Policy Replication

Oil and Gas and Sulfur Operations in the Outer Continental Shelf-Blowout Preventer Systems and Well Control Revisions

Federal Register2019-05-15 · DEPARTMENT OF THE INTERIOR; Bureau of Safety and Environmental Enforcement · Rule · 2019-09362
Final rule.

The Bureau of Safety and Environmental Enforcement (BSEE) is revising existing regulations for well control and blowout preventer systems. This final rule revises requirements for well design, well control, casing, cementing, real-time monitoring (RTM), and subsea containment. These revisions modify regulations pertaining to offshore oil and gas drilling, completions, workovers, and decommissioning in accordance with Executive and Secretary of the Interior's Orders to ensure safety and environmental protection, while correcting errors and reducing certain unnecessary regulatory burdens imposed under the existing regulations. Accordingly, after thoroughly reexamining the 2016 Blowout Preventer Systems and Well Control final rule (WCR), experiences from the implementation process, and various BSEE policies (notices to lessees, answers to frequently asked questions, and conditions of approval), BSEE will amend, revise, or remove certain current regulatory provisions that create unnecessary burdens on stakeholders, while still maintaining safety and environmental protection. The final regulations also address various issues and errors that BSEE identified during the implementation of the 2016 WCR.

RIN 1014-AA39 · Docket BSEE-2018-0002

Other documents for the same rulemaking

2018-05-11 Federal RegisterOil and Gas and Sulfur Operations in the Outer Continental Shelf-Blowout Preventer Systems and Well Control Revisions
2018-05-11 Docket documentAA39 IRIA
2018-07-05 Federal RegisterOil and Gas and Sulfur Operations in the Outer Continental Shelf-Blowout Preventer Systems and Well Control Revisions; Correction; Extension of Comment Period
2019-05-15 Regulatory impact analysisAA39 Final RIA

References: 7 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
Annual reports for 2016 and 2017 reporting periods for well control regulations are available at: https://www.safeocs.gov/wcr_home.htm.
government reportNot linked to a paper · fn 30 · cited link
API 16TR1, Shear Ram Performance Test Protocol
otherNot linked to a paper · Comments Related to Proposed § 250.732(a)(2)(ii)—Lab 30 Minute vs 5 Minute Pressure Hold Time
API Standard 53, Blowout Prevention Equipment Systems for Drilling Wells, Fourth Edition, November 2012, Addendum 1, July 2016
otherNot linked to a paper · Documents incorporated by reference (§ 250.198)
Final Report on the Investigation of the Macondo Well Blowout, Deepwater Horizon Study Group (March 1, 2011)
research reportNot linked to a paper · Comments Related to Proposed § 250.198—Effectiveness of Using Industry Standards
Blowout Prevention Safety System—2017 Annual Report
government reportNot linked to a paper · IV. Discussion of Public Comments on the Proposed Rule, C. 21-Day BOP Testing Frequency · cited link
Risk-Based Evaluation of Offshore Oil and Gas Operations Using a Multiple Physical Barrier Approach
research reportNot linked to a paper · F. Economic Comments, Comments on Lack of a Risk Analysis or Risk Assessment and Financial Analysis · cited link
Blowout Preventions System Events and Equipment Component Failures 2016 Annual Report
government reportNot linked to a paper · F. Economic Comments, Comments on Lack of a Risk Analysis or Risk Assessment and Financial Analysis · cited link