098 EPA Draft Economic Analysis - Proposed Revisions to Protection Standards for Uranium Tailings Rule 2014
Other documents for the same rulemaking
References: 35 extracted, 6 linked to papers
U.S. Energy Information Administration, 2014b. Domestic Uranium Production Report – Annual. May 1, 2014.
U.S. Census Bureau, 2013. Statistics of U.S. Business. 2011.
University of Chicago, 2004. The Economic Future of Nuclear Power.
Ux Weekly, 2004, Supply Elasticity of Uranium.Ux Weekly. Volume 18, Issue 39, September 27, 2004.
U.S. Geological Survey. 2009. Groundwater Restoration at In-Situ Recovery Uranium Mines, South Texas Coastal Plain. Open File Report 2009-1143. Written by Susan Hall.
Davis, J.A. and G.P. Curtis, 2007. NUREG/CR–6870, “Consideration of Geochemical Issues in Ground Water Restoration at Uranium In-Situ Leaching Mining Facilities.”
Reilly, T.E., K.F. Dennehy, W.M. Alley, and W.L. Cunningham, 2008. Ground-Water Availability in the United States: U.S. Geological Survey Circular 1323, 70 p.
Poe, G., K. Boyle, and J. Bergstrom, 2001. “A Preliminary Meta Analysis of Contingent Values for Groundwater Quality Revisited.” In The Economic Value of Water Quality.
National Academy of Sciences (NAS), 1997. Valuing Groundwater: Economic Concepts and Approaches.
Young, R.A., 2005. Determining the Economic Value of Water: Concepts and Method.
McWorter, D.B. and D.K. Sunada, 2010. Ground-Water Hydrology and Hydraulics.
Pearson, F.J., Jr., C. J. Noronha and R.W. Andrews, 1983. “Mathematical Modeling of the Distribution of Natural 14-C, 234-U, and 238-U in a Regional Ground-Water System,” Radiocarbon, Vol.25, No. 2, p 291-300.
McDonald, M.G., and A.W. Harbaugh, 1983. A modular three-dimensional finite-difference ground-water flow model. Open-File Report 83-875.
Zheng, C. and P.P. Wang, 1999. MT3DMS: A modular three-dimensional multispecies model for simulation of advection, dispersion and chemical reactions of contaminants in groundwater systems.
Michel, T.G. and G. Hoffman, July 1991. E-Field 50 Sand Mine Unit Hydrology Test, Highland Uranium Project.
U.S. Environmental Protection Agency (EPA), 2001. Cost of Analysis for Selected Groundwater Cleanup Projects: Pump and Treat Systems and Permeable Reactive Barriers; EPA Document No. 542-R-00-013.
Shafer, D., R. Bush, W. Dam, and T. Pauling, March 2014. The Future is Now: Experience with Remediating and Managing Groundwater Contamination at Uranium Mill Tailing Sites – 14587.
U.S. Nuclear Regulatory Commission, 2009. Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities. NUREG-1910.
U.S. EPA, 2012a
USGS, 2009
Shafer et al., 2014
DRET, 2010
World Nuclear Association [WNA], 2012a
Poe et al. (2001)
U.S. EPA, 2012d
NAS, 1997
Davis, 2007
U.S. EPA, 2012c
Reilly et al, 2008
U.S. EPA, 2010
Pearson Jr., Noronha, and Andrews, 1983
Michel and Hoffman, 1991
Cameco Resources, 2008
EIA, 2014b
EPA, 2006