Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors
The U.S. Nuclear Regulatory Commission (NRC) is proposing to revise the NRC's regulations by adding a risk-informed, performance- based, and technology-inclusive regulatory framework for commercial nuclear plants in response to the Nuclear Energy Innovation and Modernization Act (NEIMA). The NRC plans to hold a public meeting to promote full understanding of the proposed rule and facilitate public comments.
Original sourceXML (1.9 MB)PDF (2.2 MB)
Other documents for the same rulemaking (all, by stage)
References: 33 extracted, 5 linked to papers
RG 1.233, "Guidance for a Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors"
NUREG-2246, "Fuel Qualification for Advanced Reactors"
NEI 21-07, Revision 1, Technology-Inclusive Content of Application Project guidance
NEI 18-04, Rev. 1, "Risk-Informed Performance-Based Technology-Inclusive Guidance for Non-Light Water Reactors," dated August 2019
NIA, "Clarifying `Major Portions' of a Reactor Design in Support of a Standard Design Approval," dated April 2017
NRC, "A Regulatory Review Roadmap for Non-Light Water Reactors," dated December 2017
NRC, "Risk-Informed and Performance-Based Human-System Considerations for Advanced Reactors," dated March 2021
NUREG-0880, "Safety Goals for Nuclear Power Plant Operation," dated May 1983
NUREG-1530, Revision 1, "Reassessment of NRC's Dollar Per Person-Rem Conversion Factor Policy, Final Report," dated February 2022
NUREG/CR-5884, "Revised Analyses of Decommissioning for the Reference Pressurized Water Reactor Power Station," dated November 1995
NUREG/CR-6187, Volume 1, "Revised Analyses of Decommissioning for the Reference Boiling Water Reactor Power Station," dated July 1996
PNNL, Technical Letter Report, "The Use of Electronic Communications to Perform Determinations of Fitness," dated August 2017
Research Information Letter 2021-04, "Feasibility Study on a Potential Consequence-Based Seismic Design Approach for Nuclear Facilities," dated April 2021
ASCE/SEI 43-19, "Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities"
ASME/ANS RA-S-1.4-2021, "Probabilistic Risk Assessment Standard for Advanced Non-Light Water Reactor Nuclear Power Plants"
National Library of Medicine, National Institutes of Health, Workshop Summary, "The Evolution of Telehealth: Where Have We Been and Where Are We Going?," dated November 2012
NEI 18-04, Revision 1, "Risk-Informed Performance-Based Technology Inclusive Guidance for Non-Light Water Reactor Licensing Basis Development," issued August 2019
NRC Vision and Strategy: Safely Achieving Effective and Efficient Non-Light-Water Mission Readiness
Report to Congress: Advanced Reactor Licensing, issued August 2012
ASCE/SEI 43-19, "Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities."
NUREG/BR-0058, "Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission"
SECY-18-0096
RA-S-1.4-2021, ASME/ANS Risk Assessment Standard
NUREG/CR-5884, “Revised Analyses of Decommissioning for the Reference Pressurized Water Reactor Power Station,”
NUREG/CR-6187, “Revised Analyses of Decommissioning for the Reference Boiling Water Reactor Power Station.”
A Regulatory Review Roadmap for Non-Light Water Reactors
Nuclear Innovation Alliance report “Clarifying `Major Portions' of a Reactor Design in Support of a Standard Design Approval.”
Irene Wærø, Ragnar Rosness, and Stine Skaufel Kilska, “Human performance and safety in Arctic environments,” SINTEF (2018).
Russell Mannion and Carl Thompson, “Systematic biases in group decision-making: implications for patient safety,” International Journal for Quality I Health Care, Vol. 26, No. 6 (2014): 606-612
David Hofmann and Adam Stetzer, “A Cross-Level Investigation of Factors Influencing Unsafe Behaviors and Accidents,” Personnel Psychology, Vol. 49 (1996)
DG-5073, “Fitness-of-Duty Programs for Commercial Nuclear Plants and Manufacturing Facilities Licensed Under 10 CFR part 53,”
DG-5078, “Fatigue Management for Nuclear Power Plant Personnel at Commercial Nuclear Plants Licensed Under 10 CFR part 53,”
PNNL, Technical Letter Report, “The Use of Electronic Communications to Perform Determinations of Fitness,” dated August 2017.