Letter/EPA/F. Marcinowski to DOE/I. Triay, transmitting report for inspection no. EPA-SNL-11.02-22 [A-98-49-II-A1-42]
Other documents for the same rulemaking (all, by stage)
References: 17 extracted, 0 linked to papers
EXECUTIVE SUMMARY The U.S. Environmental Protection Agency ("EPA" or "Agency") conducted an audit on November 5-7,2002, ofthe Sandia National Laboratories (Sandia) Quality Assurance (QA) Program for the Waste Isolation Pilot Plant (WIPP). The investigation ofthe activities selected for the EPA audit sample showed that Sandia has properly maintained its QA Program for the
CAR and the concern dealing with QA resources. The EPA will conduct follow-up audit(s) within the next six months to further assess these issues. The EPA findings and concerns were formally communicated to the CBFO QA Manager during the audit closeout. The appropriate QA Program requirements are set forth in 194.22(a), which includes by reference, the requirements of ASME NQA-1-1989 edition; ASME NQA-2a-1990 addenda, part 2.7 to ASME NQA-2-1989 edition; and ASME NQA-3-1989 edition (excluding Section 2.1 (b) and (c), and Section \7A). Sandia has offices in both Albuquerque and Carlsbad, New Mexico, and serves in a contractor capacity to CBFO, which is responsible for the management ofthe WIPP. Sandia has conducted numerous research programs in support ofthe WIPP, including performance assessment and software development activities. Sandia has transferred all of its WIPP support activities from Albuquerque to Carlsbad.
CFR 194.22(e). On September 1998, November 1999, November 2000, and November 2001, the Agency conducted inspections subsequent to the approval to confirm continued compliance. This report documents the results ofthe audit conducted on November 5-7, 2002, and will be made available to the public through the Agency's public dockets, as described in 40 CFR 194.67. The history of Agency audits and inspections at Sandia are presented in Table 1 at the end of this subsection. At 194.22(a), EPA requires the WIPP to execute a QA Program that invokes the following QA standards: 1) ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990 Addenda, Part 2.7, to ASME
WIPP support activities Inspection September 21-25, 1998 Inspection of DOE Audit A-98-19 of Sandia QA program Inspection November 8-11, 1999 Inspection of DOE Audit A-00-01 of Sandia QA program Inspection November 28-30, 2000 Inspection of DOE Audit A-O 1-04 of Sandia QA program Inspection October 30-November 1, 2001 Inspection of DOE Audit A-02-01 of Sandia QA program Audit November 5-7, 2002 Audit of QA Program for Sandia WIPP support activities Sandia National Laboratories Background Sandia is located in both Albuquerque and Carlsbad, New Mexico, and serves in a contractor capacity to CBFO, which is responsible for the management ofthe WIPP. Sandia has conducted
1. DOE Sandia National Laboratory. NP 1-1, Organization and QA Program, Rev. 4, effective date: November 30,2000.
1. DOE Sandia National Laboratory. NP 2-1, Qualification and Training, Rev. 4, effective date: May 26, 2000.
1. DOE Sandia National Laboratory. NP 4-1, Procurement, Rev. 4, effective date: February 22/2001.
1. DOE Sandia National Laboratory. NP 9-1, Analyses, Rev. 4, effective date: August 29, 2001.
1. DOE Sandia National Laboratory. NP 19-1, Software Requirements, Rev. 7 effective date: August 30, 2001.
1. DOE Sandia National Laboratory. NP 16-1, Corrective Action, Rev. 2 effective date: November 23,1999.
Database, Rev. 3 effective date: December 5, 2000.
1. DOE Sandia National Laboratory. SNL NWMP Organization Chart, October 11,2001.
1. QA Responsibilities Matrix 1. SNL WIPP Program Description, August 28, 2001 1. Quarterly (3rd) SNL Quality Assurance WIPP Improvement Status Report (WISR), July 2,2001 1. Quarterly (4th) SNL Quality Assurance WIPP Improvement Status Report (WISR), October 1,2001
1. CARW-99-011 1. CARWP-02-01 1. Shoemaker, Paul E., Sandia/Carlsbad Programs Group Manager letter to Thomas J. Reese, U.S. DOE Carlsbad Field Office. "Subject: Response to Corrective Action Reports (CARs) form CBFO audit A-02-01" December 4,2001 P.32
1. Shoemaker, Paul E., Sandia/Carlsbad Programs Group Manager letter to Ava Holland, Quality Assurance Manager Carlsbad Field Office. March 11,2002
1. Triay, Dr. Ines R., Manger Carlsbad Field Office letter to Elizabeth K. Forinash, Director Center for Federal Regulations Office of Radiation and Indoor Air, USEPA. "RE: Response to EPA Inspection Report on CBFO Audit A-02-01. March 14,2002 1. Sandia National Laboratories Nuclear Waste Management Program Quality Assurance. Quality Assurance Audit Report ofthe SNL WIPP QA Program Adequacy and Implementation. Audit Number: IA 02-01, June 10-12, 2002.
1. Chism, M. Lee Memorandum to Paul E. Shoemaker, SNL. Verification of Corrective Actions and Closure of CAR 02-017. July 24, 2002