Economic Analysis
Original sourcePDF (833 KB)Attachment (116 KB)Attachment (279 KB)Attachment (330 KB)Attachment (326 KB)Attachment (549 KB)Attachment (788 KB)Attachment (237 KB)Attachment (437 KB)Attachment (918 KB)Attachment (200 KB)Attachment (220 KB)Attachment (128 KB)Attachment (153 KB)Attachment (271 KB)Attachment (3.7 MB)Attachment (2.3 MB)Attachment (5.3 MB)Attachment (316.1 MB)Attachment (58 KB)Attachment (612 KB)
Other documents for the same rulemaking (all, by stage)
References: 2,490 extracted, 505 linked to papers
Drawings prepared by River Design Group Titled, Upper Ninemile Creek - Housum Placer Restoration Project Reach 2B and Reach 2C Final Design dated March 15, 2014 with revisions dated April 10, 2014.
Mitigation Guidelines for Nebraska 92s Eastern Saline Wetlands
Environmental Assessment (EA) and Finding of No Significant Impact was finalized by the Federal Emergency Management Agency (FEMA) on 25 September 2014.
Aquatic Species Habitat Enhancement & Restoration in WY (8202-07)
2013 Montana Stream Mitigation Procedure
map entitled, "Sheep Creek Wetland Impact Areas", created by Global Fisheries Management
re-vegetation plan submitted on YPL's behalf by Terracon dated June 2, 2016
Nebraska Stream Condition Assessment Procedure (NeSCAP)
Habitat Conservation Plan and Environmental Assessment for Douglas County and the Towns of Castle Rock and Parker (2006, DCHCP)
plans prepared by Confluence Consulting, titled, ¿Jefferson Slough Channel Modification¿, dated September 2, 2016
drawings entitled 'Red Lodge Creek Road Bridge Replacement (RL2)', prepared and submitted on behalf of the applicant by Great West Engineering, and dated September 26, 2016.
drawings entitled 'SCHROEDER RESIDENCE — PRIVATE BRIDGE 477 MILL CREEK ROAD, PARK COUNTY, MONTANA MAY 2016', prepared and submitted on your behalf of the applicant by, CTA and dated May 26, 2016.
'Wyttenhove Lane Bridge Replacement', prepared and submitted by Great West Engineering and dated July 8, 2016.
plan sheet entitled 'Dredging Plan' dated August 4, 2017.
plan sheet entitled 'Debris Removal Extents' dated July 27, 2017.
USDA NRCS Bank Protection Details Type III, Big Spring Creek Restoration Project Fergus County, Montana
Federal Aid Project No. NH 55-3(17)7 Grade, Gravel, & PL. Mix Surfacing Whitehall-South Jefferson County, dated March 9, 2016
"Confed. Salish & Kootenai Tribes Crow Dam Bridge Replacement", dated March 2017, prepared by DJ&A, P.C., submitted on behalf of the CSKT by Morrison and Maierle
State of Montana Best Management Practices
"Spotted Eagle Lake Fishing Jetty Project, prepared and submitted on behalf of the applicant by Caleb Bollman, Montana Fish, Wildlife and Parks, and dated June 23, 2017."
¿SAGE DEVELOPMENT PROPOSED CONDITIONS WETLAND EXHIBIT EMIGRANT, PARK COUNTY, MT¿, prepared and submitted on behalf of the applicant by Vaughn Environmental Services and received in our office on March 19th, 2018.
drawings titled ¿RACETRACK POND FISHING ACCESS SITE AND HABITAT IMPROVEMENT PROJECT POWELL COUNTY, MONTANA¿, prepared and submitted on behalf of the applicant by Tetra Tech and Geum Environmental Consulting.
plans entitled, "Boulder Creek Lundgren Property", dated April 27, 2017.
Planting Plan drawings dated October 6, 2017.
design plans provided by JEO Consulting dated August 2018
design plans and supplemental information received from JEO Consulting Group, Inc. dated October 5, 2018
design plans received from Olsson Associates on September 6, 2018
¿FINTAIL RANCH DARNUTZER CREEK ENHANCEMENTS¿, prepared and submitted on behalf of the applicant by Genesis Engineering, Inc and dated 02/2018
monitoring plan entitled ¿Fintail Ranch MONITORING PLAN¿ prepared by Sundog ecological Inc.
plans and drawings prepared by River Design Group, titled, ¿Mud Creek Restoration Project, Eureka, Montana¿, dated April 17, 2018
plans titled SS-6-045(006)011 which are dated November 29, 2018
¿VALVE REMOVAL AND REPLACEMENT ON FORCEMAIN ON ROCK CREEK¿, prepared and submitted on behalf of the applicant by Great West Engineering
drawings entitled “BNSF Railway Company Embankment Stabilization Project Glasgow Subdivision, Montana SITE PLAN, VICINITY MAP and TYPICAL CROSS SECTION MP 234.75 to 236.4”, dated April 2018, prepared and submitted on behalf of the applicant by Shannon & Wilson, INC. Geotechnical and Environmental Consultants.
drawings entitled “BNSF Railway Company Embankment Stabilization Project Glasgow Subdivision, Montana SITE PLAN, VICINITY MAP and TYPICAL CROSS SECTION MP 256.5 to 257.1”, dated April 2018, prepared and submitted on behalf of the applicant by Shannon & Wilson, INC. Geotechnical and Environmental Consultants.
drawings entitled “NORTH FORK SPANISH CREEK FISH BARRIER GALLATIN RIVER WATERSHED MADISON COUNTY, MT”, prepared and submitted on behalf of the applicant by Pioneer Technical Services, Inc., and dated 11/18/16.
drawings entitled “Madison River Ranch Truss Bridge Repair Gallatin County, Montana”, and submitted on behalf of the applicant by Stahly Engineering & Associates, dated 5/4/2018.
design information received from McCandless Backhoe Inc. on February 24, 2021.
NRCS design plans received by the Corps on October 8, 2018.
“Flint Creek Private Irrigators Improvements”, prepared by Morrison Maierle and dated November 2019.
“Proposed construction at Cottonwood Creek diversion site”, drawings entitled and dated August 6, 2018.
“Proposed Base Ski Area Road Improvements”, submitted on behalf of the applicant by Rocky Mountain Engineers, P.L.L.C, and dated September 6, 2018.
“POWELL COUNTY OLD YELLOWSTONE TRAIL, PHASE 1 CONSTRUCTION PLANS”, submitted on behalf of the applicant by Great West Engineering, and dated December 2018.
“EXHIBIT ‘A’”, submitted on behalf of the applicant by Montana Rail Link Engineering Department, and dated 11 October 2018.
“design information received from HDR on May 26, 2020.”
“design plans received from JEO Consulting Group dated October 10, 2018.”
“design plans by Olsson Associates, January 8, 2020.”
plans drawn by Nelson Engineering dated January 25, 2019
Biota Research and Consulting, Inc. dated February 6, 2019
December 2018 plans titled ¿Park Branch Paradise Canal Spring 2019 Project¿ submitted on your behalf by WGM Group
¿Kroger Project¿ drawings submitted on behalf of the applicant by Roger Perkins with AQUONEERING, received by our office on November 9, 2018