{"document":{"doc_id":87725,"source":"ria","org":"NRC","doc_type":"regulatory_analysis","title":"Regulatory Analysis for the Proposed Rule Modernizing reactor Licensing Safety Oversight and Siting Practices NRC-2025-0975 RIN 3150-AL44","date":"2026-07-16","url":"https://www.regulations.gov/document/NRC-2025-0975-0012","source_native_id":"NRC-2025-0975-0012","status":"fetched","abstract":null,"action":null},"dockets":["NRC-2025-0975"],"rins":["RIN 3150-AL44"],"related":[{"doc_id":81622,"source":"fr_rule","org":"NUCLEAR REGULATORY COMMISSION","doc_type":"Proposed Rule","title":"Modernizing Reactor Licensing, Safety Oversight, and Siting Practices","date":"2026-07-16"},{"doc_id":127298,"source":"docket_item","org":"NRC","doc_type":"review_record","title":"Unofficial Redline Rule Language for the Proposed Rule Modernizing Reactor Licensing Safety Oversight and Siting Practices NRC-2025-0975 RIN 3150-AL44","date":"2026-07-16"},{"doc_id":162683,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1454 Implementation of Determinate and Data-Backed Thresholds for Reactor Safety Assessments Proposed New Regulatory Guide 1.269","date":"2026-07-16"},{"doc_id":162685,"source":"docket_item","org":"NRC","doc_type":"other","title":"Draft Environmental Assessment for the Proposed Rule Modernizing Reactor Licensing Safety Oversight and Siting Practices NRC-2025-0975 RIN 3150-AL44","date":"2026-07-16"},{"doc_id":81590,"source":"fr_rule","org":"NUCLEAR REGULATORY COMMISSION","doc_type":"Proposed Rule (administrative)","title":"Modernizing Reactor Licensing, Safety Oversight, and Siting Practices; Correction","date":"2026-07-27"}],"references":[{"citation_id":561058,"raw_reference":"NUREG/CR-1508, “Evaluation of the Cost Effects on Nuclear Power Plant Construction Resulting from the Increase in Seismic Design Level,” April 1981 (ML19352A293).","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"1981","cited_title":"Evaluation of the Cost Effects on Nuclear Power Plant Construction Resulting from the Increase in Seismic Design Level","cited_venue":"NUREG/CR-1508","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":561059,"raw_reference":"NUREG/CR-3568, “A Handbook for Value-Impact Assessment,” December 1983 (ML062830096).","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"1983","cited_title":"A Handbook for Value-Impact Assessment","cited_venue":"NUREG/CR-3568","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":561060,"raw_reference":"NUREG-1829, “Estimating Loss-of-Coolant Accident (LOCA) Frequencies Through the Elicitation Process,” April 2008 (ML082250436).","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"2008","cited_title":"Estimating Loss-of-Coolant Accident (LOCA) Frequencies Through the Elicitation Process","cited_venue":"NUREG-1829","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":561061,"raw_reference":"NUREG-1903, “Seismic Considerations for the Transition Break Size,” February 2008 (ML080880140).","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"2008","cited_title":"Seismic Considerations for the Transition Break Size","cited_venue":"NUREG-1903","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":561062,"raw_reference":"Vogtle ESP (ESP-004) (NRC, 2009) (ML092290157).","cited_authors":"U.S. Nuclear Regulatory Commission / Southern Nuclear Operating Company","cited_year":"2009","cited_title":"Southern Nuclear Operating Company Vogtle Electric Generating Plant ESP Site Docket No. 52-011 Early Site Permit and Limited Work Authorization","cited_venue":"NRC document (ESP-004)","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":561063,"raw_reference":"“Regulatory Analysis: Risk-Informed Changes to Loss-of-Coolant Accident Technical Requirements,” December 29, 2010 (ML103230250).","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"2010","cited_title":"Regulatory Analysis: Risk-Informed Changes to Loss-of-Coolant Accident Technical Requirements","cited_venue":"NRC regulatory analysis","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":561064,"raw_reference":"NUREG/BR-0058, draft Revision 5, “Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission,” January 2020 (NRC, 2020) (ML19261A277).","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"2020","cited_title":"Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission","cited_venue":"NUREG/BR-0058, draft Revision 5","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Section 3.1; References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":561065,"raw_reference":"DG-1263, Revision 1 (RG 1.224), “Establishing Analytical Limits for Zirconium-Alloy Cladding Material,” 2026 (ML24304A946).","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"2026","cited_title":"Establishing Analytical Limits for Zirconium-Alloy Cladding Material","cited_venue":"DG-1263 Revision 1 (RG 1.224)","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":561066,"raw_reference":"BLS, 2024. “May 2024 National Industry Specific Occupational Employment and Wage Estimates;\" NAICS 221100—Electric Power Generation, Transmission, and Distribution' and 221113—Nuclear Electric Power Generation, U.S. Department of Labor, April 2024, https://www.bls.gov/oes/2024/may/oessrci.htm.","cited_authors":"U.S. Bureau of Labor Statistics","cited_year":"2024","cited_title":"May 2024 National Industry Specific Occupational Employment and Wage Estimates; NAICS 221100 and 221113","cited_venue":"BLS website / dataset","cited_doi":null,"cited_url":"https://www.bls.gov/oes/2024/may/oessrci.htm","ref_kind":"dataset","section":"References; Section 3.2.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":561067,"raw_reference":"Electric Power Research Institute, 2022. “Leveraging Risk Insights for Aging Management Program Implementation,” Electric Power Research Institute Report 300202071, April 2022.","cited_authors":"Electric Power Research Institute (EPRI)","cited_year":"2022","cited_title":"Leveraging Risk Insights for Aging Management Program Implementation","cited_venue":"EPRI Report 300202071","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"References; Table 20","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":561068,"raw_reference":"NEI, 2023a. “The Future of Nuclear Power: 2023 Baseline Survey – White Paper,” 2023, Available at https://www.nei.org/getContentAsset/15e265de-2b75-47c6-9d68-2d0535ead359/8d8ff8d6-b2ae-401b-a63c-f6b108e809d2/The-Future-of-Nuclear-Power-2023-Baseline-Survey.pdf?language=en-US.","cited_authors":"Nuclear Energy Institute (NEI)","cited_year":"2023","cited_title":"The Future of Nuclear Power: 2023 Baseline Survey – White Paper","cited_venue":"NEI white paper","cited_doi":null,"cited_url":"https://www.nei.org/getContentAsset/15e265de-2b75-47c6-9d68-2d0535ead359/8d8ff8d6-b2ae-401b-a63c-f6b108e809d2/The-Future-of-Nuclear-Power-2023-Baseline-Survey.pdf?language=en-US","ref_kind":"web_page","section":"Section 3.2.2; References","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":561069,"raw_reference":"NEI, 2023b. “Nuclear Costs in Context,” 2023, Available at https://www.nei.org/resources/reports-briefs/nuclear-costs-in-context.","cited_authors":"Nuclear Energy Institute (NEI)","cited_year":"2023","cited_title":"Nuclear Costs in Context","cited_venue":"NEI report / web page","cited_doi":null,"cited_url":"https://www.nei.org/resources/reports-briefs/nuclear-costs-in-context","ref_kind":"web_page","section":"References; Section 4.2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":561070,"raw_reference":"Energy Information Administration. U.S. Nuclear Statistics. 2021. Available online at: https://www.eia.gov/energyexplained/nuclear/data-and-statistics.php","cited_authors":"U.S. Energy Information Administration (EIA)","cited_year":"2021","cited_title":"U.S. Nuclear Statistics","cited_venue":"EIA web page / dataset","cited_doi":null,"cited_url":"https://www.eia.gov/energyexplained/nuclear/data-and-statistics.php","ref_kind":"dataset","section":"References; Sections 3.2.2 and 4.2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}