needing to operate together in an efficient and reliable manner.
Part of E.O. 12866 and 13563 Review: Transmittal of revised CPP final rule package and RIA for Interagency Review (2060-AR33) (8/1/2015)
Casazza, J. and Delea, F., Understanding Electric Power Systems: An Overview of the Technology, the Marketplace, and Government Regulations, IEEE Press, at 160 (2010).
Part of E.O. 12866 and 13563 Review: Transmittal of revised CPP final rule package and RIA for Interagency Review (2060-AR33) (8/1/2015)
Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 159 (2d ed. 2010).
Part of E.O. 12866 and 13563 Review: Transmittal of revised CPP final rule package and RIA for Interagency Review (2060-AR33) (8/1/2015)
Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press (2d ed. 2010).
Part of E.O. 12866 and 13563 Review: Transmittal of revised CPP final rule package and RIA for Interagency Review (2060-AR33) (8/1/2015)
Casazza, J. and Delea, F., Understanding Electric Power Systems, IEEE Press, at 188 (2d ed. 2010).