{"document":{"doc_id":62693,"source":"ria","org":"FRA","doc_type":"regulatory_impact_analysis","title":"U.S. DOT/FRA -VTI Final Rule Regulatory Impact Analysis","date":"2013-03-12","url":"https://www.regulations.gov/document/FRA-2009-0036-0017","source_native_id":"FRA-2009-0036-0017","status":"fetched","abstract":null,"action":null},"dockets":["FRA-2009-0036"],"rins":["RIN 2130-AC09"],"related":[{"doc_id":262858,"source":"docket_item","org":"FRA","doc_type":"other","title":"Relative Impacts of On-Time Performance and Travel Time Improvements for Amtrak's Acela Express service in the NEC (February 18, 2009)","date":"2010-05-07"},{"doc_id":15048,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Federal Railroad Administration","doc_type":"Proposed Rule","title":"Vehicle/Track Interaction Safety Standards; High-Speed and High Cant Deficiency Operations","date":"2010-05-10"},{"doc_id":251807,"source":"docket_item","org":"FRA","doc_type":"report","title":"U.S. DOT/FRA - Communications with RSAC on VTI Consensus Recommendations","date":"2013-03-12"},{"doc_id":12506,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Federal Railroad Administration","doc_type":"Rule","title":"Vehicle/Track Interaction Safety Standards; High-Speed and High Cant Deficiency Operations","date":"2013-03-13"}],"references":[{"citation_id":353996,"raw_reference":"Development of Gage Widening Projection Parameter for the Deployable Gage Restraint Measurement System (DOT/FRA/ORD-06/13, October 2006)","cited_authors":null,"cited_year":"2006","cited_title":"Development of Gage Widening Projection Parameter for the Deployable Gage Restraint Measurement System","cited_venue":"DOT/FRA/ORD-06/13","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 213.110 Gage Restraint Measurement Systems","page":null,"context_sentence":null,"paper_id":73313,"paper_title":"Development of Gage Widening Projection Parameter for the Deployable Gage Restraint Measurement System","paper_year":2006,"paper_doi":null},{"citation_id":353997,"raw_reference":"International Union of Railways (UIC) Code 518, Testing and Approval of Railway Vehicles from the Point of View of Their Dynamic Behaviour – Safety – Track Fatigue – Ride Quality, Ed. 4 (2009)","cited_authors":"International Union of Railways (UIC)","cited_year":"2009","cited_title":"Testing and Approval of Railway Vehicles from the Point of View of Their Dynamic Behaviour – Safety – Track Fatigue – Ride Quality","cited_venue":"UIC Code 518, Ed. 4","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section 213.57 Curves; Elevation and Speed Limitations","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":356026,"raw_reference":"Development of Gage Widening Projection Parameter for the Deployable Gage Restraint Measurement System","cited_authors":null,"cited_year":null,"cited_title":"Development of Gage Widening Projection Parameter for the Deployable Gage Restraint Measurement System","cited_venue":"FRA","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section 213.333 (GRMS testing discussion)","page":null,"context_sentence":null,"paper_id":73313,"paper_title":"Development of Gage Widening Projection Parameter for the Deployable Gage Restraint Measurement System","paper_year":2006,"paper_doi":null},{"citation_id":356027,"raw_reference":"Relative Impacts of On-Time Performance and Travel Time Improvements for Amtrak Acela Express Service in the NEC, February 18, 2009, AECOM.","cited_authors":"AECOM","cited_year":"2009","cited_title":"Relative Impacts of On-Time Performance and Travel Time Improvements for Amtrak Acela Express Service in the NEC","cited_venue":"AECOM","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"fn 1 (Section 7.1 Benefits)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}