EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA or Agency) conducted an inspection from May 7-11, 2001 of an audit by the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) of the Westinghouse TRU Solutions (WTS or Site) quality assurance (QA) program. The investigation of the activities selected for the EPA and DOE audit sample showed that WTS has properly maintained its QA program since the previous inspection conducted on August 8, 2000.
WTS is the DOE's performance-based management and operating (M&O) contractor at the WIPP. As such, WTS's responsibilities include the day-to-day management, operations, and maintenance ofthe WIPP. The WTS QA program provides on-site surveillance of activities that are important to the containment of TRU wastes within the WIPP. In August 1997, the EPA initially determined that the WTS QA program was properly executed. On February 17-19,1998, February 9-11,1999, June 30, 1999 and on August 7-8, 2000, the EPA determined that the WTS QA program had been properly maintained since the initial approval. The purpose ofthis inspection on May 7-11, 2001 was to determine whether the WTS QA program continues to be properly maintained since last year's inspection. This report documents the results ofthe EPA inspection to verify whether or not
CFR 194.22(a)(1) includes, by reference, the requirements of ASMENQA-1-1989 edition, ASME
NQA-2a-1990 addenda, part 2.7 to ASME NQA-2-1989 edition, and ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c), and Section 17.1).
NQA-2a-1990 Addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The purpose ofthe EPA inspection was to confirm the continued compliance ofthe WTS QA program with the above requirements. 40 CFR 194.22(a)(2) requires that WTS properly execute a QA program for all items and activities that are important to the containment of TRU waste in the WIPP. The scope ofthis
CBFO. Audit Checklists for A-01-13. CBFO. "Executive Summary for A-01-13," presented during the audit close-out meeting on May 14, 2001. (See attachment 3 ofthis inspection report.)
CBFO. "Quality Assurance Program Document", CAO-94-1012, R3, November 1999.
CBFO. Management Procedure 10.3, R3, Audits, November 24,1999.