Oil and Natural Gas Production MACT and Natural Gas Transmission and Storage MACT - Glycol Dehydrators: Impacts of MACT Review Options
Other documents for the same rulemaking
References
PEC + EM $11,840 $17,270 Total capital investment for an existing 1.15(TCIN) unit (TCIE)** Minor discrepancies may be due to rounding. $13,620 $19,860 † Costs escalated from July 1993 dollars to 2008 dollars using the ratio of Chemical Engineering cost indices (Reference 9). July 1993 Cost Index = 394.4; 2008 Cost Index = 575.4. ‡ Direct and indirect costs are included in the condenser cost. § Procedures followed from OAQPS Control Cost Manual for calculating PEC and TCI (Reference 8). ** Total capital investment for an existing unit accounts for a retrofit factor of 1.15. Table 4. Total Capital Investment for Small Glycol Dehydration Units that Install a Condenser (Dehy-B) Equipment Condenser Description Condenser, piping to control device Size Factor Condensate storage vessel Fixed-roof tank 50 gal 2.72 (Vtank) + 1,960 Purchased equipment cost (PEC)‡ Jul-93 Reference Cost $6,800†
OAQPS Control Cost Manual: Fourth Edition (EPA 450/3-90-006, January 1990). U.S. Environmental Protection Agency. Research Triangle Park, NC. 13 .
Fernandez, R, U.S. Environmental Protection Agency, Natural Gas STAR Program, et al. "Cost Effective Methane Emissions Reductions for Small and Midsize Natural Gas Producers" Journal of Petroleum Technology. June 2005