{"document":{"doc_id":7318,"source":"fr_rule","org":"GENERAL SERVICES ADMINISTRATION","doc_type":"Rule","title":"General Services Administration Acquisition Regulation (GSAR); Adoption of Construction Project Delivery Method Involving Early Industry Engagement-Construction Manager as Constructor (CMc)","date":"2019-12-19","url":"https://www.federalregister.gov/documents/2019/12/19/2019-26367/general-services-administration-acquisition-regulation-gsar-adoption-of-construction-project","source_native_id":"2019-26367","status":"fetched","abstract":"The General Services Administration (GSA) is issuing a final rule amending the General Services Administration Acquisition Regulation (GSAR) to adopt an additional project delivery method for construction, known as \"construction manager as constructor\" (CMc). The private sector commonly uses a similar construction project delivery method, which allows for early industry engagement by the construction contractor to enable reduced cost growth, reduced schedule growth, and administrative savings. The current Federal Acquisition Regulation (FAR) lacks coverage of the CMc project delivery method. GSA has previously issued policies on CMc through other means. Incorporating CMc into the GSAR provides centralized guidance to industry and ensures consistent application of construction project principles across GSA. Additionally, integrating these requirements into the GSAR allowed for revision and improvement of the requirements through public comments in the rulemaking process.","action":"Final rule."},"dockets":["GSA-GSAR-2018-0013","GSAR-2018-0013"],"rins":["RIN 3090-AJ64"],"related":[{"doc_id":8100,"source":"fr_rule","org":"GENERAL SERVICES ADMINISTRATION","doc_type":"Proposed Rule (administrative)","title":"General Services Administration Acquisition Regulation (GSAR); Adoption of Construction Project Delivery Method Involving Early Industry Engagement-Construction Manager as Constructor (CMc); Correction","date":"2018-11-27"}],"references":[{"citation_id":27319,"raw_reference":"Leicht, R.M., Molenaar, K.R., Messner, J.I., Franz, B.W., and Esmaeili, B. (2015). Maximizing Success in Integrated Projects: An Owner's Guide. Version 0.9, May. Available at http://bim.psu.edu/delivery.","cited_authors":"Leicht, R.M.; Molenaar, K.R.; Messner, J.I.; Franz, B.W.; Esmaeili, B.","cited_year":"2015","cited_title":"Maximizing Success in Integrated Projects: An Owner's Guide","cited_venue":"Pankow Foundation","cited_doi":null,"cited_url":"http://bim.psu.edu/delivery","ref_kind":"research_report","section":"fn 2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}