GAO Cost Estimating and Assessment Guide: Best Practices for Developing and Managing Capital Program Costs (Supersedes GAO-07-1134SP)
Original sourceWeb page (79 KB)PDF (4.5 MB)
References: 72 extracted, 2 linked to papers
Abba, Wayne. Earned Value Management: The Good, the Bad, and the Really Ugly. Falls Church, Va.: Abba Consulting, Dec. 21, 2004.
Christensen, David S. Determining an Accurate Estimate at Completion. Cedar City: Southern Utah University, 1993.
Christensen, David S., and Carl Templin. An Analysis of Management Reserve Budget on Defense Acquisition Contracts. Cedar City: Southern Utah University, 2000.
Garvey, Paul R. Cost Risk Analysis without Statistics!! McLean, Va.: MITRE, February, 2005.
Higdon, Greg, Lew Fichter, and Alfred Smith. Cost Uncertainty Analysis: Observations from the Field. Santa Barbara, Calif.: Tecolote Research, April 2008.
Hulett, David T. Integrated Cost and Schedule Risk Analysis. Washington, D.C.: Hulett and Associates, 2007.
Lavdas, Evaggelos. Identifying the Characteristics of a Good Cost Estimate: A Survey. Cranfield, Bedfordshire, Eng.: Cranfield University, June 2006.
Lipke, Walter H. Independent Estimate at Completion: Another Method. Tinker Air Force Base, Okla.: October 2004.
Lorell, Mark A., Julia F. Lowell, and Obaid Younossi. Evolutionary Acquisition Implementation Challenges for Defense Space Programs. Arlington, Va.: RAND, 2006.
RAND. Impossible Certainty: Cost Risk Analysis for Air Force Systems. Arlington, Va.: 2006.
Kahneman, Daniel, and Dan Lovallo. Delusions of Success: How Optimism Undermines Executives' Decisions. Harvard Business Review, July 2003.
Wideman, Max R. A Pragmatic Approach to Using Resource Loading, Production, and Learning Curves on Construction Projects. Canadian Journal of Civil Engineering 21 (1994): 939–53.
Druker, Eric, Christina Kanick, and Richard Coleman. The Challenges of (and Solutions for) Estimating Percentiles of Cost. Arlington, Va.: Northrop Grumman, Aug. 11, 2008.
GAO. 21st Century Challenges: Reexamining the Base of the Federal Government, GAO-05-325SP. Washington, D.C.: February 2005.
GAO. Air Traffic Control: FAA Uses Earned Value Techniques to Help Manage Information Technology Acquisitions, but Needs to Clarify Policy and Strengthen Oversight, GAO-08-756. Washington, D.C.: July 18, 2008.
GAO. Defense Acquisitions: Assessments of Selected Major Weapon Programs, GAO-06-391. Washington, D.C.: Mar. 31, 2006.
GAO. Defense Acquisitions: Improved Management Practices Could Help Minimize Cost Growth in Navy Shipbuilding Programs, GAO-05-183. Washington, D.C.: Feb. 28, 2005.
GAO. Defense Acquisition: A Knowledge-Based Funding Approach Could Improve Weapon System Program Outcomes, GAO-08-619. Washington, D.C.: June 2008.
GAO. Space Acquisitions: DOD Needs to Take More Action to Address Unrealistic Initial Cost Estimates of Space Systems, GAO-07-96. Washington, D.C.: Nov. 17, 2006.
GAO. Uncertainties Remain Concerning the Airborne Laser's Cost and Military Utility, GAO-04-643R. Washington, D.C.: May 17, 2004.
GAO. Cooperative Threat Reduction: DOD Needs More Reliable Data to Better Estimate the Cost and Schedule of the Shchuch'ye Facility, GAO-06-692. Washington, D.C.: May 31, 2006.
Comptroller General of the United States, Theory and Practice of Cost Estimating for Major Acquisitions, B-163058 (Washington, D.C.: July 24, 1972), p. 1.
GAO, NASA: Lack of Disciplined Cost-Estimating Processes Hinders Effective Program Management, GAO-04-642 (Washington, D.C.: May 28, 2004).
GAO, Customs Service Modernization: Serious Management and Technical Weaknesses Must Be Corrected, GAO/AIMD-99-41 (Washington, D.C.: Feb. 26, 1999).
GAO, Space Acquisitions: DOD Needs to Take More Action to Address Unrealistic Initial Cost Estimates of Space Systems, GAO-07-96 (Washington, D.C.: Nov. 17, 2006).
GAO, Combating Nuclear Smuggling: DHS Has Made Progress Deploying Radiation Detection Equipment at U.S. Ports-of-Entry, but Concerns Remain, GAO-06-389 (Washington, D.C.: Mar. 22, 2006).
GAO, Defense Acquisitions: Improved Management Practices Could Help Minimize Cost Growth in Navy Shipbuilding Programs, GAO-05-183 (Washington, D.C.: Feb. 28, 2005).
GAO, Defense Acquisitions: Missile Defense Agency Fields Initial Capability but Falls Short of Original Goals, GAO-06-327 (Washington, D.C.: Mar. 15, 2006).
GAO, Cooperative Threat Reduction: DOD Needs More Reliable Data to Better Estimate the Cost and Schedule of the Shchuch'ye Facility, GAO-06-692 (Washington, D.C.; May 31, 2006).
GAO, Combating Nuclear Smuggling: DHS's Cost-Benefit Analysis to Support the Purchase of New Radiation Detection Portal Monitors Was Not Based on Available Performance Data and Did Not Fully Evaluate All the Monitors' Costs and Benefits, GAO-07-133R (Washington, D.C.: Oct. 17, 2006).
GAO, Best Practices: Better Acquisition Outcomes Are Possible If DOD Can Apply Lessons from F/A-22 Program, GAO-03-645T (Washington, D.C.: Apr. 11, 2003), pp. 2–3.
GAO, DOD Systems Modernization: Planned Investment in the Naval Tactical Command Support System Needs to Be Reassessed, GAO-06-215 (Washington, D.C.: Dec. 5, 2005).
GAO, Best Practices: Successful Application to Weapon Acquisitions Requires Changes in DOD's Environment, GAO/NSIAD-98-56 (Washington, D.C.: Feb. 24, 1998), pp. 8 and 62.
GAO, 21st Century Challenges: Reexamining the Base of the Federal Government, GAO-05-325SP (Washington, D.C.: February 2005), p. 1.
Daniel D. Galorath, Software Projects on Time and within Budget—Galorath: The Power of Parametrics, PowerPoint presentation, El Segundo, California, n.d., p. 3. http://www.galorath.com/wp/software-project-failure-costs-billions-better-estimation-planning-can-help.php.
Jim Johnson and others, “Collaboration: Development and Management—Collaborating on Project Success,” Software Magazine, Sponsored Supplement, February–March 2001, p. 2.
Pat Phelan, Estimating the Time and Cost of ERP Implementation Projects Is a 10-Step Process (Stamford, Conn.: Gartner Inc., Apr. 10, 2006), p. 3.
Derek Slater, “The Hidden Costs of Enterprise Software,” CIO Enterprise Magazine, Jan. 15, 1998.
R. Max Wideman, FCSCE, “A Pragmatic Approach to Using Resource Loading, Production and Learning Curves on Construction Projects.”
Stephen A. Book, “Do Not Sum ‘Most Likely’ Costs,” presentation to American Society of Military Comptrollers, Los Angeles, California, April 30, 2002.
Air Force Cost Analysis Agency’s Cost Risk and Uncertainty Analysis Handbook (Goleta, Calif.: Tecolote Research, Inc., April 2007).
Paul Garvey, Probability Methods for Cost Uncertainty Analysis
© 2003, Society of Cost Estimating and Analysis, "Earned Value Management Systems (EVMS) Tracking Cost and Schedule Performance on Projects," p. 7.
DOD, The Program Manager's Guide to the Integrated Baseline Review Process (Washington, D.C.: Office of the Secretary of Defense (AT&L), April 2003).
David S. Christensen, Determining an Accurate Estimate at Completion (Cedar City: Southern Utah University, 1993), p. 7.
GAO, National Airspace System: Better Cost Data Could Improve FAA's Management of the Standard Terminal Automation Replacement System, GAO-03-343 (Jan. 31, 2003).
GAO, Uncertainties Remain Concerning the Airborne Laser's Cost and Military Utility, GAO-04-643R (Washington, D.C.: Mar. 17, 2004).
Ivan Bembers and others, Over Target Baseline and Over Schedule Handbook (n.p., n.p.: May 7, 2003).
NDIA, National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC) Surveillance Guide (Arlington, Va.: October 2004).
National Airspace System: Better Cost Data Could Improve FAA's Management of the Standard Terminal Automation Replacement System (Jan. 31, 2003)