{"document":{"doc_id":87847,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"PRIA-Breakout Tank Inspection","date":"2026-05-29","url":"https://www.regulations.gov/document/PHMSA-2025-1271-0001","source_native_id":"PHMSA-2025-1271-0001","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2025-1271"],"rins":["RIN 2137-AG22"],"related":[{"doc_id":162914,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"DEA Breakout Tank Inspection","date":"2026-05-29"},{"doc_id":81960,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Breakout Tank Inspection Rule","date":"2026-06-02"},{"doc_id":162912,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"RBI NPRM HL Annual Report Form and Instructions - PHMSA F 7000-1.1 (rev 4-2023) Redlined 2025-10-20","date":"2026-06-03"},{"doc_id":162913,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Redlines of NPMS Breakout Tank Attributes","date":"2026-06-04"},{"doc_id":127314,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Summary of May 19 2026 EO 12866 Meeting","date":"2026-06-09"},{"doc_id":127315,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Breakout Tank Inspection NPRM: OIRA Redline","date":"2026-06-09"},{"doc_id":209780,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Clarifying Questions on API Data","date":"2026-10-19"},{"doc_id":222887,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Summary of Oct 13 Meeting","date":"2026-10-19"},{"doc_id":209770,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Final LPAC Votes 10-21-26","date":"2026-10-27"},{"doc_id":209771,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Notice of October 21 LPAC Meeting","date":"2026-10-27"},{"doc_id":209772,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Final LPAC Slides 10-21-26","date":"2026-10-27"},{"doc_id":222879,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Summary of API and LEPA Pipeline Integrity Group Roundtable","date":"2026-11-04"}],"references":[{"citation_id":571385,"raw_reference":"API Standard 653, Tank Inspection, Repair, Alteration, and Reconstruction (5th ed. Nov. 2014). All references to the 5th edition of API Std 653 in this document include addendum 1 (April 2018), addendum 2 (May 2000), addendum 3 (November 2023), addendum 4 (July 2025), errata 1 (March 2020), and errata 2 (February 2025).","cited_authors":"American Petroleum Institute","cited_year":"2014 (5th ed.; addenda through 2025)","cited_title":"API Standard 653, Tank Inspection, Repair, Alteration, and Reconstruction","cited_venue":"American Petroleum Institute (standard)","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Executive Summary; fn 1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":571386,"raw_reference":"OMB, Circular A-4 (Sept. 17, 2003), available at: https://www.whitehouse.gov/wp-content/uploads/2025/08/CircularA-4.pdf.","cited_authors":"Office of Management and Budget (OMB)","cited_year":"2003","cited_title":"Circular A-4","cited_venue":"Office of Management and Budget","cited_doi":null,"cited_url":"https://www.whitehouse.gov/wp-content/uploads/2025/08/CircularA-4.pdf","ref_kind":"government_report","section":"Section 4.2, fn 3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":571387,"raw_reference":"PHMSA, Incident Flagged Files (as of August 29, 2025), available at: https://www.phmsa.dot.gov/data-and-statistics/pipeline/pipeline-incident-flagged-files.","cited_authors":"Pipeline and Hazardous Materials Safety Administration (PHMSA)","cited_year":"2025","cited_title":"Incident Flagged Files","cited_venue":"PHMSA dataset/web page","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/data-and-statistics/pipeline/pipeline-incident-flagged-files","ref_kind":"dataset","section":"Table 6-2 source (Section 6)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":571388,"raw_reference":"In the Matter of MIPC, LLC, a subsidiary of Monroe Energy, LLC, CPF No. 1-2025-048-CAO, available at: https://primis.phmsa.dot.gov/enforcement-documents/12025048CAO/12025048CAO_Corrective%20Action%20Order_12192025_(25-359253)_text.pdf.","cited_authors":"Pipeline and Hazardous Materials Safety Administration (PHMSA)","cited_year":"2025","cited_title":"In the Matter of MIPC, LLC, a subsidiary of Monroe Energy, LLC, CPF No. 1-2025-048-CAO (Corrective Action Order)","cited_venue":"PHMSA enforcement document (Corrective Action Order)","cited_doi":null,"cited_url":"https://primis.phmsa.dot.gov/enforcement-documents/12025048CAO/12025048CAO_Corrective%20Action%20Order_12192025_(25-359253)_text.pdf","ref_kind":"web_page","section":"Section 6, footnote about 2025 incident","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}