App H USEPA and MTDEQ 1998-ROD Anaconda Regional Waster Waste and Soils OU
Other documents for the same rulemaking (all, by stage)
References
Sutter, M.D., D.C Rawson, J.A. McKeown, and A.R. Haskell. 1958. Chronic copper toxicosis in sheep. American Journal of Veterinary Research 19:890-892.
Staples, E.L.T. 1955. Experimental lead poisoning in dogs. New Zealand Veterinary Journal 3:39-46.
White, D.H. and M.T. Finley. 1978. Uptake and retention of dietary cadmium in mallard ducks. Environmental Research 17:53-59.
Wilson, P.R. 1989. Bodyweight and serum copper concentrations of farmed red deer stags following oral copper oxide wire administration. A/ew Zealand Veterinary Journal 37:94-97.
OU) (CDM 1997a). The reduction of risk and the protection of ecological systems is to be accomplished tlirough the establishment of self-sustaining assemblages of plant species capable ofthe following: stabilizing soils from erosion; minimizing transport of contaminants to surface and ground waters; maximizing water usage tlirough evapotranspiration; providing wildlife habitat, and; accelerating plant successional processes. The purpose of this guidebook is to defme a process for determining which areas at the site will receive some type of land reclamation and, to the e.xtent possible, the most appropriate reclamation teclmiques and intensity level to apply. To accomplish this goal, existing information for risk assessments, remedial action objecti\'es, and selected remedial altemative is required. Utilizing the statutory requirements as a backdrop, field evaluations of each potential reclamation area is required. Field work will employ the decision making tool described herein (i.e., the Land Reclamation Evaluation System), which integrates guidance criteria, a quantitative scoring system of e.xisting vegetation communities and potential for contaminant movement, and modif}'ing factors. The result is a site specific ranking ofthe need for reclamation and spatial delineation of preliminar>' remedial units.
ALTERNATIVE DESCRIPTIONS Remedial altematives were assembled in the draft Feasibilit}- Study (CDM Federal 1997) to address solid (soils and waste) and water (surface and ground ) media. Alternatives that include some component of land reclamation include the following: Capping Soil Cover Reclamation Level I Level II Level III Partial Reclamation Reclamation/Soil Cover Removal Partial Removal
ARCO. 1992. Clark Fork River Superfund Site Investigations Standard Operating Procedures. Prepared by Canonie Environmental Services, September.
CDM Federal. 1997. Anaconda Smelter NPL Site, Anaconda Regional Water, Waste, and Soils Operable Unit Draft Feasibility Study Deliverable No. 5. Prepared for EPA. February 14. Clark. R. 1980. Erosion Condition Classification System. U.S. Dept. of Interior, Bureau of Land Management. Denver, CO. 47 p. Mueller-Dombois and Ellenberg. 1974. Aims and Methods of Vegetation Ecology. John Wiley & Sons, New York.
PTI. 1992. Clark Fork River Superfund Site Investigations Data Management and Data Validation Plan. Prepared for ARCO. May.
Reclamation Research Unit. 1997. Anaconda Revegetation Treatability Studies Final Report, Phase IV: Monitoring and Evaluation. Volumes I and II. RRU Publ. No. 9703. MSU,
LIST OF TABLES Table 1 Table 2 Table 3 Table 4 Table 5 Table 6 Table 7 Table 8 Summary of Restoration Altemative Costs Summary of Analytical Results for Seep/Spring and Domestic Well Samples Collected in 1997 at the ARWW&S OU Calculation of Percent meq/L A Comparison of Analytical Results of Soil Samples Collected from 0-2 and 2-6 Inches at Stations Located in TI Zones at the ARWW&S OU Sunmiary of Arsenic Levels in Soil at Spring Sample Locations and Estimated Levels of Arsenic in Regional Surface Soils Predicted by ARCO (ARCO 1996) Summaiy of Analytical Results of Surface Soil Samples Collected by NRDP Summary of Analytical Results of Surface Soil Samples, Ground Water Samples, and Estimated Values for Arsenic in Regional Soil at 1997 Spring Locations
LIST OF FIGURES Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figtire 7 Figure 8 Figure 9 Figure 10 Figure 11 Figure 12 Figure 13 Map of TI Zone Boundaries Identified at the ARWW&S OU in 1996 by EPA Water Table Map (August 1996) for the Alluvial Aquifer in the EAY Area Arsenic v. Elevation for Spring/Seep Samples Arsenic Concentration v. Distance from Smelter Stack for Spring Locations at Elevations Below the Top ofthe Stack (6,360 ft.) Arsenic Concentration v. Distance from Smelter Stack for Spring Locations at Elevations Above the Top ofthe Stack (6,360 ft.) Average Major Ion Chemistry of Waters in Local Geologic Units ofthe Bedrock Aquifer Arsenic v. Sulfate in Springs - All Locations Arsenic v. Sulfate in Bedrock Wells Arsenic v. Depth to Water-Bearing Zone in Bedrock Monitoring Wells on Smelter Hill Arsenic in Soil v. Arsenic in Springs Arsenic in Springs v. Arsenic in Soil - Sorted by Elevation Arsenic in Springs v. Arsenic in Soil - Sorted by Distance from Stack Arsenic in Springs v. Estimated Arsenic in Soil D-iii
USGS 1997 Sample Results Inventory of Domestic Wells in TI Zones at the ARWW&S OU Summary of Analytical Results and Station Coordinates for Wells,
ARCO. 1994. Anaconda Regional Water and Waste Operable Unit Data Summary Report, Third Ouaj-ter 1993. Prepared by Environmental Science & Engineering, Inc. January 1994.
ARCO. 1996. Final Community Soils Operable Unit Remedial Investigation/Feasibility Study Report. Prepared by Advanced GeoServices Corporation for ARCO. September 30.
ARCO. 1997a. 1997 Field Activities Data Summary Report, Anaconda Regional Water, Waste, and Soils Operable Unit Technical Impracticability Zone Boundaries. Prepared by QST Environmental for ARCO. November 1997.
ARCO. 1997b. Anaconda Smelter NPL Site, Anaconda Regional Soils Operable Unit Remedial Investigation Report. Prepared by Titan Environmental Corporation for ARCO. Febmary 1997.
ARCO. 1997c. Letter from Phyllis Flack to Julie DalSoglio and Andy Young with a modified version ofthe work plan for additional data collection in support of groundwater ARAR TI waiver application at tiie ARWW&S OU, dated April 11,1997.
Davis, S.N., and R.J.M. DeWiest. 1966. Hydrogeology. John Wiley & Sons, New York.
EPA. 1996a. Draft Feasibility Study Deliverable No. 3A Ground Water Technical Impracticability Evaluation, Anaconda Smelter NPL Site, Anaconda-Deer Lodge County,
Montana, Anaconda Regional Water, Waste, and Soils Operable Unit. Prepared by CDM Federal for EPA. December 19,1996.
EPA. 1996b. Final Feasibility Study Deliverable No. 3B, Anaconda Smelter NPL Site Anaconda-Deer Lodge County, Montana, Anaconda Regional Water, Waste, and Soils Operable Unit. Prepared by CDM Federal for EPA. October 24,1996.
EPA. 1997a. Draft Feasibility Study Deliverable No. 5, Detailed Analysis ofAlternatives ft^r Anaconda Smelter NPL Site, Anaconda-Deer Lodge County, Montana, Anaconda Regional
Water, Waste, and Soils Operable Unit. Prepared by CDM Federal for EPA. Febmary 14, 1997.
EPA. 1997b. Proposed Plan for the Anaconda Regional Water, Waste, and Soils Operable Unit, .Anaconda-Deer Lodge County, Montana. Prepared by EPA Region 8, Montana Office and the Montana Department of Environmental Quality. October 1997.
EPA. 1997c. Letter from Julie DalSoglio to Phyllis Flack submitting final EPA comments pertaining to the modified work plan pertaining to 1997 Field Activities in TI zones at the
ARWW&S OU, dated May 1, 1997. MBMG. 1998. Geologic map ofthe Butte 1 °x 2° Quadrangle, Montana. Montana Bureau of Mines and Geology open file report 363. Scale 1:250,000. D-32
NRDP. 1995. Terrestrial Resources Injury Assessment Report Upper Clark Fork River NPL Site. Prepared for the State of Montana Natural Resource Damage Program by RCG/Hagler Bailly. January 1995. Olson-Elliott and Associates (Olson-Elliott). 1975. Anaconda Smelter NPL Site Wetlands and Threatened/Endangered Species Inventory with Analyses of Vegetation in the Vicinity of
Anaconda, Montana. Study conducted by Olson-Elliott for Anaconda Minerals Company. October 31,1975.
PTI. 1996. Anaconda Smelter NPL Site, Smelter Hill Operable Unit Remedial Investigation Report: Prepared for ARCO by PTI Environmental Services. December 1996.
SRK. 1982. Subsoil Attenuation and Flue Dust Testing for the Reclamation of Anaconda Reduction Works. Prepared by Steffen, Robertson, and Kirsten, Inc, Lakewood, Colorado for Anaconda Minerals Company. September 1982. Tetta Tech, Inc. 1987. Anaconda Smelter Remedial Investigation/Feasibility Study Master Investigation Draft Remedial Investigation Report. Prepared for Anaconda Minerals Company. March 1987.
USGS. 1997. Letter from David Nimick to Julie DalSolgio submitting results of springs and surface water sampling at the Anaconda Smelter Site, dated August 29,1997. D-33
LIST OF FIGURES Figure 1 Figure 2 Figure 3 Kaputska Phytotoxicity Scores Versus Metal Concentration and pH Bivariate Expression of Kaputska Phytotoxicity Scores with pH and Total Metals Concenfrations Kaputska et al. (1995) Toxicity Score Line in Reference to Soils Collected in EPA 1995 Survey of Vegetation Areas (VAs) G/H-ii
ARCO reviewers have focused their critiques on this subject-matter toward "guidelines", rather than on the "guidance" under which the Final BERA was drafted (Ecological Risk Assessment for Superfund, EPA 1997). It should also be noted that the risk assessment guidance documents do not preclude the use of professional judgement in applying these practices to specific sites.
EPA Guidance in Effect at the Time of Document Preparation Anaconda Risk Assessment Document Phase 1 Screening Level Document, CDM Federal 1994
EPA 1992, 1994 Preliminary Baselme Ecological Risk Assessment (PBERA),
CDM Federal 1995a EPA 1994, 1995 PBERA Supplement, CDM Federal 1995b
EPA 1994, 1995 Draft Final Baseline Ecological Risk Assessment (BERA), CDM Federal 1996
ARCO should note that the information presented in the Draft Final BERA was reorganized in the final BERA to demonstrate that the approaches used followed the eight-step process, as outlined in the most current guidance (EPA 1997). A thorough review ofthe various ecological G/H-1 risk assessment documents prepared for the Anaconda Site since 1994 demonstrates to the reader that EPA did follow guidance in the assessment of potential ecological risks for this site. Also,
ARCO reviewers seem to have lost sight ofthe fact that the assessments of risk were done in an iterative process, incorporating site-specific data (much of it from ARCO), to continue refining areas of greatest concem while systematically eliminating areas that do not have elevated contaminant levels, have mitigating factors to counteract contaminant of concem (COC) concenfrations, or that appear to be naturally recovering. The steps to be included in an ecological risk assessment, per EPA guidance (EPA 1997), include the following: Screening level problem formulation and ecological effects evaluation Screening level exposure estimate and risk calculation Baseline risk assessment problem formulation Study design and data quality objectives process Field verification of sampling design Site investigation Risk characterization Risk management Each of these components was addressed in the assessment of risks for the Anaconda Smelter Site. This process included the development ofthe Phase I Screening Level Ecological Risk
ARCO and its contractors. The additional field sampling was conducted in late summer 1995. Draft Final and Final Baseline Ecological Risk Assessment The results ofthe 1995 sampling effort were integrated with the information presented in the
VEGETATIVE STRESS EPA takes issue with the ARCO reviewer's broad bmsh statements that EPA "failed" to consider the effects of SO2 fumigation in the assessment of ecological risks for the Anaconda Smelter Site. In actuality, through the various iterations of reports, from the Phase 1 Screening Level Ecological Risk Assessment (CDM 1994), to tiie PBERA (CDM 1995a), to the PBERA Supplement (CDM 1995b), to tiie Final BERA (CDM 1997), EPA has responded to ARCO's earlier comments and incorporated greater discussion of SO, and other non-chemical sfressors in the assessment of potential risks at the site.
ARCO's reviewers from ENSR make a further comment that EPA failed to consider rates of recovery at other sites to evaluate the likelihood that the hypothesized stressor has caused the adverse effects. ENSR reviewers must not have reviewed the State of Montana's Findings of Facts document, where Larry Kapustka discusses that in studies of other ecological systems recovering from SO,, grassland and forb communities have recovered within two decades after the emissions were removed, and canopy forest was re-established within 30 years. Therefore, one would expect to see a substantial recovery in areas ofthe site impacted by SO2 emissions if SO2 was the only controlling factor, because all SO2 emissions ceased in 1980 with the closure of the smelter. ENSR reviewers further commented that EPA introduces the site's historical legacy, but fails to describe the historic emissions and probable effects of a known site stressor, sulfur dioxide. In support of their position, they present Figure 4 to show the estimated levels of emissions of SO2fromthe smelter. This figure also supports Larry Kapustka's deposition and
ARCO. 1994. Regional Ecorisk Field Investigation. Upper Clark Fork River Basm. Prepared by PTI Environmental Services. November.
ARCO. 1997. Remedial Investigation Report for the Anaconda Regional Soils Operable Unit. Prepared by Titan Environmental. February.
Carlson, CE. 1974. Evaluation of Sulfur Dioxide Injury to Vegetation on Federal Lands Near the Anaconda Copper Smelter at Anaconda, Montana. USDA Forest Service/Northem Region,
Missoula, Montana. May. CDM Federal. 1994. Phase 1 Screening Level Ecological Risk Assessment for the Anaconda Regional Water and Waste and Anaconda Soils Operable Units, Anaconda Smelter NPL Site,
CDM Federal. 1995a. Final Preliminary Baseline Ecological Risk Assessment for the Anaconda Regional Water and Waste and Anaconda Soils Operable Units, Anaconda Smelter NPL Site,
CDM Federal. 1995b. Supplement to the Preluninary Baseline Ecological Risk Assessment for the Anaconda Regional Water and Waste and Anaconda Soils Operable Units, Anaconda Smelter
CDM Federal. 1996. Draft Final Baseline Ecological Risk Assessment for the Anaconda Regional Water, Waste, and Soils Operable Unit, Anaconda Smelter NPL Site, Anaconda, Montana. Prepared for EPA. October 7.