Letter/EPA/ F. Marcinowski to DOE/I. Triay, Transmitting report for inspection no. EPA - CBFO - 1.01 - 22 [A-98-49-II-A1-24]
Other documents for the same rulemaking (all, by stage)
References: 36 extracted, 0 linked to papers
EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA) conducted an annual audit ofthe Department of Energy (DOE) Carlsbad Field Office (CBFO) quality assurance program from January 9-10, 2001. The CBFO is responsible for the management ofthe Waste Isolation Pilot Plant (WIPP), the geologic repository for the disposal ofthe nation's transuranic wastes. The purpose ofthe
CBFO has appropriately maintained its QA program since the previous EPA audit conducted in Jaunuary 2000. This report will be made available to the public through the Agency's public dockets. .- -.. -. • - • --=-_•• ^> _„ The EPA found that CBFO's quality assurance program continues to comply with the EPA requirements for WIPP quality assurance programs. During the audit, the EPA: 1) verified the continued establishment ofthe applicable QA requirements in the CBFO Quality Assurance Program Plan (QAPD); 2) verified the implementation of a sample of-QA requirements through interviews and reviews of CBFO documents. The EPA identified four findings of non-conformance and one concern during its audit ofthe
BACKGROUND Regulatory Background EPA promulgated criteria in 40 CFR Part 194 to determine whether the DOE WIPP will comply with EPA's environmental radiation protection standards for the disposal of transuranic wastes. At § 194.22(a)(1), EPA requires DOE to adhere to a QA program that implements the requirements ofthe following: 1) ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990
Addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The Agency verified that DOE established these requirements in the Quality Assurance Program Doc"unTeTiF(tfAPD) included in the Compliance Certification Application (CCA) for the WIPP. The QAPD is the documented QA program plan for the WIPP project, as a whole, to comply with the NQA requirements. The
QA programs establish and implement the applicable requirements ofthe QAPD. The DOE generator sites, which will characterize and ship waste for disposal in the WIPP, must prepare site-specific QA program plans that establish the applicable NQA requirements. In accordance with 40 CFR 194.22(e), the EPA Administrator verifies the "appropriate execution of quality assurance programs through inspections, record reviews and recordkeeping requirements, which may include, but may not be limited to, surveillance, audits and management systems reviews." In December 1996, EPA conducted an audit that determined that
CFR 194.22(a) Audit January 6-8, 1999 Audit for maintenance of QA program for conformance with 40
CFR 194.22(a) Audit January 4-6, 2000 Audit for maintenance of QA program for conformance with 40
CFR 194.22(a) Audit January 9-10,2001 Audit for maintenance of QA program for conformance with 40
WIPP, the CBFO conducts an audit ofthe QA program, as well as waste characterization program, to certify that they are in compliance with the CBFO QAPD. Prior to September 2000, the CBFO was known as the Carlsbad Area Office (CAO). In this audit report, discussions of actions by CAO or documents prepared by CAO have been changed to reflect the new name, Carlsbad Field Office, or abbreviation (CBFO).
PURPOSE AND SCOPE The EPA's ORIA conducted an audit from January 9-10, 2001 ofthe CBFO QA program. The purpose ofthe audit was to confirm the continued compliance of CBFO's QA program with the requirements of 40 CFR 194.22, which addresses quality assurance for activities associated with the WIPP. The inspection was conducted under the authority of 40 CFR 194.22(e), which allows the Agency to verify the appropriate execution of QA programs through inspections, record reviews, and other measures. This report documents the results ofthe EPA audit to verify whether or not CBFO has appropriately maintained its QA program. The scope ofthis audit covers all aspects ofthe CBFO quality ¥lstifance program for all items and activities important to the containment of tranuranic waste at the WIPP. The EPA inspection team conducted the following activities: In accordance with § 194.22(e), the EPA inspection team evaluated Revision 3 of the QAPD and a sample of CBFO management and team procedures (MPs and TPs) to verify that revisions do not diminish the establishment of applicable NQA requirements. In accordance with § 194.22(e), the inspection team performed the following activities to verify the proper implementation of a sample of NQA requirements by the CBFO QA program: conducted interviews of CBFO management, staff, and support contractors; and conducted an assessment of CBFO's implementation of quality assurance requirements pursuant to NQA-1, Elements 1, 2, 5, 6, 17, and 18. P.10
ATTACHMENT 4 REFERENCES DOE Carlsbad Field Office. Quality Assurance Program Document, CAO-94-1012, Rev. 3, November 1999.
DOE/WIPP-98-2287, Rev.2, January 2000. DOE Carlsbad Field Office. Management Assessment JAeport-February 16-19, 1999. Approved January 16,1999.
DOE Carlsbad Field Office. Management Procedure 1.2, Rev. 1, Selection of Quality Levels and Applicable QA Requirement, October 20,1998. ICN#1 (December 7, 1998)
Procedure, August 13, 1998. ICN#1 (August 18, 1998) and ICN#2 (December 13, 2000)
Reporting, November 28, 2000. DOE Carlsbad Field Office. Team Procedure 3.2, Rev. 1, Corrective Action Report (CAR) Trend Analysis and Reporting (QA only), December 6, 1999.
DOE Carlsbad Field Office. Management Procedure 4.1, Rev. 3, Preparation and Maintenance of CBFO Procedures, January 5, 2001.
DOE Carlsbad Field Office. Management Procedure 4.2, Rev. 2, Document Review, January 5, 2001.
Control, January 5, 2001. 11. DOE Carlsbad Field Office. Management Procedure 4.5, Rev. 1, Generating, Receiving,
Storing, and Controlling Active CAO Project Records, December 28, 1996.
Inventorying, Scheduling, and Dispositioning, December 28, 1996.
16. DOE Carlsbad Field Office. Management Procedure 7.1, Rev. 1, QA Requirements for Procurement of Goods and Services, June 25, 1998.
17. DOE Carlsbad Field Office. Management Procedure 9.1, Rev. 2, Management Assessment, November 17, 2000.
18. DOE Carlsbad Field Office. Team Procedure 10.1, Rev.2, Qualification of Audit Personnel and Certification of Lead Auditors, October 26,2000.
19. DOE Carlsbad Field Office. Management Procedure 10.2, Rev. 2, Surveillances, September 4, 1998.
20. DOE Carlsbad Field Office. Management Procedure 10.3, Rev. 3, Audits, November 24, 1999. ICN#1 (February 3, 2000) and ICN#2 (July 12, 2000)
21. DOE Carlsbad Field Office. Management Procedure 10.4, Rev. 3, Observations, May 18, 1999.
22. DOE Carlsbad Field Office. CAO Corrective Action Report Log, Fiscal Year 1999.
23. DOE Carlsbad Field Office. CAO Corrective Action Report Log, Fiscal Year 2000.
24. DOE Carlsbad Field Office. Organization Chart. January 2, 2001.
27. DOE Carlsbad Field Office. Audit Report ofthe Idaho National Engineering and Environmental Laboratory, Audit Number A-01-02, December 5-7, 2000. Approved January 4, 2001.
28. DOE Carlsbad Field Office. Carlsbad Field Office Audit Plan, Audit Number-A-01 -02. Approved October 12,2001.
29. DOE Carlsbad field Office. Audit Report ofthe Los Alamos National Laboratory, Audit Number A-00-13, August 28-31, 2000. Approved September 19, 2000. P.61
30. DOE Carlsbad Field Office. Audit Report ofthe Savannah River Site, Audit Number A-01 01, November 7-16,2000. Approved December 14, 2000.
31. DOE Carlsbad Field Office. Management Assessment Plan, "Plan for a Management Assessment ofthe Organizational Climate for Quality," November 1, 2000.
32. DOE Carlsbad Field Office. Management Assessment Report, "The Organizational Climate for Quality," December 13,2000. Approved December 21, 2000.
33. DOE Carlsbad Field Office. Management Assessment Plan, "Plan for a Management Assessment ofthe QA Program at the Carlsbad Field Office," November 1, 2000.