Economic Analysis
Original sourcePDF (833 KB)Attachment (116 KB)Attachment (279 KB)Attachment (330 KB)Attachment (326 KB)Attachment (549 KB)Attachment (788 KB)Attachment (237 KB)Attachment (437 KB)Attachment (918 KB)Attachment (200 KB)Attachment (220 KB)Attachment (128 KB)Attachment (153 KB)Attachment (271 KB)Attachment (3.7 MB)Attachment (2.3 MB)Attachment (5.3 MB)Attachment (316.1 MB)Attachment (58 KB)Attachment (612 KB)
Other documents for the same rulemaking (all, by stage)
References: 2,490 extracted, 505 linked to papers
¿SUD PHASE 3 SOUTH UNIVERSITY DISTRICT¿ drawings submitted on behalf of the applicant by Stahly Engineering & Associates, dated 6/8/2018
¿MISSION CREEK BRIDGE MT-TSEP-CG-19-989¿ drawings submitted on behalf of the applicant by Nate Peressini (Stahly Engineering & Associates) and dated 1/15/2019
SS-8-018(096)109 plans dated April 4, 2019
USDA-NRCS; NE-CPA-FSA-Worksheet 2/09 Appendix C
¿STRAND RANCH ESTATE DIPPING VAT CLEAN-UP REVEGETATION PLAN¿ prepared by TD&H Engineering
design information received from Mainelli Wagner & Associates on June 2, 2020.
design information received from E&A Consulting Group Inc. on August 11, 2020.
DNRC water right # 76K30109425
monitoring plan entitled ¿King Property Wetland and Waterway Enhancement Monitoring Plan¿ prepared by Power Engineers
"Daniel-Crawford Dynamic Gravel Beach Design Report" prepared by Dr. Mark Lorang dated November 7, 2020
design plans received from Olsson Associates, dated January 15, 2021
plans received from Nebraska Game and Parks Commission (NGPC) on January 13, 2021 and February 3, 2021
design plans received January 29, 2020 from JEO Consulting Group, Inc.
design information received from Mainelli Wagner & Associates, Inc. on January 15, 2021
Federal Aid Project IM 90-3(143)158 Remove and Replace Culvert I-90 Culvert - Jens Granite and Powell Counties dated December 28, 2020
drawings entitled “EATON PROPERTY LIVINGSTON, MONTANA” submitted on behalf of the applicant by Point Bar Resources and dated 3/3/2021
design plans received from Alfred Benesch & Company dated February 13, 2021 and supplemental designs received July 12, 2021
design information received from Enbridge on February 26, 2021 and May 25, 2021
plans received from McCandless Backhoeing Inc. on January 20, 2021 and February 3, 2021
plans received from Olsson Associates dated January 27, 2021
submitted joint application dated March 18, 2021 (MDT temporary facilities documentation)
plans received from Enbridge on February 26, 2021 and May 25, 2021
specifically “Method 1 - Graded Broken Concrete or Rock Riprap Full-Slope Protection”. The riprap would consist of graded broken concrete or quarried limestone, and it is estimated that the project would require approximately 0.50 tons or 0.33 cubic yards of riprap per running foot of river bank to cover the stabilized bank above the Ordinary High-Water Mark (OHWM).
These impacts are detailed on the drawings entitled, “Vicinity Map,” and “Existing Conditions,” Figures 1-2, dated May 10, 2021, all prepared and submitted on behalf of the applicant by ERO Resources Corporation and date stamped as received by this office on May 19, 2021. (On file with the Administrative Record)
Portland Sediment Evaluation Team’s (PSET) sediment suitability determination memo dated March 26, 2013
2009 Sediment Evaluation Framework
Sampling and Analysis Plan (SAP)
Portland Harbor Superfund Site Remedial Investigation
Ocean Observatories Initiative (Williamson & Associates)
National Science Foundation's Ocean Observatories Initiative
Oregon Aquatic Habitat Restoration and Enhancement Guide
Slopes IV Best Management Practices for Operating Equipment Near a Small Stream
OFDW fish passage and boulder placement guidelines
2009 Sediment Evaluation Framework (SEF)
Portland Sediment Evaluation Team (PSET) evaluated in 2012 under the 2009 Sediment Evaluation Framework (SEF)
NMFS biological opinion dated November 28, 2012
Amended ITS dated September 4, 2014
NMFS biological opinion dated August 5, 2014
District Water Management Plan dated September 23, 2015
National Wetland Inventory wetland areas (PUBKHh)
The Bureau of Reclamation completed their Environmental Assessment for the project on June 7, 2017
USEPA-approved work plan (AECOM and Geosyntec, 2018)
work plan prepared by MFA on behalf of Siltronic for this sampling event
Beechie et al. 2010
Wheaton et al. 2019
1 - Watercraft Lifts in Washington State (2005) Magill, Andrew 14-FEB-10
Washington Department of Natural Resources Lease (20-A09450) originally dated 2 October 1999.
Washington Department of Natural Resources Lease (20-A12546)
Washington Department of Natural Resources Lease (20-A09534)
Washington Department of Natural Resources Lease (20-A12381) originally dated 21 July 1997.