Documents supporting the RIA and Preamble from Jung
Regulatory impact analysis2024-04-18 · EPA · regulatory_impact_analysis · EPA-HQ-OAR-2022-0829-5731
Original sourceAttachment (124 KB)Attachment (209 KB)Attachment (218 KB)Attachment (115 KB)Attachment (97 KB)Attachment (419 KB)Attachment (1.2 MB)Attachment (50 KB)Attachment (295 KB)Attachment (959 KB)Attachment (227 KB)Attachment (3.4 MB)Attachment (6.9 MB)Attachment (1.4 MB)Attachment (196 KB)Attachment (375 KB)Attachment (89 KB)Attachment (84 KB)Attachment (139 KB)Attachment (184 KB)Attachment (1.4 MB)Attachment (232 KB)Attachment (1.8 MB)Attachment (3.8 MB)Attachment (797 KB)Attachment (3.9 MB)Attachment (386 KB)Attachment (941 KB)Attachment (1.1 MB)Attachment (380 KB)Attachment (543 KB)Attachment (10.2 MB)Attachment (403 KB)Attachment (312 KB)Attachment (390 KB)Attachment (754 KB)Attachment (805 KB)Attachment (4.6 MB)Attachment (795 KB)Attachment (1.5 MB)
Other documents for the same rulemaking (all, by stage)
References: 1,981 extracted, 433 linked to papers
Page 2Download these results: CSV · JSON
https://www.oasis.oati.com/epe/index.html (El Paso Electric Co.)
https://www.oasis.oati.com/FPL/index.html (Florida Power & Light)
https://www.oasis.oati.com/SMCN/index.html (GridLiance)
https://www.oasis.oati.com/ipco/ (Idaho Power)
https://www.oasis.oati.com/LGEE/index.html (Louisville Gas and Electric)
http://www.oasis.oati.com/NEVP/ (Nevada Power)
http://www.oatioasis.com/NWMT/ (Northwestern Corp (Montana))
https://www.oasis.oati.com/PPW/ (PacifiCorp)
https://www.oasis.oati.com/PGE/ (Portland General Electric Company)
https://www.oasis.oati.com/psco/index.html (Public Service Company of Colorado)
https://www.oasis.oati.com/PNM/ (Public Service Company of New Mexico)
https://www.oasis.oati.com/psei/index.html (Puget Sound Energy)
https://www.oasis.oati.com/TEC/ (Tampa Electric Company)
https://www.oasis.oati.com/tsgt/index.html (Tri-State Generation and Transmission)
https://www.oasis.oati.com/tepc/ (Tucson Electric Power Co.)
U.S. Small Business Administration, A Guide for Government Agencies How to Comply with the Regulatory Flexibility Act, at 18 (Aug. 2017), https://cdn.advocacy.sba.gov/wp-content/uploads/2019/06/21110349/How-to-Comply-with-the-RFA.pdf.
General Electric Company Power Systems Load Flow (PSLF) data sheet
datasetNot linked to a paper · APPENDIX 1, LARGE GENERATING FACILITY DATA (MODELS FOR NON-SYNCHRONOUS GENERATORS)
IEEE
otherNot linked to a paper · APPENDIX 1, MODELS FOR NON-SYNCHRONOUS GENERATORS
PTI power flow models
otherNot linked to a paper · APPENDIX 1, MODELS FOR NON-SYNCHRONOUS GENERATORS
Siemens PSS/E*
otherNot linked to a paper · APPENDIX 1, Table 1: Acceptable Generic Library RMS Positive Sequence Dynamics Models
PowerWorld Simulator
otherNot linked to a paper · APPENDIX 1, Table 1: Acceptable Generic Library RMS Positive Sequence Dynamics Models
Western Electricity Coordinating Council
otherNot linked to a paper · APPENDIX 1, MODELS FOR NON-SYNCHRONOUS GENERATORS
Commercial Arbitration Rules of the American Arbitration Association
otherNot linked to a paper · Section 13.5.2 External Arbitration Procedures
ANSI/IEEE Standard C37.106
otherNot linked to a paper · Article 9.6.1.2 (Voltage Regulators) fn near 'ANSI/IEEE Standard C37.106'
ANSI Standard C84.1-1989
otherNot linked to a paper · Article 9.7.6 (Power Quality) 'ANSI Standard C84.1-1989'
IEEE Standard 519
otherNot linked to a paper · Article 9.7.6 (Power Quality) 'IEEE Standard 519'
Reliability Standard PRC-024-3
otherNot linked to a paper · Article 9.7.3 (Ride Through Capability and Performance) 'Reliability Standard PRC-024-3'
Joseph Rand et al., Lawrence Berkeley Nat’l Lab’y, Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022, at 7-8 (Apr. 2023), https://emp.lbl.gov/sites/default/files/queued_up_2022_04-06-2023.pdf
T. Bruce Tsuchida et al., The Brattle Grp., Unlocking the Queue with Grid-Enhancing Technologies: Case Study of the Southwest Power Pool at 9 (Feb. 1, 2021), https://watt-transmission.org/wp-content/uploads/2021/02/Brattle__Unlocking-the-Queue-with-Grid-Enhancing-Technologies__Final-Report_Public-Version.pdf90.pdf
Garrett Hering, California ISO Tackles ‘Broken’ Interconnection Process as Queue Tops 500 GW, S&P GLOBAL (July 19, 2023)
newsNot linked to a paper · Clements, Commissioner, concurring (P9)
CAISO, Cluster 15 Interconnection Requests, http://www.caiso.com/planning/Pages/GeneratorInterconnection/Default.aspx (last visited July 26, 2023).
CAISO, 2023 Interconnection Process Enhancements: Summary of June 20 & 21 Track 2 Working Group Meeting – Revised Principles and Problem Statements 1 and 2, at 4 (June 23, 2023), http://www.caiso.com/InitiativeDocuments/Revised-Principles-and-Problem-Statements-Interconnection-Process-Enhancements-2023-Track%202-Jun%2020-212023.pdf.
CAISO, 2023 Interconnection Process Enhancements Track 2 Working Group at 10 (July 11, 2023), http://www.caiso.com/InitiativeDocuments/Presentation-Interconnection-Process-Enhancements-2023-Track-2-Working-Group-Jul11-2023.pdf.
Southwest Power Pool, Consolidated Planning Process: Phase 1 Recommendations (May 17, 2023), https://www.spp.org/spp-documents-filings/?id=297513 (when accessing “CPPTF Meeting Materials 20230621”).
Southwest Power Pool, CPP Entry Fee Rate Structure, at 20 (July 14, 2023), https://www.spp.org/spp-documents-filings/?id=297513 (when accessing “CPPTF Meeting Materials 20230714”).
SPP & MISO, SPP-MISO Joint Targeted Interconnection Queue Cost Allocation and Affected System Study Process Changes White Paper (Dec. 20, 2022), https://www.spp.org/documents/68518/spp-miso%20jtiq%20study%20updated%20white%20paper%2020221220.pdf.
SPP & MISO, MISO-SPP Joint Targeted Interconnection Queue Update at 7 (March 27, 2023), https://cdn.misoenergy.org/20230337%20MISO%20SPP%20JTIQ%20Update628357.pdf.
MISO, MTEP21 Report Addendum: Long Range Transmission Planning Tranche 1 Executive Summary at 1 (2022), https://cdn.misoenergy.org/MTEP21%20Addendum-LRTP%20Tranche%201%20Report%20with%20Executive%20Summary625790.pdf.
Johannes Pfeifenberger, Planning for Generation Interconnection (May 31, 2022), https://www.brattle.com/wp-content/uploads/2022/05/Planning-for-Generation-Interconnection.pdf
Transforming the Nation’s Electricity System: The Second Installment of the QER, January 2017
government reportNot linked to a paper · Report Preface and Executive Summary
Blueprint for a Secure Energy Future (Mar. 30, 2011)
government reportNot linked to a paper · Presidential Memorandum (Preface)
Climate Action Plan (June 25, 2013)
government reportNot linked to a paper · Presidential Memorandum (Preface)
National Energy Strategy (1991)
government reportNot linked to a paper · Preface
Comprehensive Energy Strategy (1998)
government reportNot linked to a paper · Preface
National Energy Policy Development Group, National Energy Policy Report (2001)
government reportNot linked to a paper · Preface
Orison Swett Marden, ed., Little Visits with Great Americans: Or, Success, Ideals, and How to Attain Them (New York, NY: Success Company, 1903), digitized December 9, 2008, 30, https://books.google.com/books?id=7do8AAAAYAAJ.
“Frequently Asked Questions: How Many Power Plants Are There in the United States?” Energy Information Administration, accessed October 19, 2016, http://www.eia.gov/tools/faqs/faq.cfm?id=65&t=2.
Ellen Flynn Giles and Kathy L. Brown, eds., 2015 UDI Directory of Electric Power Producers and Distributors: 123rd Edition of the Electrical World Directory (New York, NY: Platts, 2014), vi–vii, https://www.platts.com/im.platts.content/downloads/udi/eppd/eppddir.pdf.
Julia Pyper, “The US Solar Market Is Now 1 Million Installations Strong,” Greentech Media, April 21, 2016, https://www.greentechmedia.com/articles/read/The-U.S.-Solar-Market-Now-One-Million-Installations-Strong.
“Electric Substations,” Platts, generated March 6, 2009, http://www.platts.com/IM.Platts.Content/ProductsServices/Products/gismetadata/substatn.pdf.