Policy Replication

U.S. DOT/FRA -VTI Final Rule Regulatory Impact Analysis

Regulatory impact analysis2013-03-12 · FRA · regulatory_impact_analysis · FRA-2009-0036-0017
RIN 2130-AC09 · Docket FRA-2009-0036

Other documents for the same rulemaking (all, by stage)

2010-05-07 Docket documentRelative Impacts of On-Time Performance and Travel Time Improvements for Amtrak's Acela Express service in the NEC (February 18, 2009)
2010-05-10 Federal RegisterVehicle/Track Interaction Safety Standards; High-Speed and High Cant Deficiency Operations
2013-03-12 Docket documentU.S. DOT/FRA - Communications with RSAC on VTI Consensus Recommendations
2013-03-13 Federal RegisterVehicle/Track Interaction Safety Standards; High-Speed and High Cant Deficiency Operations

References: 4 extracted, 2 linked to papers

Page 1Download these results: CSV · JSON
Development of Gage Widening Projection Parameter for the Deployable Gage Restraint Measurement System (DOT/FRA/ORD-06/13, October 2006)
International Union of Railways (UIC) Code 518, Testing and Approval of Railway Vehicles from the Point of View of Their Dynamic Behaviour – Safety – Track Fatigue – Ride Quality, Ed. 4 (2009)
otherNot linked to a paper · Section 213.57 Curves; Elevation and Speed Limitations
Development of Gage Widening Projection Parameter for the Deployable Gage Restraint Measurement System
Relative Impacts of On-Time Performance and Travel Time Improvements for Amtrak Acela Express Service in the NEC, February 18, 2009, AECOM.
research reportNot linked to a paper · fn 1 (Section 7.1 Benefits)