Letter/EPA/F. Marcinowski to DOE/I. Trial transmitting report for inspection no. EPA-INEEL-4.00-22 [A-98-49-II-A1-16]
Other documents for the same rulemaking (all, by stage)
References: 5 extracted, 0 linked to papers
EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA, or the Agency) conducted an inspection, on April 24-27,2000, of the U.S. Department of Energy (DOE) Carlsbad Area Office (CAO) Audit A-00-06 of the Idaho National Engineering and Environmental Laboratory (INEEL) quality assurance program for Waste Isolation Pilot Plant (WIPP) activities. The Agency conducted a follow-up inspection on May 17. 2000 to observe corrective action resolution activities and witness the data transfer between INEEL and the WIPP. INEEL is located near Idaho Falls, Idaho and is responsible for characterization of a portion ofthe nation's transuranic (TRU) wastes. The purpose of CAO Audit A-00-06 is to verify the establishment and proper implementation of a quality assurance program forthe characterization of transuranic wastes proposed for disposal in the
INEEL was required to continue compliacce of its quality assurance program. In 1999, the Agency performed an inspection under the authority of §194.8(a)(4) of CAO's maintenance Audit A-99-08. which was conducted to recertify INEEL for shipment of transuranic wastes to WIPP. However.
INEEL was required to continue compliance of its quality assurance program. In 1999, the Agency performed an inspection under the authority of §194.8(a)(4) of CAO's maintenance Audit A-99-08, which was conducted to recertify INEEL for shipment of transuranic wastes to WIPP. However,
Denver, Colorado and buried prior to 1970. Transuranic wastes stored at INEEL are destined for disposal at the WIPP, the geologic repository for the disposal ofthe nation's TRU wastes. The DOE Carlsbad Area Office is responsible for the management of the WIPP and for assuring that generator sites, such as NEEL, have quality assurance programs that provide adequate oversight of TRU waste characterization activities. P.10
EO-RS-5607 EXPLANATION OF CHANGES TO INEEL QPP U PLN-182 2.2.3.6 Revised last paragraph to clarify SQAO reporting requirements. 2.2.3.9/ 2.2.3.10 Inserted two new steps "2.2.3.9 and 2.2.3.10" and renumbered the remaining steps. 2.2.3.13 Changed "Director" to "Manager" on title. P.41 412.090 (02/16/2000 -Rev. #05) Plan Radioactive Waste Management Complex