SECY-23-0021: Enclosure 3 - Draft Regulatory Analysis
Other documents for the same rulemaking (all, by stage)
References: 10 extracted, 0 linked to papers
NUREG/BR-0058, draft Revision 5, "Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission," issued January 2020 (NRC, 2020a).
NUREG/CR-3568, "A Handbook for Value-Impact Assessment," issued December 1983 (NRC, 1983).
NEI 18-04, Revision 1, "Risk-Informed Performance-Based Technology Inclusive Guidance for Non‑Light Water Reactor Licensing Basis Development," in August 2019 (NEI, 2019).
NEI 21-07, Revision 1, "Technology Inclusive Guidance for Non-Light Water Reactors Safety Analysis Report Content for Applicants Using NEI 18-04 Methodology," dated March 1, 2022 (NEI, 2022).
"NRC Vision and Strategy: Safely Achieving Effective and Efficient Non-Light Water Reactor Mission Readiness," issued December 2016 (NRC, 2016)
Nuclear Power Plant Licensing Process, Backgrounder, July 2020 (NRC, 2020e).
"Report to Congress: Advanced Reactor Licensing," issued August 2012 (NRC, 2012)
Non-Light Water Reactor Review Strategy Staff White Paper, issued September 2019 (NRC, 2019a).
Bureau of Labor Statistics, May 2021 National Industry-Specific Occupational Employment and Wage Estimates; NAICS 221113—Nuclear Electric Power Generation (BLS, 2021).
OMB, 2003. "Regulatory Analysis," Circular A-4, Office of Management and Budget, Washington, DC, October 9, 2003.