Policy Replication

GAO Cost Estimating and Assessment Guide: Best Practices for Developing and Managing Capital Program Costs (Supersedes GAO-07-1134SP)

GAO report2009-03-02 · GAO · Special Publication · GAO-09-3SP

References: 72 extracted, 2 linked to papers

Page 1Download these results: CSV · JSON
Abba, Wayne. Earned Value Management: The Good, the Bad, and the Really Ugly. Falls Church, Va.: Abba Consulting, Dec. 21, 2004.
otherNot linked to a paper · References
Christensen, David S. Determining an Accurate Estimate at Completion. Cedar City: Southern Utah University, 1993.
research reportNot linked to a paper · References
Christensen, David S., and Carl Templin. An Analysis of Management Reserve Budget on Defense Acquisition Contracts. Cedar City: Southern Utah University, 2000.
research reportNot linked to a paper · References
Garvey, Paul R. Cost Risk Analysis without Statistics!! McLean, Va.: MITRE, February, 2005.
research reportNot linked to a paper · References
Higdon, Greg, Lew Fichter, and Alfred Smith. Cost Uncertainty Analysis: Observations from the Field. Santa Barbara, Calif.: Tecolote Research, April 2008.
research reportNot linked to a paper · References
Hulett, David T. Integrated Cost and Schedule Risk Analysis. Washington, D.C.: Hulett and Associates, 2007.
research reportNot linked to a paper · References
Lavdas, Evaggelos. Identifying the Characteristics of a Good Cost Estimate: A Survey. Cranfield, Bedfordshire, Eng.: Cranfield University, June 2006.
research reportNot linked to a paper · References
Lipke, Walter H. Independent Estimate at Completion: Another Method. Tinker Air Force Base, Okla.: October 2004.
research reportNot linked to a paper · References
Lorell, Mark A., Julia F. Lowell, and Obaid Younossi. Evolutionary Acquisition Implementation Challenges for Defense Space Programs. Arlington, Va.: RAND, 2006.
research reportNot linked to a paper · References
RAND. Impossible Certainty: Cost Risk Analysis for Air Force Systems. Arlington, Va.: 2006.
research reportNot linked to a paper · References
Kahneman, Daniel, and Dan Lovallo. Delusions of Success: How Optimism Undermines Executives' Decisions. Harvard Business Review, July 2003.
journal articleNot linked to a paper · References
Wideman, Max R. A Pragmatic Approach to Using Resource Loading, Production, and Learning Curves on Construction Projects. Canadian Journal of Civil Engineering 21 (1994): 939–53.
Druker, Eric, Christina Kanick, and Richard Coleman. The Challenges of (and Solutions for) Estimating Percentiles of Cost. Arlington, Va.: Northrop Grumman, Aug. 11, 2008.
research reportNot linked to a paper · References
GAO. 21st Century Challenges: Reexamining the Base of the Federal Government, GAO-05-325SP. Washington, D.C.: February 2005.
government reportNot linked to a paper · References
GAO. Air Traffic Control: FAA Uses Earned Value Techniques to Help Manage Information Technology Acquisitions, but Needs to Clarify Policy and Strengthen Oversight, GAO-08-756. Washington, D.C.: July 18, 2008.
government reportNot linked to a paper · References
GAO. Defense Acquisitions: Assessments of Selected Major Weapon Programs, GAO-06-391. Washington, D.C.: Mar. 31, 2006.
government reportNot linked to a paper · References
GAO. Defense Acquisitions: Improved Management Practices Could Help Minimize Cost Growth in Navy Shipbuilding Programs, GAO-05-183. Washington, D.C.: Feb. 28, 2005.
government reportNot linked to a paper · References
GAO. Defense Acquisition: A Knowledge-Based Funding Approach Could Improve Weapon System Program Outcomes, GAO-08-619. Washington, D.C.: June 2008.
government reportNot linked to a paper · References
GAO. Space Acquisitions: DOD Needs to Take More Action to Address Unrealistic Initial Cost Estimates of Space Systems, GAO-07-96. Washington, D.C.: Nov. 17, 2006.
government reportNot linked to a paper · References
GAO. Uncertainties Remain Concerning the Airborne Laser's Cost and Military Utility, GAO-04-643R. Washington, D.C.: May 17, 2004.
government reportNot linked to a paper · References
GAO. Cooperative Threat Reduction: DOD Needs More Reliable Data to Better Estimate the Cost and Schedule of the Shchuch'ye Facility, GAO-06-692. Washington, D.C.: May 31, 2006.
government reportNot linked to a paper · References
Comptroller General of the United States, Theory and Practice of Cost Estimating for Major Acquisitions, B-163058 (Washington, D.C.: July 24, 1972), p. 1.
government reportNot linked to a paper · Chapter 1
GAO, NASA: Lack of Disciplined Cost-Estimating Processes Hinders Effective Program Management, GAO-04-642 (Washington, D.C.: May 28, 2004).
government reportNot linked to a paper · Case Study 1
GAO, Customs Service Modernization: Serious Management and Technical Weaknesses Must Be Corrected, GAO/AIMD-99-41 (Washington, D.C.: Feb. 26, 1999).
government reportNot linked to a paper · Case Study 2
GAO, Space Acquisitions: DOD Needs to Take More Action to Address Unrealistic Initial Cost Estimates of Space Systems, GAO-07-96 (Washington, D.C.: Nov. 17, 2006).
government reportNot linked to a paper · Case Study 6
GAO, Combating Nuclear Smuggling: DHS Has Made Progress Deploying Radiation Detection Equipment at U.S. Ports-of-Entry, but Concerns Remain, GAO-06-389 (Washington, D.C.: Mar. 22, 2006).
government reportNot linked to a paper · Case Study 7
GAO, Defense Acquisitions: Improved Management Practices Could Help Minimize Cost Growth in Navy Shipbuilding Programs, GAO-05-183 (Washington, D.C.: Feb. 28, 2005).
government reportNot linked to a paper · Case Study 8
GAO, Defense Acquisitions: Missile Defense Agency Fields Initial Capability but Falls Short of Original Goals, GAO-06-327 (Washington, D.C.: Mar. 15, 2006).
government reportNot linked to a paper · Case Study 9
GAO, Cooperative Threat Reduction: DOD Needs More Reliable Data to Better Estimate the Cost and Schedule of the Shchuch'ye Facility, GAO-06-692 (Washington, D.C.; May 31, 2006).
government reportNot linked to a paper · Case Study 12
GAO, Combating Nuclear Smuggling: DHS's Cost-Benefit Analysis to Support the Purchase of New Radiation Detection Portal Monitors Was Not Based on Available Performance Data and Did Not Fully Evaluate All the Monitors' Costs and Benefits, GAO-07-133R (Washington, D.C.: Oct. 17, 2006).
government reportNot linked to a paper · Case Study 15
GAO, Best Practices: Better Acquisition Outcomes Are Possible If DOD Can Apply Lessons from F/A-22 Program, GAO-03-645T (Washington, D.C.: Apr. 11, 2003), pp. 2–3.
government reportNot linked to a paper · Chapter 4
GAO, DOD Systems Modernization: Planned Investment in the Naval Tactical Command Support System Needs to Be Reassessed, GAO-06-215 (Washington, D.C.: Dec. 5, 2005).
government reportNot linked to a paper · Chapter 5
GAO, Best Practices: Successful Application to Weapon Acquisitions Requires Changes in DOD's Environment, GAO/NSIAD-98-56 (Washington, D.C.: Feb. 24, 1998), pp. 8 and 62.
government reportNot linked to a paper · Introduction
GAO, 21st Century Challenges: Reexamining the Base of the Federal Government, GAO-05-325SP (Washington, D.C.: February 2005), p. 1.
government reportNot linked to a paper · Preface
Daniel D. Galorath, Software Projects on Time and within Budget—Galorath: The Power of Parametrics, PowerPoint presentation, El Segundo, California, n.d., p. 3. http://www.galorath.com/wp/software-project-failure-costs-billions-better-estimation-planning-can-help.php.
otherNot linked to a paper · fn 43 · cited link
Jim Johnson and others, “Collaboration: Development and Management—Collaborating on Project Success,” Software Magazine, Sponsored Supplement, February–March 2001, p. 2.
journal articleNot linked to a paper · fn 44
Pat Phelan, Estimating the Time and Cost of ERP Implementation Projects Is a 10-Step Process (Stamford, Conn.: Gartner Inc., Apr. 10, 2006), p. 3.
research reportNot linked to a paper · fn 46
Derek Slater, “The Hidden Costs of Enterprise Software,” CIO Enterprise Magazine, Jan. 15, 1998.
journal articleNot linked to a paper · Table 18 source note
R. Max Wideman, FCSCE, “A Pragmatic Approach to Using Resource Loading, Production and Learning Curves on Construction Projects.”
otherNot linked to a paper · Figure 13 source
Stephen A. Book, “Do Not Sum ‘Most Likely’ Costs,” presentation to American Society of Military Comptrollers, Los Angeles, California, April 30, 2002.
otherNot linked to a paper · Chapter 14 fn 51
Air Force Cost Analysis Agency’s Cost Risk and Uncertainty Analysis Handbook (Goleta, Calif.: Tecolote Research, Inc., April 2007).
research reportNot linked to a paper · Chapter 14 fn 50
Paul Garvey, Probability Methods for Cost Uncertainty Analysis
bookNot linked to a paper · Chapter 14 fn 53
© 2003, Society of Cost Estimating and Analysis, "Earned Value Management Systems (EVMS) Tracking Cost and Schedule Performance on Projects," p. 7.
otherNot linked to a paper · fn 75
DOD, The Program Manager's Guide to the Integrated Baseline Review Process (Washington, D.C.: Office of the Secretary of Defense (AT&L), April 2003).
government reportNot linked to a paper · Chapter 19, fn 76
David S. Christensen, Determining an Accurate Estimate at Completion (Cedar City: Southern Utah University, 1993), p. 7.
otherNot linked to a paper · Chapter 19, fn 78
GAO, National Airspace System: Better Cost Data Could Improve FAA's Management of the Standard Terminal Automation Replacement System, GAO-03-343 (Jan. 31, 2003).
government reportNot linked to a paper · Case Study 47, Chapter 20
GAO, Uncertainties Remain Concerning the Airborne Laser's Cost and Military Utility, GAO-04-643R (Washington, D.C.: Mar. 17, 2004).
government reportNot linked to a paper · Case Study 48, Chapter 20
Ivan Bembers and others, Over Target Baseline and Over Schedule Handbook (n.p., n.p.: May 7, 2003).
otherNot linked to a paper · Chapter 20, Table 45
NDIA, National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC) Surveillance Guide (Arlington, Va.: October 2004).
government reportNot linked to a paper · Chapter 20, fn 79
National Airspace System: Better Cost Data Could Improve FAA's Management of the Standard Terminal Automation Replacement System (Jan. 31, 2003)
government reportNot linked to a paper · Case Study 47
Next →