References
Williams, Austin. 2011. The Impact of Surface Coal Mining on Residential Property Values: a Hedonic Price Analysis. University of Tennessee, Knoxville May (2011):1–25. Willingham Associates, Inc. 2002. Impact Study: Quarry Operation's Effects on Real Estate Values. Willingham Associates, Inc. for Paul D. Rice, Attorney at Law December (2002):1–24.
Lancaster County. 2013a. Ordinance No. 2013-1207. Lancaster County, South Carolina, Code of
Also, because the Applicant’s Proposed Project would close three open Lancaster County roads (Snowy Owl Road, Gene Lewellen Road, and Bumblebee Road [also known as Gary Road]) and one SCDOTmaintained road (Haile Gold Mine Road), some existing traffic would be diverted from their current Final EIS 4.12-2 July 2014
SCDOT. See South Carolina Department of Transportation. South Carolina Department of Transportation. 2011a. South Carolina Overweight Truck Routes Map. Website: http://www.dot.state.sc.us/doing/doingPDFs/permits/TruckRouteMap_11x17.pdf. Accessed on July 30, 2013. South Carolina Department of Transportation. 2011b. Access and Roadside Management Standards. Final EIS 4.12-10 July 2014 Chapter 4 Section 4.12 Transportation Haile Gold Mine EIS South Carolina Department of Transportation. 2012a. SCDOT Highway Preservation. Website: http://www.scdot.org/doing/Pavement_Preservation/preservation.aspx. Accessed on November 28, 2012. South Carolina Department of Transportation. 2012b. Mr. Todd Cook (District Maintenance, SCDOT Engineering District 4). Personal communication with Scott Barker (Cardno TEC) regarding highway maintenance procedures and the status of US 601 maintenance. December 5, 2012. South Carolina Department of Transportation. 2013a. Letter to Campco Engineering, Inc., regarding the Haile Gold Mine Traffic Impact Analysis. July 1. South Carolina Department of Transportation. 2013b. State Funding for Highways. Website: http://www.scdot.org/inside/highwaypolicy/statefunding.aspx. Accessed on July 30, 2013.
NRHP. “No effect” means that an undertaking would have no effect at all on a particular historic property. An “adverse effect” occurs when an undertaking alters the character-defining features of a particular historic property in such a way that would diminish the eligibility of the property for listing in the NRHP. “No adverse effect” applies when an undertaking would have an effect but not such that it would alter the characteristics that make a particular historic property eligible for listing in the NRHP. Appendix C of 33 CFR Part 325 also states that effects that would otherwise be found to be adverse may be considered not adverse when the historic property is of value only for its potential contribution to archaeological, historical, or architectural research; when such value can be substantially preserved through conducting appropriate research; and when such research is conducted in accordance with applicable professional standards and guidelines. 4.13.2 Impacts 4.13.2.1 Impacts on Historic Properties Historic properties would be affected during mining and during reclamation and monitoring activities, as described below. Appendix M1 provides additional information and tables related to historic properties. Final EIS 4.13-1 July 2014 Chapter 4 Section 4.13 Cultural Resources Haile Gold Mine EIS No Action Alternative
Genesis Consulting Group. 2011. Environmental Assessment for Haile Gold Mine Project. Haile. See Haile Gold Mine, Inc. Haile Gold Mine, Inc. 2012. Response of Haile Gold Mine, Inc. to USACE’s March 20, 2012 Request for Additional Information (RAI No. 2 – LV-01 to LV-09). May 11. Haile Gold Mine, Inc. 2013. Haile Gold Mine Monitoring and Management Plan. November. Final EIS 4.14-18 July 2014 Chapter 4 Section 4.14 Visual Resources and Aesthetics Haile Gold Mine EIS Haile Gold Mine, Inc. 2014. Haile Gold Mine, Inc. Comments on the Draft EIS. May 9, 2014.
IDA. See International Dark Sky Association. International Dark-Sky Association. 2013. Lighting Ordinances. Available online at: http://www.darksky.org/outdoorlighting/lighting-ordinances. Accessed on September 13, 2013.
Lancaster County. 2012. Code of Ordinances, Unified Development Ordinance. Part I, Appendix B, Chapter 4, Conditional and Special Exceptional Uses, Section 4.1.16, Manufacturing/Processing
Uses, 9. Exterior illumination. Website: http://library.municode.com/HTML/11128/level3/PTITHCO_APXBUNDEOR_CH4COSPEXUS.ht ml#PTITHCO_APXBUNDEOR_CH4COSPEXUS_S4.1.29MIEXOP. Accessed on May 1, 2013.
Lancaster County. 2013. Lancaster County, South Carolina, Code of Ordinances. Appendix B Unified Development Ordinance. Website: http://library.municode.com/index.aspx?clientId=11128. Accessed on September 11, 2013.
Lithonia Lighting. 2013. Cutoff Lighting Classifications. Available online at: http://www.lithonia.com/micro_webs/nighttimefriendly/cutoff.asp. Accessed on September 13, 2013.
Tetra Tech. 2011. Preliminary Air Impact Analysis. Prepared for Johnny Pappas, Haile Gold Mine Inc. May 16, 2011. Final EIS 4.14-19 July 2014 Chapter 4 Section 4.14 Visual Resources and Aesthetics Haile Gold Mine EIS This page is left blank intentionally. Final EIS 4.14-20 July 2014 Chapter 4 Section 4.15 Recreation Resources Haile Gold Mine EIS 4.15 Recreation Resources The recreation resources impact analysis focuses on potential effects on publicly accessible recreation facilities and lands in the Project area and within approximately 15 miles of the Project boundary. 4.15.1 Methods Project-related impacts on recreation resources generally were assessed qualitatively by considering the impacts caused by construction activities, mining operations, maintenance activities, and post-reclamation land use. The likely direct impacts on recreational use and access were considered, in addition to the potential indirect changes in the existing recreational setting and experience. To specifically address the potential visibility of the proposed Project from the Forty Acre Rock Heritage
Carolina Thread Trail. 2011. Carolina Thread Trail Master Plan for Lancaster County Communities. Website: http://www.carolinathreadtrail.org/wp-content/uploads/2010/12/Lancaster-County-CTTFINAL1.pdf. Accessed on October 30, 2012. Haile. See Haile Gold Mine, Inc. Final EIS 4.15-4 July 2014 Chapter 4 Section 4.15 Recreation Resources Haile Gold Mine EIS Haile Gold Mine, Inc. 2013. Haile Avoidance and Minimization Efforts. December 19.
Project, which is considered a minor source (based on the Project’s potential to emit). However, the Final EIS 4.16-1 July 2014 Chapter 4 Section 4.16 Air Quality Haile Gold Mine EIS
Botz, M. and T. Mudder. 2000. Modeling of Natural Cyanide Attenuation in Tailings Impoundments. Originally published in Mineral and Metallurgical Processing, Vol. 17, No. 4. Pp. 228–233, November. Website: http://dana6.free.fr/4%20060713%20Modeling%20of%20Natural%20Cyanide%20Attenuation%20in %20Tailings%20Impoundme.pdf. Accessed on December 6, 2103.
CEQ. See Council on Environmental Quality. Council on Environmental Quality. 2010. Draft NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions. February 18. Website: http://www.whitehouse.gov/sites/default/files/microsites/ceq/20100218-nepa-consideration-effectsghg-draft-guidance.pdf. Accessed on February 24, 2014.
Environment Australia. 1998. Best Practice Environmental Management in Mining: Cyanide Management. Website: http://www.ret.gov.au/resources/Documents/LPSDP/BPEMCyanide.pdf. Accessed on December 9, 2013. Haile. See Haile Gold Mine, Inc. Haile Gold Mine, Inc. 2012a. Haile Gold Mine Air Quality Construction Permit Application, Prepared by Tetra Tech. August. Haile Gold Mine, Inc. 2012b. Air Quality Technical Memorandum for the Haile Gold Mine Project Environmental Impact Statement. Prepared by Tetra Tech. April. Haile Gold Mine, Inc. 2012c. Haile Gold Mine Air Quality Construction Permit Application: Table 5-4 Revised. Prepared by Tetra Tech. October. Haile Gold Mine, Inc. 2012d. Response of Haile Gold Mine, Inc. to SCDHEC’s questions raised in the review of the Air Quality Construction Permit Application. December 17.
Haile Gold Mine Inc. 2013a. Response of Haile Gold Mine, Inc. to SCDHEC’s questions on fugitive emissions from leaks and updated emissions from trailer-mounted lights. March 15. Final EIS 4.16-21 July 2014 Chapter 4 Section 4.16 Air Quality Haile Gold Mine, Inc. 2013b. Email from Johnny Pappas (Romarco Minerals, Inc. – Director of Environmental Affairs) to Paul Leonard (Cardno ENTRIX – Technical Director – Water Resources/Vice President) regarding updated CO and NOx emissions for blasting using water-based gel emulsion. October 28. Haile Gold Mine, Inc. 2013c. Response of Haile Gold Mine, Inc. to USACE’s March 27, 2013 Request for Additional Information RAI #4 Response to Comment AE-06. April. Haile Gold Mine, Inc. 2013d. Updated HAP/TAP Tier II analysis as follow-up response of Haile Gold Mine to SCDHEC BAQ’s December 17, 2012 question. July 1. Haile Gold Mine, Inc. 2013e. Haile Avoidance and Minimization Efforts. December 19. Haile Gold Mine, Inc. 2014. Haile Gold Mine, Inc. Comments on the Draft EIS. May 9.
SCSCO. See South Carolina State Climatology Office. South Carolina Department of Health and Environmental Control. Bureau of Air Quality. 2001a. Air Quality Modeling Guidelines. July 1. South Carolina Department of Health and Environmental Control. 2001b. Summary Report of Air Monitoring Activities for Particulate and Hydrogen Cyanide (HCN). Division of Air Quality Analysis. March 12. South Carolina Department of Health and Environmental Control. 2009. AERMOD Guidance. Bureau of Air Quality. Updated 2011. June 25. South Carolina Department of Health and Environmental Control. 2010. Updated Standards 2 and 7 Exemption and Deferral Guidelines. November. Website: http://www.scdhec.gov/environment/baq/docs/modeling/standard2and7modelingexemptionanddeferra lguidelines.pdf. Accessed on September 16, 2013. South Carolina Department of Health and Environmental Control. 2013a. Statement of Basis. Haile Gold Mine. October 4. South Carolina Department of Health and Environmental Control. 2013b. Air Dispersion Modeling Summary Sheet. Haile Gold Mine. August 23.
South Carolina State Climatology Office. 2013. Climate. Website: http://www.dnr.sc.gov/climate/sco/ClimateData/cli_sc_climate.php. Accessed on March 21, 2013. U.S. Environmental Protection Agency. 1990. New Source Review Workshop Manual. Prevention of Significant Deterioration and Nonattainment Area Permitting. Draft. Office of Air Quality Planning and Standards. Research Triangle Park, NC. October. U.S. Environmental Protection Agency. 2001. Draft Mercury Mass Balance and Emission Factor Estimates for Gold Ore Processing Facilities. Prepared for Region 9. January 14. U.S. Environmental Protection Agency. 2005. Guideline on Air Quality Models (Revised). Final EIS 4.16-22 July 2014 Chapter 4 Section 4.16 Air Quality U.S Environmental Protection Agency. 2009. Emissions & Generation Resource Integrated Database (eGrid). U.S Environmental Protection Agency. 2014. Fact Sheet for Final Rule: 2013 Revisions to the Greenhouse Gas Reporting Rule and Confidentiality Determinations for New or Substantially Revised Data Elements. Website: http://www.epa.gov/ghgreporting/documents/pdf/2013/documents/TC-AR4factsheet.pdf. Accessed on February 7, 2014.
ATS Consulting. 2013. Final Construction Noise and Vibration Report, SR 520, West Connection Bridge Project. Prepared for Washington State Department of Transportation. Website: http://www.wsdot.wa.gov/NR/rdonlyres/2EE44011-6783-4D44-B5B9566CD71049C7/0/SR520_FBL_WCB_NoiseVibrationRprt_FINAL.pdf. Accessed on October 15, 2013.
FTA. See U.S. Department of Transportation, Federal Transit Administration. Haile. See Haile Gold Mine, Inc. Haile Gold Mine, Inc. 2012a. Exhibit RAI 2-NO-01-a- Noise Impact Analysis, Haile Gold Mine,
Kershaw, North Carolina, Vibra-Tech Engineers, Inc., June 27. Haile Gold Mine, Inc. 2012b. Haile Gold Mine, Inc.’s Response to USACE’s March 20, 2012 Request for Additional Information RAI No. 2 (NO-01 to NO-03), June 28. Haile Gold Mine, Inc. 2012c. Exhibit RAI 2-NO-01-b- Blasting Impact Analysis, Haile Gold Mine,
Kershaw, North Carolina, Vibra-Tech Engineers, Inc., June 27. Haile Gold Mine, Inc. 2012d. Air Quality Technical Memorandum for the Haile Gold Mine Project Environmental Impact Statement, Prepared by Tetra Tech, April. Haile Gold Mine, Inc. 2013. Haile Avoidance and Minimization Efforts, December 19. Haile Gold Mine, Inc. 2014. Haile Gold Mine, Inc. Comments on the Draft EIS. May 9.
Minerals Education Coalition. 2013. Ridgeway Gold Mine. Website: http://www.mineralseducationcoalition.org/reclamation-stories/metals/goldsilver/ridgeway-goldmine. Accessed on December 9, 2013. South Technical Service, LLC. 2012. Sound Evaluation and Analysis, Romarco Minerals: Haile Gold
Therefore, the annual potential risks of injuries and fatalities to workers that would be employed for the proposed Project is likely very low. To minimize the potential risks to workers, the Applicant has included a number of avoidance and minimization measures in the design and plans for operating and managing the proposed Haile Gold Mine, such as providing training for hazardous materials handling and placing appropriate signage during closure to warn of the hazards of the pit highwalls and pit lakes. The potential risk of injury from Project facilities is considered low because of the design features of Project facilities, safety precautions and training measures that would be implemented by the Applicant, and compliance with safety guidelines. Final EIS 4.18-1 July 2014 Chapter 4 Section 4.18 Health and Safety Haile Gold Mine EIS Modified Project Alternative The potential health risks from Project facilities under the Modified Project Alternative would be the same as described for the Applicant’s Proposed Project. 4.18.2.2
American Meteorological Society. 1959. Glossary of Meteorology (R.E. Huschke, ed.) Boston, Massachusetts.
AMS. See American Meteorological Society. Haile. See Haile Gold Mine, Inc. Haile Gold Mine, Inc. 2011. Solid and Hazardous Waste Management Plan. May. Final EIS 4.18-7 July 2014 Chapter 4 Section 4.18 Health and Safety Haile Gold Mine EIS Haile Gold Mine, Inc. 2012. Supplemental Response #1 to USACE’s Request for Additional Information (RAI No. 2 dated March 20, 2012 – SH-01 to SH-07). Submitted by Haile on May 11, 2012. Haile Gold Mine, Inc. 2013a. Description of Proposed Haile Gold Mine Project. May. Haile Gold Mine, Inc. 2013b. Haile Avoidance and Minimization Efforts. December 19.
Lancaster County. 2012. Lancaster County Hazard Mitigation Plan, Lancaster County Emergency Management Department. Website: http://www.mylancastersc.org/vertical/sites/%7BA02FC01E6C41-44F4-BE02-9B73FC0206C5%7D/uploads/LANCASTER_COUNTY_HAZARD_MITIGATIO N_PLAN_2012.pdf. Accessed on July 8, 2013.
USDOT regulations and the requirements of the treatment, storage, and disposal facilities. The waste containers would be inspected for proper, non-leaking condition of the containers; that all covers, bungs, and gaskets are tight and sealed; and that all required markings and labels are present. Containment areas would be provided for chemicals that would be used in bulk volume at the Project site (Figure 4.19-1). Containment structures are designed to hold 110 percent of the volume of the largest storage vessel for each chemical plus stormwater for a 100-year, 24-hour storm event if the facility is open to the sky. Separate containment areas for each storage vessel are part of the design; they would segregate the chemicals in the event of multiple simultaneous leakage or failures of the storage vessels. For further information on containment of hazardous materials, please refer to Appendix A. Final EIS 4.19-3 July 2014 Tailings Pipeline Sediment Pond 19 Pond Water Treatment Access Road Administration Building Process Event Pond Cyanide Destruction and Recovery Carbon Handling and Refinery Reagents Parking Snow Carbon-in-Leach Haile Substation y Owl Lynches River Substation Grinding Tailings Haul Road Mill Maintenance Coarse Ore Stockpile Warehouse Stockpile Pond Truck Shop
AMEC Earth & Environmental, Inc. 2012. Haile Gold Mine, Inc. Duckwood Tailing Storage Facility
Golder Associates. 2010. Report on Feasibility Level Pit Slope Evaluation. October. Haile. See Haile Gold Mine, Inc. Haile Gold Mine, Inc. 2006. Haile Mine Post-Closure Monitoring Plan (excerpt). January. Supplemental Response to USACE Request for Additional Information (RAI) No. 2 dated January 31, 2012 (Exhibit RAI 2-EN-01-a-2). Submitted by Haile Gold Mine, Inc. on May 11, 2012. Haile Gold Mine, Inc. 2011. Solid and Hazardous Waste Management Plan. May. Haile has obtained a USEPA hazardous waste identification number. Final EIS 4.19-8 July 2014 Chapter 4 Section 4.19 Hazardous Materials and Waste Haile Gold Mine EIS Haile Gold Mine, Inc. 2012. Response to USACE Request for Additional Information (RAI) dated August 11, 2012. (Exhibit RAI 3 –WQ-14). Supplemental Information: Past Activities at Haile Gold Mine Site with Information about Reclamation and Water Quality Records. Submitted by Haile Gold
Mine, Inc. on August 11, 2012. Haile Gold Mine, Inc. 2013a. Description of Proposed Haile Gold Mine Project. May. Haile Gold Mine, Inc. 2013b. Haile Gold Mine Monitoring and Management Plan. November.
Lancaster County. 2012. Lancaster County Hazard Mitigation Plan. Lancaster County Emergency Management. Schafer. See Schafer Limited, LLC. Schafer Limited, LLC. 2010a. Haile Gold Mine Baseline Geochemistry Report. November. Schafer Limited, LLC. 2010b. Haile Gold Mine Overburden Management Plan. November. Schafer Limited, LLC. 2013. Haile Gold Mine Third Addendum to Baseline Geochemistry Report. January. Schafer Limited, LLC, AMEC Earth & Environmental, Inc., and Environmental Resource Consultants,
Inc. 2013. Draft Hale Gold Mine Revised-Post Closure Water Quality Impact Evaluation. February. U.S. Environmental Protection Agency. 1996. Guide to Environmental Issues. Office of Solid Waste and Emergency Response. J.K. Pangman (Ed.) September. Website: http://ofmpub.epa.gov/sor_internet/registry/termreg/searchandretrieve/glossariesandkeywordlists/sear ch.do?details=. Accessed on August 28, 2013. U.S. Environmental Protection Agency. 2012. Bevill Amendment Questions. Website: http://www.epa.gov/Compliance/assistance/sectors/minerals/processing/bevillquestions.html. Accessed on January 21, 2014.
Avian Power Line Interaction Committee. 2006. Suggested Practices for Avian Protection On Power Lines: The State of the Art in 2006. Edison Electric Institute, Avian Power Line Interaction
Committee, and the California Energy Commission. Washington, D.C. and Sacramento, CA. Website: http://www.aplic.org/uploads/files/2643/SuggestedPractices2006(LR-2).pdf. Accessed on December 31, 2013. Final EIS 4.20-3 July 2014 Chapter 4 Section 4.20 Connected Actions Haile Gold Mine EIS
Rural Utilities Service. 2001. Design Guide for Rural Substations. (RUS Bulletin 1724E-300.) U.S. Department of Agriculture. June. Website: http://rurdev.sc.egov.usda.gov/SupportDocuments/UEP_Bulletin_1724E-300.pdf. Accessed on December 4, 2013.
Rural Utilities Service. 2009. Design Manual for High Voltage Transmission Lines. (RUS Bulletin 1724E-200.) U.S. Department of Agriculture, Rural Utilities Service, Electric Staff Division. May. Website: http://www.rurdev.usda.gov/SupportDocuments/UEP_Bulletin_1724E-200.pdf. Accessed on December 4, 2013.
RUS. See Rural Utilities Service. Final EIS 4.20-4 July 2014 Chapter 5 Cumulative Impacts
Altman, A. 2012. Total Maximum Daily Load Document: PD-335 and PD-006: Little Lynches River and Tributary. Prepared for South Carolina Department of Health and Environmental Control, Bureau of Water.
Charlotte Business Journal. 2013. Owens Corning to create 110 jobs in Gastonia. October 22. Website: http://www.bizjournals.com/charlotte/blog/outside_the_loop/2013/10/owens-corning-to-create-110jobs-in.html. Accessed on November 20. Conservation Fund, The. 2010. The Carolina Heelsplitter Conservation Bank (South Carolina). 5 pp. Council on Environmental Quality. 1997. Considering Cumulative Effects. January.
Dahl, T.E. 1999. South Carolina’s wetlands — status and trends 1982 – 1989. U.S. Department of the
Dahl, T.E. 2011. Status and trends of wetlands in the conterminous United States 2004 to 2009. U.S. Department of the Interior; Fish and Wildlife Service, Washington, D.C. 108 pp.
Dodd, C.K., Jr. 1997. Imperiled amphibians: a historical perspective. Pp. 165–200. In G.W. Benz and D.E. Collins (Eds.). Aquatic Fauna in Peril: The Southeastern Perspective. Southeast Aquatic Research Institute, Lenz Design and Communications, Decatur, GA. (Special Publication 1.) Ecological Resources Consultants, Inc. 2011. Haile Gold Mine Cumulative Effects Analysis. May 23.
Lancaster Business Journal. 2013. Thomas & Betts to add 80 jobs in Lancaster County. March 4. Website: http://www.bizjournals.com/charlotte/blog/outside_the_loop/2013/03/thomas-betts-to-add80-jobs-in.html. Accessed on November 19, 2013. Lancaster SC Works. 2013a. Recent Announcements. Website: http://www.lancasterscworks.com/interest/expansion_and_relocation/recent_announcements/. Accessed on November 19, 2013. Final EIS 5-16 July 2014 Chapter 5 Cumulative Impacts Haile Gold Mine EIS Lancaster SC Works. 2013b. Lancaster County Air-Rail Business Park. Website: http://www.lancasterscworks.com/interest/properties/sites/air_rail_park/. Accessed on November 19, 2013. NatureServe Explorer. 2012. Semotilus lumbee. Website: http://www.natureserve.org/explorer/servlet/NatureServe?sourceTemplate=subset_tabular_report.wm t&loadTemplate=species_RptComprehensive.wmt&elKey=102725&paging=home&save=false&sum maryView=subset_tabular_report.wmt&selectedRtype=&reset=false&pageStartIndex=1&radiobutton =radiobutton. Accessed on 20 December, 2013.
Palmetto Power. 2013. Promoting Economic Development in Rural South Carolina September – October 2013. Website: http://www.scpowerteam.com/client_resources/content/newsletter/PalmPower SepOct2013.pdf. Accessed on November 20, 2013.
Red Ventures. 2013. Red Ventures Breaks Ground on 180,000 Sq. Foot Headquarters Expansion. March 11. Website: http://www.redventures.com/media/Red-Ventures-South-Carolina-Move.html. Accessed on November 19, 2013.
Rohde, F.C. and R.G. Arndt. 1991. Distribution and status of the Sandhills chub, Semotilus lumbee, and the pinewoods darter, Etheostoma mariae. Journal of the Elisha Mitchell Scientific Society, 107: 61
USEPA. See U.S. Environmental Protection Agency. U.S. Fish and Wildlife Service. 1991. Endangered and threatened wildlife and plants; animal candidate review for listing as endangered or threatened species. Federal Register, November 21, 1991, 50 CFR Part 17, 56(225): 58804–58836. Website: http://www.fws.gov/ecos/ajax/docs/federal_register/fr1973.pdf. Accessed on December 11, 2012. U.S. Fish and Wildlife Service. 2011. Endangered and threatened wildlife and plants; 90-day finding on a petition to list the American eel as threatened. Federal Register, September, 29, 2011, 76 (189): 60432–60444. Website: http://www.gpo.gov/fdsys/pkg/FR-2011-09-29/pdf/2011-25084.pdf. Accessed on December 11, 2012. Final EIS 5-20 July 2014 Chapter 5 Cumulative Impacts Haile Gold Mine EIS U.S. Geological Society. 2012. Gold Deposits of the Carolina Slate Belt, Southeastern United States: Age and Origin of the Major Gold Producers. (Open-File Report 2012–1179.)