{"document":{"doc_id":285602,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Chapter 14: Dam Safety Performance Monitoring Program” from Engineering Guidelines for the Evaluation of Hydropower Projects","date":"2014-10-21","url":"https://www.regulations.gov/document/EPA-HQ-OW-2011-0880-8292","source_native_id":"EPA-HQ-OW-2011-0880-8292","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OW-2011-0880"],"rins":["RIN 2040-AF30"],"related":[{"doc_id":11661,"source":"fr_rule","org":"DEPARTMENT OF DEFENSE; Department of the Army, Corps of Engineers; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Definition of “Waters of the United States” Under the Clean Water Act","date":"2014-04-21"},{"doc_id":52579,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Economic Analysis of Proposed Revised Definition of Waters of the United States","date":"2014-04-21"},{"doc_id":131211,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Documentation of Changes Made During OMB Review Under E.O. 12866 CWA WUS2040-AF30 NPRM FRN","date":"2014-04-21"},{"doc_id":131212,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to initiate E.O. 12866 review \"Definition of 'Waters of the United States' Under the Clean Water Act\" NPRM FRN","date":"2014-04-21"},{"doc_id":248456,"source":"docket_item","org":"EPA","doc_type":"report","title":"Post-Meeting Comments for First Peer Review of EPA’s Draft Report: Connectivity of Streams and Wetlands to Downstream Waters - A Review and Synthesis of the Scientific Evidence (independent external peer review report)","date":"2014-04-21"},{"doc_id":286904,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Connectivity of Streams and Wetlands to Downstream Waters: A Review and Synthesis of the Scientific Evidence (September, 2013 External Review Draft, EPA/600/R-11/098B)","date":"2014-04-21"},{"doc_id":248191,"source":"docket_item","org":"EPA","doc_type":"report","title":"Final Summary of the Discretionary Small Entity Outreachfor EPA’s Planned Proposed Revised Definition of Waters of the United States","date":"2014-06-10"},{"doc_id":11519,"source":"fr_rule","org":"DEPARTMENT OF DEFENSE; Department of the Army, Corps of Engineers; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule (administrative)","title":"Definition of “Waters of the United States” Under the Clean Water Act; Extension of Comment Period","date":"2014-06-24"},{"doc_id":11246,"source":"fr_rule","org":"DEPARTMENT OF DEFENSE; Department of the Army, Corps of Engineers; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule (administrative)","title":"Extension of Comment Period for the Definition of “Waters of the United States” Under the Clean Water Act Proposed Rule and Notice of Availability","date":"2014-10-14"},{"doc_id":246481,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Integrated Assessment of Hypoxia in the Northern Gulf of Mexico","date":"2014-10-21"},{"doc_id":246482,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Flux and Sources of Nutrients in theMississippi–Atchafalaya River Basin, Topic 3 Report for the Integrated Assessmenton Hypoxia in the Gulf of Mexico","date":"2014-10-21"},{"doc_id":246485,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Seepage Analysis and Control for Dams (EM 1110-2-1901)","date":"2014-10-21"},{"doc_id":285588,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Design and Construction of Levees (EM 1110-2-1913)","date":"2014-10-21"},{"doc_id":285589,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Handbook for Developing Watershed Plans to Restore and Protect Our Waters","date":"2014-10-21"},{"doc_id":285590,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Why Watersheds? (EPA 800-F-96-001)","date":"2014-10-21"},{"doc_id":285591,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Setting and Allocating the Chesapeake Bay Basin Nutrient and Sediment Loads: The Collaborative Process, Technical Tools and Innovative Approaches","date":"2014-10-21"},{"doc_id":285592,"source":"docket_item","org":"EPA","doc_type":"publication","title":"A Regional Guidebook for Applying the Hydrogeomorphic Approach to Assessing Wetland Functions of Selected Regional Wetland Subclasses, Yazoo Basin, Lower Mississippi River Alluvial Valley","date":"2014-10-21"},{"doc_id":285594,"source":"docket_item","org":"EPA","doc_type":"publication","title":"The Ecological and Hydrological Significance of Ephemeral and Intermittent Streams in the Arid and Semi-arid American Southwest","date":"2014-10-21"},{"doc_id":285595,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Fiscal Year 2011-2015 Strategic Plan: Achieving Our Vision","date":"2014-10-21"},{"doc_id":285597,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Stream Corridor Restoration: Principles, Processes, and Practices","date":"2014-10-21"},{"doc_id":285599,"source":"docket_item","org":"EPA","doc_type":"publication","title":"General Design and Construction Considerations for Earth and Rock-Fill Dams","date":"2014-10-21"},{"doc_id":285604,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Design Guidance for Levee Underseepage (ETL 1110-2-569)","date":"2014-10-21"},{"doc_id":285607,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Construction Control for Earth and Rock-Fill Dams (EM 1110-2-1911)","date":"2014-10-21"},{"doc_id":246445,"source":"docket_item","org":"EPA","doc_type":"report","title":"Spokane River and Lake Spokane Dissolved Oxygen Total Maximum Daily Load: Water Quality Improvement Report","date":"2014-10-22"},{"doc_id":285529,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Borne of the Wind: An Introduction to the Ecology of Michigan Sand Dunes","date":"2014-10-22"},{"doc_id":285566,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Between Land and Lake: Michigan’s Great Lakes Coastal Wetlands","date":"2014-10-22"},{"doc_id":246424,"source":"docket_item","org":"EPA","doc_type":"data","title":"Nonpoint Source Impacts on Primary Headwater Streams","date":"2014-10-23"},{"doc_id":11225,"source":"fr_rule","org":"DEPARTMENT OF DEFENSE; Department of the Army, Corps of Engineers; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Definition of “Waters of the United States” Under the Clean Water Act Proposed Rule; Notice of Availability","date":"2014-10-24"},{"doc_id":246409,"source":"docket_item","org":"EPA","doc_type":"report","title":"Additional Supporting Materials for Docket EPA-HQ-OW-2011-0880","date":"2014-10-24"},{"doc_id":246412,"source":"docket_item","org":"EPA","doc_type":"report","title":"Phosphorus Control Action Plan and Total Maximum Daily (Annual Phosphorous) Load Report, Daigle Pond, New Canada, Aroostook County, Maine, Daigle Pond PCAP – TMDL Report, Maine DEPLW – 0789","date":"2014-10-24"},{"doc_id":246415,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Effects of Nonnative Fishes on Wilderness Lake Ecosystems in the Sierra Nevada and Recommendations for Reducing Impacts","date":"2014-10-24"},{"doc_id":246293,"source":"docket_item","org":"EPA","doc_type":"report","title":"Section 6 Echo Park Lake TMDLs, Los Angeles Area Lakes TMDLs, January 2011 Revised Draft","date":"2014-11-04"},{"doc_id":246313,"source":"docket_item","org":"EPA","doc_type":"report","title":"Perspectives on temperature in the Pacific Northwest’s fresh waters","date":"2014-11-04"},{"doc_id":285296,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Characterizing mercury concentrations and fluxes in a Coastal Plain watershed: Insights from dynamic modeling and data","date":"2014-11-04"},{"doc_id":285329,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Avian ecology of Great Salt Lake","date":"2014-11-04"},{"doc_id":285342,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Status of Alaska Wetlands","date":"2014-11-04"},{"doc_id":285343,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Status and trends of prairie wetlands in the United States 1997 to 2009","date":"2014-11-04"},{"doc_id":285362,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Hydrology for- Urban Land Planning - A Guidebook on the Hydrologic Effects of Urban Land Use","date":"2014-11-04"},{"doc_id":246275,"source":"docket_item","org":"EPA","doc_type":"report","title":"Local Government Advisory Committee Report: Initial Findings and Recommendations Pertaining to EPA's Clean Water Act Waters of the U.S. Proposed Rule","date":"2014-11-06"},{"doc_id":246282,"source":"docket_item","org":"EPA","doc_type":"report","title":"Management Plan of the Pacific and Central Flyways for the Rocky Mountain Population of Greater Sandhill Cranes","date":"2014-11-06"},{"doc_id":283917,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Connectivity of Streams and Wetlands to Downstream Waters: A Review and Synthesis of the Scientific Evidence","date":"2015-05-20"},{"doc_id":283915,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Connectivity of Streams and Wetlands to Downstream Waters: A Review and Synthesis of the Scientific Evidence","date":"2015-06-04"},{"doc_id":10677,"source":"fr_rule","org":"DEPARTMENT OF DEFENSE; Department of the Army, Corps of Engineers; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Clean Water Rule: Definition of “Waters of the United States”","date":"2015-06-29"},{"doc_id":52565,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Economic Analysis of the EPA-Army Clean Water Rule","date":"2015-06-29"},{"doc_id":52610,"source":"ria","org":"EPA","doc_type":"ria_oira_review_version","title":"E.O. 12866 Review Version of Clean Water Rule: Definition of \"Waters of the United States\" and Economic Analysis","date":"2015-06-29"},{"doc_id":242314,"source":"docket_item","org":"EPA","doc_type":"report","title":"Final Report of the Discretionary Small Entity Outreach for the Clean Water Rule: Definition of “Waters of the United States;” Final Rule","date":"2015-06-29"},{"doc_id":242324,"source":"docket_item","org":"EPA","doc_type":"other","title":"Environmental Assessment: Finding of No Significant Impact for the Clean Water Rule","date":"2015-06-29"},{"doc_id":242331,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for the Clean Water Rule","date":"2015-06-29"},{"doc_id":242334,"source":"docket_item","org":"EPA","doc_type":"report","title":"Clean Water Rule Environmental Justice Report","date":"2015-06-29"},{"doc_id":242338,"source":"docket_item","org":"EPA","doc_type":"report","title":"Clean Water Rule Federalism Report","date":"2015-06-29"},{"doc_id":239996,"source":"docket_item","org":"EPA","doc_type":"report","title":"Persons and Organizations Requesting Clarification of Waters of the United States by Rulemaking","date":"2015-11-24"},{"doc_id":239993,"source":"docket_item","org":"EPA","doc_type":"data","title":"Multiflume runoff event August 1, 1990 (video)","date":"2015-11-25"},{"doc_id":52594,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Supporting Documentation (Analysis of Jurisdictional Determinations for Economic Analysis and Rule)","date":"2015-11-30"},{"doc_id":235398,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Technical Analysis of Draft Final Rule on Definition of 'Waters of the United States' (redacted) and Appendix A, Apr. 24, 2015","date":"2016-10-14"}],"references":[{"citation_id":3742951,"raw_reference":"USGS Quad map or other location map with project facilities located including conveyance system alignment Plan of licensed project facilities and project boundaries Typical sections and profiles of key project works (dams, spillways, powerhouses, intakes, canals, tunnels, penstocks, flumes, surge chambers, inverted siphons, etc.) Satellite or aerial photo of project and downstream area if available Revision 1 14-I-2 July 1, 2005 Chapter 14 Monitoring the Performance of Dams","cited_authors":null,"cited_year":null,"cited_title":"USGS Quad map or other location map with project facilities located including conveyance system alignment Plan of licensed project facilities and project boundaries Typical sections and profiles of key project works (dams, spillways, powerhouses, intakes, canals, tunnels, penstocks, flumes, surge chambers, inverted siphons, etc.) Satellite or aerial photo of project and downstream area if available Revision 1 14-I-2 July 1, 2005 Chapter 14 Monitoring the Performance of Dams","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":3742952,"raw_reference":"BASIC DATA AND ANALYSES maximum reservoir water surface Elevation 4,644, leaving 6.0 feet of freeboard. Spillway Adequacy A. Previous Studies The original design flood study for Big Hole Dam was presented in \"A Study of the Maximum Probable Floods for the Middle Fork of the Big River Project\", dated October 1961 and revised in August 1962 by ABC. The design flood developed by that flood study, when routed through the reservoir and spillway, resulted in a peak discharge of 58,800 cfs at reservoir water surface Elevation 4,643.2, leaving a freeboard of 6.8 feet to the nominal dam crest. B. Methodology to Determine PMF In 1982, FERC directed Big County Water Agency to provide additional information on flood hydrology for the Middle Fork American River Project. The Agency retained Hydrotech of Bigville to perform that study. Hydrotech's report \"Probable Maximum Flood Study for Big","cited_authors":"BASIC DATA AND ANALYSES maximum reservoir water surface Elevation 4,644, leaving 6.0 feet of freeboard. Spillway Adequacy A. Previous Studies The original design flood study for Big Hole Dam was presented in \"A Study of the Maximum Probable Floods for the Middle Fork of the Big River Project\", dated October 1961 and revised in August 1962 by ABC. The design flood developed by that flood study, when routed through the reservoir and spillway, resulted in a peak discharge of 58,800 cfs at reservoir water surface Elevation 4,643.2, leaving a freeboard of 6.8 feet to the nominal dam crest. B. Methodology to Determine PMF In","cited_year":"1982","cited_title":"FERC directed Big County Water Agency to provide additional information on flood hydrology for the Middle Fork American River Project","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":3742953,"raw_reference":"Cooley, J. W., and Tukey, J. W., 1965, “An Algorithm for the Machine Calculation of Complex Fourier Series,” Mathematics of Computation, Vol. 19, No. 90, pp. 297-301.","cited_authors":"Cooley, J. W., and Tukey, J. W","cited_year":"1965","cited_title":"An Algorithm for the Machine Calculation of Complex Fourier Series","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":3742954,"raw_reference":"Harlan Miller Tait Associates, 1984, Stability Investigation, Big Hole Dam.","cited_authors":"Harlan Miller Tait Associates","cited_year":"1984","cited_title":"Stability Investigation, Big Hole Dam","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":3742955,"raw_reference":"Harlan Miller Tait Associates, 1986, FiveYear Dam Safety Inspection Report, Big Hole Dam.","cited_authors":"Harlan Miller Tait Associates","cited_year":"1986","cited_title":"FiveYear Dam Safety Inspection Report, Big Hole Dam","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":3742956,"raw_reference":"Harlan Tait Associates, 1991, Five-Year Dam Safety Inspection Report, Big Hole Dam. McCreary Koretsky Engineers, 1962, “Big Hole Dam Engineering Data,” dated","cited_authors":"Harlan Tait Associates","cited_year":"1991","cited_title":"Big Hole Dam Engineering Data","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":3742957,"raw_reference":"March, 1962. McCreary Koretsky Engineers, 1968, “Placer County Water Agency, Middle Fork American River Project, Big Hole","cited_authors":"March","cited_year":"1962","cited_title":"McCreary Koretsky Engineers, 1968, “Placer County Water Agency, Middle Fork American River Project, Big Hole","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":3742958,"raw_reference":"Dam, Sections and Details,” dated January, 1968. 14-I-16 July 1, 2005 Chapter 14 Monitoring the Performance of Dams","cited_authors":"Dam, Sections and Details,” dated January","cited_year":"1968","cited_title":"14-I-16 July 1, 2005 Chapter 14 Monitoring the Performance of Dams","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":3742959,"raw_reference":"Sadigh, K.;Chang; Egan; Makdisi; Youngs (Geomatrix) Attenuation Relationships for Shallow Crustal Earthquakes Based on California Strong Motion Data. Seismological Research Letters, Volume 68, Number 1; January/February 1997, Seismological Society of America Revision 1 14-I-17 July 1, 2005 Chapter 14 Monitoring the Performance of Dams Case Slope/Condition Min. Criteria F.S. Min. Computed F.S. Downstream - Pool Elev. 4640, 10 1.47 feet above Normal Maximum Operating level Downstream/PMF 1.47 Pool Elev. 4646 Downstream - Pool Elev. 4640 with N. A. Displacement 0.01 ft. Seismic Yield Accel. 0.22 Upstream - Pool Elev. 4640 2.33 Upstream - PMF 2.34 Pool Elev. 4646 Upstream Pool Elev. 4640 with N.A. Max. Displacement 0.01 ft.Seismic Minimum Yield Accel. 0.30 Upstream: Pool Elev. 4340 1.98 Pool Elev. 4465 1.88 Pool Elev. 4565 2.10 Upstream w/ Seismic: Pool El. 4340 N. A. Min. Yield Accel's.0.34 Pool Elev. 4465 0.25","cited_authors":"Sadigh, K.;Chang; Egan; Makdisi; Youngs (Geomatrix) Attenuation Relationships for Shallow Crustal Earthquakes Based on California Strong Motion Data. Seismological Research Letters, Volume 68, Number 1; January/February","cited_year":"1997","cited_title":"Seismological Society of America Revision 1 14-I-17 July 1, 2005 Chapter 14 Monitoring the Performance of Dams Case Slope/Condition Min","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}