Documents supporting the RIA and Preamble from Jung
Regulatory impact analysis2024-04-18 · EPA · regulatory_impact_analysis · EPA-HQ-OAR-2022-0829-5731
Original sourceAttachment (124 KB)Attachment (209 KB)Attachment (218 KB)Attachment (115 KB)Attachment (97 KB)Attachment (419 KB)Attachment (1.2 MB)Attachment (50 KB)Attachment (295 KB)Attachment (959 KB)Attachment (227 KB)Attachment (3.4 MB)Attachment (6.9 MB)Attachment (1.4 MB)Attachment (196 KB)Attachment (375 KB)Attachment (89 KB)Attachment (84 KB)Attachment (139 KB)Attachment (184 KB)Attachment (1.4 MB)Attachment (232 KB)Attachment (1.8 MB)Attachment (3.8 MB)Attachment (797 KB)Attachment (3.9 MB)Attachment (386 KB)Attachment (941 KB)Attachment (1.1 MB)Attachment (380 KB)Attachment (543 KB)Attachment (10.2 MB)Attachment (403 KB)Attachment (312 KB)Attachment (390 KB)Attachment (754 KB)Attachment (805 KB)Attachment (4.6 MB)Attachment (795 KB)Attachment (1.5 MB)
Other documents for the same rulemaking (all, by stage)
References: 1,981 extracted, 433 linked to papers
Page 39Download these results: CSV · JSON
SAIDI’ days’, IEEE Trans. Power Syst., 2013, 28, (3), pp. 3517–3518
research reportNot linked to a paper · refsec
IET Gener. Transm. Distrib., 2019, Vol. 13 Iss. 5, pp. 717-723 This is an open access article published by the IET under the Creative Commons Attribution-NonCommercial-NoDerivs License (http://creativecommons.org/licenses/by-nc-nd/3.0/) 17518695, 2019, 5, Downloaded from https://ietresearch.onlinelibrary.wiley.com/doi/10.1049/iet-gtd.2018.6452, Wiley Online Library on [13/03/2024]. See the Terms and Conditions (https://onlinelibrary.wiley.com/terms-and-conditions) on Wiley Online Library for rules of use; OA articles are governed by the applicable Creative Commons License This work is not intended to suggest that more investment is needed to improve distribution system reliability or that less investment is warranted for maintaining transmission system reliability. Rather, the purpose of this work is to facilitate dialogue among utilities and their regulatory agencies and state or local governments who are charged with making these determinations by providing them with more accurate information on the actual reliability performance of past (and future) efforts to maintain or improve reliability. 177 FERC ¶ 61,179
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 18 CFR Part 35 Docket No. RM20-16-000; Order No. 881 Managing Transmission Line Ratings (Issued December 16, 2021)
government reportNot linked to a paper · refsec
ORDER NO. 881 FINAL RULE (Issued December 16, 2021)
research reportNot linked to a paper · refsec
Fisher, Ryan. Bloomberg New Energy Finance. Commercial EV Charger Price Survey 2022: Pressure Mounts. September 16, 2022. March 2024 Charger Hardware Unit Cost per Port in 2021 Installation Cost per Port in 2021
newsNot linked to a paper · refsec
Edward S. Rubin, Inês M.L. Azevedo, Paulina Jaramillo, Sonia Yeh, A review of learning rates for electricity supply technologies, Energy Policy, Volume 86, 2015, Pages 198-218, ISSN 0301-4215, https://doi.org/10.1016/j.enpol.2015.06.011. Rupert Way, Matthew C. Ives, Penny Mealy, J. Doyne Farmer, Empirically grounded technology forecasts and the energy transition, Joule, Volume 6, Issue 9, 2022, Pages 2057-2082, ISSN 2542-4351, https://doi.org/10.1016/j.joule.2022.08.009.
Ziegler, Micah S. and Trancik, Jessika E., Re-examining rates of lithium-ion battery technology improvement and cost decline, The Royal Society of Chemistry, Volume 14, Issue 4, 2021, Pages 1635-1651, ISSN 1754-5692, https://pubs.rsc.org/en/content/articlelanding/2021/ee/d0ee02681f. Max Wei, Sarah Josephine Smith, Michael D. Sohn, Non-constant learning rates in retrospective experience curve analyses and their correlation to deployment programs, Energy Policy, Volume 107, 2017, Pages 356-369, ISSN 0301-4215, https://doi.org/10.1016/j.enpol.2017.04.035.
Brown, Abby, Jeff Cappellucci, Emily White, Alexia Heinrich, and Emma Cost. 2022. Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Second Quarter 2022. Golden, CO: National Renewable Energy Laboratory. NREL/TP-5400-84263. https://www.nrel.gov/docs/fy23osti/84263.pdf. March 2024 percentages of charging equipment cost reductions for 2022–2027 and 2028–2032 (Table 7). Similarly, installation costs could decrease as installers continue to accumulate experience with charging projects and identify efficiencies, but installation costs are notorious for being site-specific (proximity to an existing transformer is a key consideration), and per-site costs could plausibly increase as low-hanging fruit continues to be picked. For these reasons, this analysis assumed no reductions in installation costs. The base-year installation costs were applied to all future years to generate future EVSE capital cost trajectories (Figure 19). Table 7. Estimated Average Annual Percentages of Equipment Cost Reductions by EVSE Technological Advancement Scenarios and Charger Type
EVSE Scenarios Business as Usual High Learning Rate L2 Chargers 2022–2027 2028–2032 (Action/ (Action/ No Action) No Action) 2.9%/2.8% 2.1%/1.7% 5.9%/5.7% 8.9%/8.6% 5.7%/3.4% 8.6%/5.1% DCFCs 2022–2027 2028–2032 (Action/ (Action/ No Action) No Action) 3.0%/2.7% 1.9%/1.8% 6.0%/5.4% 9.1%/8.2% 3.9%/3.7% 6.0%/5.6% Figure 19. Projected EVSE capital cost (combined equipment and installation cost) trajectories for 2021–2032: (a) No Action scenario and (b) Action scenario. Estimates for out-of-scope costs—including the strategies charging networks might take to account for utility, DER, operations and maintenance, and construction costs, as well as solutions to reduce the magnitude of these cost and time requirements—are the subject of forthcoming Argonne National Laboratory technical report, “Innovative Charging Solutions for Deploying the National Charging Network,” conducted in parallel with this electrification impact analysis. March 2024
research reportNot linked to a paper · refsec
AL, AR, LA, OK, TX; West: WA, OR, CA, NV, ID, MT, WY, CO, NM. Pacific states (AK, HI) represent less than 1% of EVs in the U.S., and are included in the West category for readability and simplicity. For example, see: Public Advocates Office, Distribu�on Grid Electrifica�on Model – Study and Report, 2023, available at h�ps://www.publicadvocates. cpuc.ca.gov/-/media/cal-advocates-website/files/reports/230824-publicadvocates-distribu�on-grid-electrifica�on-model-study-and-report.pdf, and California Public U�li�es Commission, U�lity Cost and Affordability of the Grid of the Future: An Evalua�on of Electric Costs, Rates, and Equity Issues Pursueant to P.U. Code Sec�on 913.1, 2021. Available at: h�ps://www.cpuc.ca.gov/-/media/ cpuc-website/divisions/office-of-governmental-affairs-division/reports/2021/ senate-bill-695-report-2021-and-en-banc-whitepaper_final_04302021.pdf We analyzed revenues and costs from EVs in 49 states, excluding Alaska, as there was not sufficient data to conduct the analysis for that state. Atlas EV Hub. State EV Registra�on Data. Available at: h�ps://www.atlasevhub. com/materials/state-ev-registra�on-data/. California’s Avoided Cost Calculator (developed by E3) were used for distribu�on costs. We reduced these by 10 percent to mi�gate double coun�ng of distribu�on-related EV program costs. The load curve used for years 2011 through to 2020 are from United States Department of Energy, 2017, Na�onal Plug-In Electric Vehicle Infrastructure
research reportNot linked to a paper · refsec
Analysis, Available at: h�ps://www.nrel.gov/docs/fy17os�/69031.pdf. We developed a new average load curve for 2021, using data from DOE’s EVI-Pro Lite tool. We took an average of the load curves from each state’s largest city, weighted by number of registered EVs per state. Department of Energy, Alterna�ve Fuels Data Center. Data retrieved July 2023. Electric Vehicle Infrastructure Projec�on Tool (EVI-Pro) Lite. Available at: h�ps://afdc.energy. gov/evi-pro-lite.
research reportNot linked to a paper · refsec
Boudway, Ira. “More Than Half of US Car Sales Will Be Electric by 2030.” September 20, 2022. Bloomberg. Available at: h�ps://www.bloomberg.com/ news/ar�cles/2022-09-20/more-than-half-of-us-car-sales-will-be-electric-by2030. Na�onal average load curves from the U.S. DOE, 2017, Na�onal Plug-In Electric Vehicle Infrastructure Analysis, Available at: h�ps://www.nrel.gov/docs/ fy17os�/69031.pdf, and the U.S. DOE’s Alterna�ve Fuels Data Center’s Electric Vehicle Infrastructure Projec�on Tool (EVI-Pro) Lite tool, available at: h�ps:// afdc.energy.gov/evi-pro-lite. For instance, 17 states have a peak at 5pm and two states have a peak at 8am. California’s average peak is 6pm. Peak load data from U.S. Energy Informa�on Administra�on, form 930. This assumes that program costs are depreciated over 10 years. This assumes that program costs are depreciated over 10 years. The correla�on coefficient is 0.99 for all 49 states included in this analysis. When California is removed, the coefficient is 0.86. California is not included in figure. Coignard et al., “Will Electric Vehicles Drive Distribu�on Grid Upgrades?: The Case of California”. June 5, 2019. Ins�tute for Electrical and Electronics Engineers. Available at h�ps://ieeexplore.ieee.org/document/8732007. We assumed EVs were on non-TOU rates in California and TOU rates in Arizona (the majority of residen�al customers take service under TOU rates in Arizona). Data from 2021 Joint IOU Load Research and Charging Infrastructure Cost
newsNot linked to a paper · refsec
Report, filed on March 31, 2022. Public U�li�es Commission of the State of
research reportNot linked to a paper · refsec
California, Rulemaking 18-12-006. Available at: h�ps://www.cpuc.ca.gov/-/ media/cpuc-website/divisions/energy-division/documents/transporta�onelectrifica�on/10th-joint-iou-ev-load-report-mar-2022.pdf.
research reportNot linked to a paper · refsec
NEWS PROVIDED BY Honda 12 Sep, 2023, 10:15 ET ChargeScape will aim to unlock the full potential of electric vehicle (EV) technology through conveniently managed energy services never before possible with gasolinepowered vehicles – benefiting EV customers, electric utilities and automakers.
research reportNot linked to a paper · refsec
TORRANCE, Calif., Sept. 12, 2023 /PRNewswire/ -- BMW Group, Ford Motor Company and American Honda Motor Co., Inc. today announced that they have entered into an agreement to create ChargeScape, LLC, a new equally-owned company that will create a single, cost-effective platform connecting electric utilities, automakers and interested electric vehicle customers. Benefiting both EV customers and the electric utility industry in the U.S. and Canada, ChargeScape will unlock entirely new value that EVs can provide to the electric grid, while enabling EV customers to earn financial benefits through a variety of managed charging and energy-sharing services never before possible with traditional gasoline-powered vehicles. The closing of the transaction and subsequent formation of ChargeScape is pending regulatory approvals, with the company expected to be operational early next year. Continue Reading ChargeScape's platform will give electric utilities access to EV battery energy across a wide pool of EVs. Post this
research reportNot linked to a paper · refsec
Solar Photovoltaics Market,” Environmental Research Letters 10, no. 10 (2015): doi:10.1088/1748-9326/10/8/084001.
doi:10.1016/j.reseneeco.2011.06.003.
electricity market,” Journal of Industrial Economics 47, no. 3 (1999), 285–323, doi:10.1111/1467-6451.00102.
Resources,” Fisheries 39, no. 3 (2014): 108–22, doi:10.1080/03632415.2014.883570.
of Radiative Forcing at 3.4 W/m2,” Climate Policy 8, sup. 1 (2008): S76–92, doi:10.3763/cpol.2007.0495.
Environmental Research Letters 8 (2013): 014038, doi:10.1088/1748-9326/8/1/014038.
European Respiratory Journal 26, no. 2 (2005): 309–18, doi:10.1183/09031936.05.00001805.
Journal of the Air & Waste Management Association 56, no. 6 (2006): 709–42, doi:10.1080/10473289.2006.10464485.
1978 to 2000 (National Academies Press, 2001), 35, 197, doi:10.17226/10165.
Clean Electric Power Technologies (Washington, DC: National Academies Press, 2016), 5, 10–1, doi:10.17226/21712.
(Washington, DC: National Academies Press, 2010), https://doi.org/10.17226/12794.
States (National Energy Technology Laboratory, 2011), DOE/NETL-2011/1493, doi:10.2172/1013332.
Letters 8, no. 1 (2013): 015001, doi:10.1088/1748-9326/8/1/015001.
doi:10.1016/j.enpol.2010.05.013.
Network,” Avian Conservation and Ecology 8, no. 2 (2013): 7, doi:10.5751/ACE-00614-080207.
Environmental Policy 2, no. 2 (2013): 10, doi:10.5547/2160-5890.2.2.1.
1–36, doi:10.5547/ISSN0195-6574-EJ-Vol27-No1-2.
10.1109/AIEEPAS.1958.4500122.
1980): 1347–1356, doi: 10.1109/TPAS.1980.319557.
1103, doi: 10.1109/EE.1948.6444453.
no. 55 (July 1945): 289–290, doi: 10.1049/ji-1.1945.0075.
A.W. Bowyer, “Power distribution in industrial complexes,” Electronics and Power 19, no. 5 (March 1973): 94–97, doi: 10.1049/ep.1973.0139.
10.1109/TIGA.1970.4181180.
1956), doi: 10.1109/AIEEPAS.1956.4499339.
Electrical Engineers 67, no. 2 (January 1948): 1458–1461, doi: 10.1109/T-AIEE.1948.5059844.
242, doi: 10.1109/T-AIEE.1939.5057953.
61, no. 5 (May 1942): 249–255, doi: 10.1109/T-AIEE.1942.5058523.
Engineering 63, no. 9 (September 1944): 649–654, doi: 10.1109/EE.1944.6440478.
Institute of Electrical Engineers 70, no. 1 (June 1951): 138–143, doi: 10.1109/T-AIEE.1951.5060380.
Electrical Engineers. Part III: Power Apparatus and Systems 74, no. 3 (January 1955), doi: 10.1109/AIEEPAS.1955.4499225.
Engineers – Part II: Power Engineering 89, no. 8 (April 1942): 143–152, doi: 10.1049/ji-2.1942.0022.
10.1109/T-AIEE.1947.5059437.