PRIA-Breakout Tank Inspection
Original sourceAttachment (350 KB)
Other documents for the same rulemaking (all, by stage)
References: 4 extracted, 0 linked to papers
API Standard 653, Tank Inspection, Repair, Alteration, and Reconstruction (5th ed. Nov. 2014). All references to the 5th edition of API Std 653 in this document include addendum 1 (April 2018), addendum 2 (May 2000), addendum 3 (November 2023), addendum 4 (July 2025), errata 1 (March 2020), and errata 2 (February 2025).
OMB, Circular A-4 (Sept. 17, 2003), available at: https://www.whitehouse.gov/wp-content/uploads/2025/08/CircularA-4.pdf.
PHMSA, Incident Flagged Files (as of August 29, 2025), available at: https://www.phmsa.dot.gov/data-and-statistics/pipeline/pipeline-incident-flagged-files.
In the Matter of MIPC, LLC, a subsidiary of Monroe Energy, LLC, CPF No. 1-2025-048-CAO, available at: https://primis.phmsa.dot.gov/enforcement-documents/12025048CAO/12025048CAO_Corrective%20Action%20Order_12192025_(25-359253)_text.pdf.