Policy Replication

General Services Administration Acquisition Regulation (GSAR); Adoption of Construction Project Delivery Method Involving Early Industry Engagement-Construction Manager as Constructor (CMc)

Federal Register2019-12-19 · GENERAL SERVICES ADMINISTRATION · Rule · 2019-26367
Final rule.

The General Services Administration (GSA) is issuing a final rule amending the General Services Administration Acquisition Regulation (GSAR) to adopt an additional project delivery method for construction, known as "construction manager as constructor" (CMc). The private sector commonly uses a similar construction project delivery method, which allows for early industry engagement by the construction contractor to enable reduced cost growth, reduced schedule growth, and administrative savings. The current Federal Acquisition Regulation (FAR) lacks coverage of the CMc project delivery method. GSA has previously issued policies on CMc through other means. Incorporating CMc into the GSAR provides centralized guidance to industry and ensures consistent application of construction project principles across GSA. Additionally, integrating these requirements into the GSAR allowed for revision and improvement of the requirements through public comments in the rulemaking process.

RIN 3090-AJ64 · Docket GSA-GSAR-2018-0013, Docket GSAR-2018-0013

Other documents for the same rulemaking (all, by stage)

2018-11-27 Federal RegisterGeneral Services Administration Acquisition Regulation (GSAR); Adoption of Construction Project Delivery Method Involving Early Industry Engagement-Construction Manager as Constructor (CMc); Correction

References: 1 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
Leicht, R.M., Molenaar, K.R., Messner, J.I., Franz, B.W., and Esmaeili, B. (2015). Maximizing Success in Integrated Projects: An Owner's Guide. Version 0.9, May. Available at http://bim.psu.edu/delivery.
research reportNot linked to a paper · fn 2 · cited link