Chapter 14: Dam Safety Performance Monitoring Program” from Engineering Guidelines for the Evaluation of Hydropower Projects
Other documents for the same rulemaking (all, by stage)
References
USGS Quad map or other location map with project facilities located including conveyance system alignment Plan of licensed project facilities and project boundaries Typical sections and profiles of key project works (dams, spillways, powerhouses, intakes, canals, tunnels, penstocks, flumes, surge chambers, inverted siphons, etc.) Satellite or aerial photo of project and downstream area if available Revision 1 14-I-2 July 1, 2005 Chapter 14 Monitoring the Performance of Dams
BASIC DATA AND ANALYSES maximum reservoir water surface Elevation 4,644, leaving 6.0 feet of freeboard. Spillway Adequacy A. Previous Studies The original design flood study for Big Hole Dam was presented in "A Study of the Maximum Probable Floods for the Middle Fork of the Big River Project", dated October 1961 and revised in August 1962 by ABC. The design flood developed by that flood study, when routed through the reservoir and spillway, resulted in a peak discharge of 58,800 cfs at reservoir water surface Elevation 4,643.2, leaving a freeboard of 6.8 feet to the nominal dam crest. B. Methodology to Determine PMF In 1982, FERC directed Big County Water Agency to provide additional information on flood hydrology for the Middle Fork American River Project. The Agency retained Hydrotech of Bigville to perform that study. Hydrotech's report "Probable Maximum Flood Study for Big
Cooley, J. W., and Tukey, J. W., 1965, “An Algorithm for the Machine Calculation of Complex Fourier Series,” Mathematics of Computation, Vol. 19, No. 90, pp. 297-301.
Harlan Miller Tait Associates, 1984, Stability Investigation, Big Hole Dam.
Harlan Miller Tait Associates, 1986, FiveYear Dam Safety Inspection Report, Big Hole Dam.
Harlan Tait Associates, 1991, Five-Year Dam Safety Inspection Report, Big Hole Dam. McCreary Koretsky Engineers, 1962, “Big Hole Dam Engineering Data,” dated
March, 1962. McCreary Koretsky Engineers, 1968, “Placer County Water Agency, Middle Fork American River Project, Big Hole
Dam, Sections and Details,” dated January, 1968. 14-I-16 July 1, 2005 Chapter 14 Monitoring the Performance of Dams
Sadigh, K.;Chang; Egan; Makdisi; Youngs (Geomatrix) Attenuation Relationships for Shallow Crustal Earthquakes Based on California Strong Motion Data. Seismological Research Letters, Volume 68, Number 1; January/February 1997, Seismological Society of America Revision 1 14-I-17 July 1, 2005 Chapter 14 Monitoring the Performance of Dams Case Slope/Condition Min. Criteria F.S. Min. Computed F.S. Downstream - Pool Elev. 4640, 10 1.47 feet above Normal Maximum Operating level Downstream/PMF 1.47 Pool Elev. 4646 Downstream - Pool Elev. 4640 with N. A. Displacement 0.01 ft. Seismic Yield Accel. 0.22 Upstream - Pool Elev. 4640 2.33 Upstream - PMF 2.34 Pool Elev. 4646 Upstream Pool Elev. 4640 with N.A. Max. Displacement 0.01 ft.Seismic Minimum Yield Accel. 0.30 Upstream: Pool Elev. 4340 1.98 Pool Elev. 4465 1.88 Pool Elev. 4565 2.10 Upstream w/ Seismic: Pool El. 4340 N. A. Min. Yield Accel's.0.34 Pool Elev. 4465 0.25