Policy Replication

Ltr/EPA/F. Marcinowski to DOE/I. Triay, transmitting report for inspection no. EPA-INEEL-8.02-22 [A-98-49-II-A1-36]

Docket document2021-11-18 · EPA · correspondence · EPA-HQ-OAR-2004-0052-0063
RIN 2060-AJ90, RIN 2060-AG85 · Docket EPA-HQ-OAR-2004-0052

Other documents for the same rulemaking

Docket documentWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening of Public Comment Period
1996-11-15 Federal RegisterDecision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria
1997-10-30 Federal RegisterCriteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision
1998-05-18 Federal RegisterCriteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-05-21 Federal RegisterOpportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-06-24 Federal RegisterQuality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-03-25 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterChange in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant
1999-05-13 Federal RegisterInspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant
1999-05-17 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-10-18 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-12-08 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2000-04-14 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2000-08-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2000-11-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-04-05 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2001-07-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant
2002-02-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant
2002-03-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant
2002-05-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2002-08-14 Federal RegisterControl of Emissions From Spark-Ignition Marine Vessels and Highway Motorcycles
2002-09-09 Federal RegisterControl of Emissions from Spark-Ignition Marine Vessels and Highway Motorcycles; Correction
2002-10-30 Federal RegisterControl of Emissions From Spark Ignition Marine Vessels and Highway Motorcycles; Extension of Comment Period
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)
2004-01-15 Federal RegisterControl of Emissions From Highway Motorcycles
2005-08-29 Docket documentDraft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]
2005-11-03 Docket documentFinal Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]
2006-07-24 Docket documentTechnical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities
2006-07-24 Docket documentTechnical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review
2006-07-24 Docket documentTechnical Support Document for 194.27: Salado Flow Conceptual Models Peer Review
2006-07-24 Docket documentTechnical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment
2006-07-24 Docket documentTechnical Support Document for Section 194.27: Spallings Conceptual Model Peer Review
2006-07-24 Docket documentTechnical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review
2006-07-24 Docket documentTechnical Support Document for Section 194.14: Evaluation of Karst at the WIPP Site
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation
2006-07-25 Docket documentComparison of Effects of Brine Pocket Size
2006-07-25 Docket documentPlutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)
2006-07-25 Docket documentSensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)
2006-07-25 Docket documentSalado Flow Peer Review Plan
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report
2006-07-25 Docket documentII-G-22: Conceptual Models Third Supplementary Peer Review Report
2006-07-25 Docket documentII-G-12: Conceptual Models Supplementary Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report
2006-07-25 Docket documentSpallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow
2006-07-25 Docket documentWaste Isolation Pilot Plant: Conceptual Models Peer Review Report
2006-07-25 Docket documentQuality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]
2006-07-25 Docket documentEvaluation Of Risks And Waste Characterization Requirements For The Transuranic Waste Emplaced In WIPP During 1999 [DOE/AL58309-75] (EEG-75)
2006-07-25 Docket documentAnalysis of Emplaced Waste Data and Implications of Non-Random Emplacement for Performance Assessment for the WIPP [DOE/AL58309-85]-(EEG-85)
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models, Final Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Peer Review Plan

References: 9 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA or Agency) conducted an inspection from August 6-7, 2002 of the Idaho National Engineering and Environmental Laboratory (INEEL) quality assurance (QA) program for the Waste Isolation Pilot Plant (WIPP) to confirm continued compliance in accordance with § 194.8(a)(4). The investigation of the activities selected for the
research reportNot linked to a paper · refsec
QA Program complied with the requisite QA requirements for a TRU-waste generator site. Subsequent to the initial determination of compliance, the Agency conducted annual inspections to verify continued compliance. The inspection documented by this report was to confirm continued compliance in 2002, in accordance with § 194.8(a)(4). A summary of the history of inspections of INEEL's QA Program is listed in Table 1. At § 194.22(a)(1), EPA requires DOE to adhere to a QA Program that invokes the following QA standards: 1) ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990 Addenda, Part 2.7, to ASME
datasetNot linked to a paper · refsec
NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The Agency verified that DOE established these NQA standards in the Quality Assurance Program Document (QAPD) included in the Compliance Certification Application (CCA) for the WIPP. The QAPD is the documented QA Plan for the WIPP project, as a whole, to establish the NQA standards. The QAPD is maintained by the QA Organization of DOE's Carlsbad Field Office (CBFO), which has the authority to audit all other organizations associated with TRU-waste disposal at the WIPP to ensure that their lower-tier QA Programs establish and implement the applicable requirements of the QAPD. The DOE generator sites, which will characterize waste for disposal in the WIPP, must prepare site-specific QA Plans that establish the applicable NQA requirements. The EPA annually audits DOE's QA Program at CBFO (reference EPA Air Docket No. A-93-02, Document Nos. II-A-43 and IV-A-4, and EPA Air Docket No. A-98-49, Document No. II-A-1-4) and has found that DOE properly adheres to a QA Program that implements the NQA standards. The Agency determined in its WIPP Certification Decision (63 FR 27354, May 18, 1998) that the
research reportNot linked to a paper · refsec
CBFO QAPD is in conformance with the NQA standards and that the DOE's quality assurance organization can properly perform audit activities to internally check the QA Programs of the waste generator sites. The Agency's inspection conducted in concurrence with CBFO Audit A-02-27 was performed under the authority of §194.8(a)(4), which addresses recertification of generator site's QA Program. The Agency may either conduct its own audits or inspect audits conducted by DOE. The difference between an audit and an inspection lies in the role that EPA performs. During an audit, EPA assumes all responsibilities associated with assessing a QA Program, while in an inspection, the Agency also performs some oversight of DOE's quality assurance checks of a QA Program. The table below presents a summary of EPA inspections to-date of INEEL's QA Program. Table 1: Summary of EPA Ins pections of INEEL's QA Program Activity Date Purpose Inspection July 29-30, 1998 Inspection and independent assessment of initial CBFO Certification Audit A-98-31 of QA program for conformance with 40 CFR 194.22(a). Inspection May 18-20, 1999 Inspection of DOE Audit A-99-08 for maintenance of
datasetNot linked to a paper · refsec
WIPP support QA program; DOE issued 18 corrective action reports and, as a result, delayed recertification. Inspection July 27-28, 1999 Follow-up to Audit A-99-08; Inspection of DOE Audit A-99-23 to verify appropriateness and proper implementation of corrective actions for 8 of 18 corrective action reports resulting from Audit A-99-08; temporary authorization to ship waste. Inspection April 24-27, 2000 Inspection and independent assessment of initial CBFO Certification Audit A-00-06 of QA program for conformance with 40 CFR 194.22(a). Inspection May 1.7, 2000 Follow-up to Audit A-00-06; inspection of close-out of 3 corrective action reports. Surveillance May 1,2001 Conducted concurrently with DOE Surveillance S-01-06 to confirm maintenance of QA program in conformance with 40 CFR 194.22(a). Inspection July 30-August 2, 2001 Conducted concurrently with DOE Audit A-01-14 to confirm sufficiency of INEEL QA Organization in conformance with 40 CFR 194.22(a). Inspection August 6-7, 2002 Conducted concurrently with DOE Audit A-02-27 to confirm sufficiency of INEEL QA Organization in conformance with 40 CFR 194.22(a).
research reportNot linked to a paper · refsec
Characterization, Certification, and Transportation Quality Program Plan, PLN-182, Rev. 7, effective May 17, 2002.
research reportNot linked to a paper · refsec
4. DOE Idaho National Engineering and Environmental Laboratory. "Formal Root Cause Analsis: Incorrect TRUPACTII Payload Shipped, DR 27226, Occurrence Report ID-BBWIRWMS-2002-2003." RWMC-02-02. April 4, 2002
research reportNot linked to a paper · refsec
5. DOE Idaho National Engineering and Environmental Laboratory. Control of Deficiencies and Nonconforming Items, MCP-2993, Rev. 8, effective April 3,2001.
research reportNot linked to a paper · refsec
6. DOE Idaho National Engineering and Environmental Laboratory. Organization chart: 3,100 m3 Project Organization, February 2002.
research reportNot linked to a paper · refsec