Letter/EPA/F. Marcinowski to DOE/I. Triay transmitting findings on Clay Seam G proposal (includes DOE correspondence of June 26, 2000) (A-98-49-II-A3-24)
Other documents for the same rulemaking (all, by stage)
References: 2 extracted, 0 linked to papers
FRACTURED ROOF BEAMS Introduction The behavior of the underground excavations at the Waste Isolation Pilot Plant has been intensely studied for over ten years. Ail excavations have performed their intended functions safely with normal maintenance and ground support. The deformation characteristics and mechanisms are well understood. Many openings such as the main access drifts and shaft stations must remain open for the life of the facility. With many openings now ten years old or older and a twenty-five year operational (disposal) phase planned for 1998, these drifts are required to be usable for over forty years. It has been proposed that mining out the roof of the excavations up to the nearest clay seam may extend the useful life of some excavations. This report reviews available rock mechanics information relevant to improving drift stability by removing the roof beam. For the purposes of this document, a "roof beam" is defined as the section of rock between the roof of the excavation and the nearest clay seam above the roof. A drift with a clay seam forming the roof is defined as having no roof beam.
USDOE, 1993, "Geotechnical Reid Data and Analysis Report, Volume I of II, July 1991 -June 1992," Waste Isolation Pilot Plant. Carisbad. New Mexico. P.72 Time Figure 1 Typical Convergence Rate Curve Leading to Failure Clay G Clay G Ends Provide Support 1) Sides provide little t o oo support 2 ) End relatively strong Figure 2 Advanced Fracture Fonnation in Roof P.73 (a) opening with r o o f and f l o o r beans clay sean 9>-+ .-*— <r cloy seon (b) opening with no r o o f or floor bean cloy seart <cloy seam \ Figure 3 Stress Concentration Comparison for Two Different Roof Beam Geometries P.74