GAO Cost Estimating and Assessment Guide: Best Practices for Developing and Managing Capital Program Costs (Supersedes GAO-07-1134SP)
Original sourceWeb page (79 KB)PDF (4.5 MB)
References: 72 extracted, 2 linked to papers
Uncertainties Remain Concerning the Airborne Laser's Cost and Military Utility, (May 17, 2004)
Telecommunications: GSA Has Accumulated Adequate Funding for Transition to New Contracts but Needs Cost Estimation Policy, GAO-07-268, February 23, 2007
Chemical Demilitarization: Actions Needed to Improve the Reliability of the Army's Cost Comparison Analysis for Treatment and Disposal Options for Newport's VX Hydrolysate, January 26, 2007
Wright, T. P., "Factors Affecting the Cost of Airplanes," Journal of Aeronautical Science 3:4 (1936): 122–28
DOD, Department of Defense Handbook: Work Breakdown Structures for Defense Materiel Items, MIL-HDBK-881A (Washington, D.C.: OUSD (AT&L), July 3, 2005)
Project Management Institute, Practice Standards for Work Breakdown Structures (2006)
Department of Energy, Work Breakdown Structures for Defense Materiel Items (Washington, D.C.: June 2003)
General Services Administration, Project Estimating Requirement (Washington, D.C.: January 2007)
OMB, Capital Programming Guide: Supplement to Circular A-11, Part 7 (Washington, D.C.: Executive Office of the President, June 2006)
DCMA, Department of Defense Earned Value Management Implementation Guide (2006)
NDIA PMSC EVM Systems Intent Guide (2005)
NDIA PMSC Surveillance Guide (2004)
GAO, Chemical Demilitarization: Actions Needed to Improve the Reliability of the Army's Cost Comparison Analysis for Treatment and Disposal Options for Newport's VX Hydrolysate, GAO-07-240R (Washington, D.C.: Jan. 6, 2007).
GAO, Telecommunications: GSA Has Accumulated Adequate Funding for Transition to New Contracts but Needs Cost Estimation Policy, GAO-07-268 (Washington, D.C.: Feb. 23, 2007).
GAO, Cooperative Threat Reduction: DOD Needs More Reliable Data to Better Estimate the Cost and Schedule of the Shchuch'ye Facility, GAO-06-692 (Washington, D.C.: May 31, 2006).
GAO, United States Coast Guard: Improvements Needed in Management and Oversight of Rescue System Acquisition, GAO-06-623 (Washington, D.C.: May 31, 2006).
GAO, Air Traffic Control: FAA Uses Earned Value Techniques to Help Manage Information Technology Acquisitions, but Needs to Clarify Policy and Strengthen Oversight, GAO-08-756 (Washington, D.C.: July 18, 2008).
Gregory T. Haugan, Work Breakdown Structures for Projects, Programs, and Enterprises (Vienna, Va.: Management Concepts, 2008), p. 38.
GAO, Homeland Security: Recommendations to Improve Management of Key Border Security Program Need to Be Implemented, GAO-06-296 (Washington, D.C.: Feb. 14, 2006).
Ronald C. Wilson, Department of Defense Automated Information Systems Economic Analysis Guide (Washington, D.C.: Department of Defense, May 1, 1995).
DOD, Department of Defense Handbook: Work Breakdown Structures for Defense Material Items, MIL-HDBK-881A (Washington, D.C.: July 30, 2005).
International Society of Parametric Analysts, Parametric Estimating Handbook, 4th ed. (Vienna, Va.: ISPA/SCEA Joint Office, 2008).