{"document":{"doc_id":7759,"source":"fr_rule","org":"DEPARTMENT OF THE INTERIOR; Bureau of Safety and Environmental Enforcement","doc_type":"Rule","title":"Oil and Gas and Sulfur Operations in the Outer Continental Shelf-Blowout Preventer Systems and Well Control Revisions","date":"2019-05-15","url":"https://www.federalregister.gov/documents/2019/05/15/2019-09362/oil-and-gas-and-sulfur-operations-in-the-outer-continental-shelf-blowout-preventer-systems-and-well","source_native_id":"2019-09362","status":"fetched","abstract":"The Bureau of Safety and Environmental Enforcement (BSEE) is revising existing regulations for well control and blowout preventer systems. This final rule revises requirements for well design, well control, casing, cementing, real-time monitoring (RTM), and subsea containment. These revisions modify regulations pertaining to offshore oil and gas drilling, completions, workovers, and decommissioning in accordance with Executive and Secretary of the Interior's Orders to ensure safety and environmental protection, while correcting errors and reducing certain unnecessary regulatory burdens imposed under the existing regulations. Accordingly, after thoroughly reexamining the 2016 Blowout Preventer Systems and Well Control final rule (WCR), experiences from the implementation process, and various BSEE policies (notices to lessees, answers to frequently asked questions, and conditions of approval), BSEE will amend, revise, or remove certain current regulatory provisions that create unnecessary burdens on stakeholders, while still maintaining safety and environmental protection. The final regulations also address various issues and errors that BSEE identified during the implementation of the 2016 WCR.","action":"Final rule."},"dockets":["BSEE-2018-0002"],"rins":["RIN 1014-AA39"],"related":[{"doc_id":8460,"source":"fr_rule","org":"DEPARTMENT OF THE INTERIOR; Bureau of Safety and Environmental Enforcement","doc_type":"Proposed Rule","title":"Oil and Gas and Sulfur Operations in the Outer Continental Shelf-Blowout Preventer Systems and Well Control Revisions","date":"2018-05-11"},{"doc_id":129853,"source":"docket_item","org":"BSEE","doc_type":"analysis","title":"AA39 IRIA","date":"2018-05-11"},{"doc_id":8354,"source":"fr_rule","org":"DEPARTMENT OF THE INTERIOR; Bureau of Safety and Environmental Enforcement","doc_type":"Proposed Rule (administrative)","title":"Oil and Gas and Sulfur Operations in the Outer Continental Shelf-Blowout Preventer Systems and Well Control Revisions; Correction; Extension of Comment Period","date":"2018-07-05"},{"doc_id":7871,"source":"ria","org":"BSEE","doc_type":"regulatory_impact_analysis","title":"AA39 Final RIA","date":"2019-05-15"}],"references":[{"citation_id":34320,"raw_reference":"Annual reports for 2016 and 2017 reporting periods for well control regulations are available at: https://www.safeocs.gov/wcr_home.htm.","cited_authors":null,"cited_year":null,"cited_title":"Annual reports for 2016 and 2017 reporting periods for well control regulations","cited_venue":"SafeOCS","cited_doi":null,"cited_url":"https://www.safeocs.gov/wcr_home.htm","ref_kind":"government_report","section":"fn 30","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":34321,"raw_reference":"API 16TR1, Shear Ram Performance Test Protocol","cited_authors":"American Petroleum Institute","cited_year":null,"cited_title":"Shear Ram Performance Test Protocol","cited_venue":"American Petroleum Institute","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Comments Related to Proposed § 250.732(a)(2)(ii)—Lab 30 Minute vs 5 Minute Pressure Hold Time","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":37088,"raw_reference":"API Standard 53, Blowout Prevention Equipment Systems for Drilling Wells, Fourth Edition, November 2012, Addendum 1, July 2016","cited_authors":"American Petroleum Institute","cited_year":"2012","cited_title":"Blowout Prevention Equipment Systems for Drilling Wells","cited_venue":"API","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Documents incorporated by reference (§ 250.198)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":39798,"raw_reference":"Final Report on the Investigation of the Macondo Well Blowout, Deepwater Horizon Study Group (March 1, 2011)","cited_authors":"Deepwater Horizon Study Group","cited_year":"2011","cited_title":"Final Report on the Investigation of the Macondo Well Blowout","cited_venue":"Deepwater Horizon Study Group","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Comments Related to Proposed § 250.198—Effectiveness of Using Industry Standards","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":39799,"raw_reference":"Blowout Prevention Safety System—2017 Annual Report","cited_authors":"U.S. Department of Transportation Bureau of Transportation Statistics","cited_year":"2017","cited_title":"Blowout Prevention Safety System—2017 Annual Report","cited_venue":"SafeOCS, Bureau of Transportation Statistics","cited_doi":null,"cited_url":"https://www.safeocs.gov/2017_WCR_Annual_Report_v4.pdf","ref_kind":"government_report","section":"IV. Discussion of Public Comments on the Proposed Rule, C. 21-Day BOP Testing Frequency","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":39800,"raw_reference":"Risk-Based Evaluation of Offshore Oil and Gas Operations Using a Multiple Physical Barrier Approach","cited_authors":"Argonne National Laboratory","cited_year":"2017","cited_title":"Risk-Based Evaluation of Offshore Oil and Gas Operations Using a Multiple Physical Barrier Approach","cited_venue":"Argonne National Laboratory","cited_doi":null,"cited_url":"https://www.bsee.gov/research-record/risk-based-evaluation-of-offshore-oil-and-gas-operations-using-a-multiple-physical","ref_kind":"research_report","section":"F. Economic Comments, Comments on Lack of a Risk Analysis or Risk Assessment and Financial Analysis","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":39801,"raw_reference":"Blowout Preventions System Events and Equipment Component Failures 2016 Annual Report","cited_authors":"U.S. Department of Transportation Bureau of Transportation Statistics","cited_year":"2016","cited_title":"Blowout Preventions System Events and Equipment Component Failures","cited_venue":"SafeOCS, Bureau of Transportation Statistics","cited_doi":null,"cited_url":"https://www.safeocs.gov/wcr_home.htm","ref_kind":"government_report","section":"F. Economic Comments, Comments on Lack of a Risk Analysis or Risk Assessment and Financial Analysis","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}