Policy Replication

Memorandum: Estimated Cost for Beyond-the-floor Controls for Mercury Emissions from Primary Copper Smelting Facilities

Docket document2023-07-24 · EPA · correspondence · EPA-HQ-OAR-2020-0430-0152
RIN 2060-AU63 · Docket EPA-HQ-OAR-2020-0430

Other documents for the same rulemaking (all, by stage)

2022-01-11 Regulatory impact analysisMemorandum: Economic Impact Analysis for Proposed Residual Risk and Technology Review of the National Emission Standards for Hazardous Air Pollutants for Primary Copper Smelting Sources. September 3, 2021
2022-01-11 Federal RegisterNational Emission Standards for Hazardous Air Pollutants: Primary Copper Smelting Residual Risk and Technology Review and Primary Copper Smelting Area Source Technology Review
2022-01-11 Docket documentDocument submitted to initiate E.O. 12866 and 13563 review - Primary Copper Smelting RTR NPRM
2022-01-11 Docket documentDocument submitted to conclude E.O. 12866 and 13563 review - Primary Copper Smelting RTR NPRM
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (08/27/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/01/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/01/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/27/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/28/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (10/05/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (10/06/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (10/14/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (10/15/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (11/18/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (11/19/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/20/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/02/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/14/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/17/2021)
2022-01-11 Docket documentPart of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/20/2021)
2022-01-11 Docket documentMiami/Sulfur Dioxide (SO2) Nonattainment Area
2022-01-11 Docket documentRisk and Technology Review - Analysis of Demographic Factors For Populations Living Near Primary Copper Smelting Source Category Operations. June 9, 2021
2022-01-11 Docket documentMiami/PM-10 Nonattainment Area
2022-01-11 Docket documentRisk and Technology Review - Analysis of Demographic Factors For Populations Living Near Primary Copper Smelting Post-Control Source Category Operations. June 1, 2021
2022-01-11 Docket documentFreeport-McMoRan Miami, Inc. - Consent Order Docket No. A-10-18 Response to Items III.C and III.D
2022-01-11 Docket documentGuidelines for Carcinogen Risk Assessment
2022-01-11 Docket documentMining - Best Practices Plant-Wide Assessment Case Study
2022-01-11 Docket documentNew Technologies Emerging in Copper Mining
2022-01-11 Docket documentPrimary Copper Industry Review (Spreadsheet)
2022-01-11 Docket documentPM2.5 SIP Evaluation Report - Kennecott Utah Copper LLC - Molybdenum
2022-01-11 Docket documentRisk and Technology Review (RTR) Risk Assessment Methodologies: For Review by EPA's Science Advisory Board with Case Studies-MACT I Petroleum Refining Sources and Portland Cement Manufacturing
2022-01-11 Docket documentRegulatory Overview for Stakeholder Outreach For: Residual Risk and Technology Review for Primary Copper Smelting. May 11, 2021
2022-01-11 Docket documentRisk Assessment and Modeling-Human Exposure Model (HEM)
2022-01-11 Docket documentDose-Response Assessment for Accessing Health Risks Associated with Exposure to Hazardous Air Pollutants
2022-01-11 Docket documentASARCO LLC Hayden Converter Retrofit Project - An Update
2022-01-11 Docket documentGuidelines for Carcinogen Risk Assessment
2022-01-11 Docket documentMemorandum: MACT Floor Analysis for the Primary Copper Smelting Source Category. November 27, 2020
2022-01-11 Docket documentAir Toxics Risk Assessment Reference Library
2022-01-11 Docket documentTechnical Review and Evaluation of Application for Air Quality Control Permit Number 1000042 - ASARCO
2022-01-11 Docket documentHayden/Sulfur Dioxide (SO2) Nonattainment Area
2022-01-11 Docket documentResidual Risk Assessment for the Primary Copper Smelting Source Category in Support of the Risk and Technology Review 2021 Proposed Rule
2022-01-11 Docket documentMinimal Risk Levels (MRLs) for Hazardous Substances
2022-01-11 Docket documentDeveloping New Ways to Advance Copper Production
2022-01-11 Docket documentA Review of the Reference Dose and Reference Concentration Processes
2022-01-11 Docket documentDocumentation for Developing the Initial Source Category. Final Report.
2022-01-11 Docket documentDigital Government - Building a 21st Century Platform to Better Serve the American People
2022-01-11 Docket documentScreening Methodologies to Support Risk and Technology Reviews (RTR): A Case Study
2022-01-11 Docket documentIntegrated Risk Information System (IRIS) Glossary
2022-01-11 Docket documentEnhancing the Flotation Recovery of Copper Minerals in Smelter Slags from Namibia Prior to Disposal
2022-01-11 Docket documentOEHHA Acute, 8-Hour and Chronic Reference Exposure Level (REL) Summary
2022-01-11 Docket documentEfficient Recovery of Copper and Cobalt from the Matte-Slag Mixture of ISA Furnace by Injection of Coke and Pyrite
2022-01-11 Docket documentMethods for Derivation of Inhalation Reference Concentrations and Application of Inhalation Dosimetry
2022-01-11 Docket documentReduction of Copper Smelting Slag Using Waste Cooking Oil
2022-01-11 Docket documentClass I Air Quality Permit (66039) - Renewal: Freeport-McMoRan Miami, Inc.
2022-01-11 Docket documentClass I Air Quality Permit (39948) - Renewal: ASARCO LLC
2022-01-11 Docket documentImproving Our Regulations: Final Plan for Periodic Retrospective Reviews of Existing Regulations
2022-01-11 Docket documentTitle V Operating Permit: Kennecott Utah Copper LLC
2022-01-11 Docket documentSupporting Statement: NESHAP for Primary Copper Smelting (40 CFR Part 63, Subpart EEEEEE) (Proposed Amendments). December 2020
2022-01-11 Docket documentClass I Air Quality Permit (#66039) for Freeport-McMoRan Miami, Inc. (FMMI) Copper Smelter
2022-01-11 Docket documentSupporting Statement: NESHAP for Primary Copper Smelting (40 CFR Part 63, Subpart QQQ) (Proposed Amendments). December 2020

References

Page 1Download these results: CSV · JSON
GCT Evaluation from Freeport 125,898 See Attachments A, B, C, D of this memo 476,580 117,042 289,942 48,318 145,764 99,468 604,056 1,907,069 Estimated using 20-year payback period and 7.75% interest Control Cost Manual. Section 2, Chapter 1. https://www.epa.gov/sites/default/files/202007/documents/cs2ch1.pdf EPA (Chapter dated 1995) Attachment A Baghouse Costs Parameter Input Parameters:
research reportNot linked to a paper · refsec · cited link
GDP (1998) -- Inlet stream flowrate (acfm): -- Inlet stream temperature (°F): -- Dust type: -- Inlet dust loading (gr/ft3): -- Dust mass median diameter (microns): -- Filtration time (min): -- Dust specific resistance (in.H2O/fpm/lb/ft2): -- G/C ratio factors (shaker & reverse-air): A Gas:Cloth Ratio: B Fineness Factor: C Dust Load Factor: -- Fraction of bags cleaned (shaker & rev-air): -- Insulation required? ('yes'=1;'no'=0): -- Stainless steel required? ('yes'=1;'no'=0): -- Bag material: -- Fabric effective residual drag (in. H2O/fpm): Value Source/Reference 257,000 fPM including HAP metal from secondary converters 0.00091
government reportNot linked to a paper · refsec
PEC($)-base: ' ' -esc.: TCI ($): Annual Cost Inputs: Operating factor (hr/yr): Operating labor rate ($/hr): Maintenance labor rate ($/hr): Operating labor factor (hr/sh): Maintenance labor factor (hr/sh): Electricity price ($/kWhr): Compressed air ($/1000 scf): Dust disposal ($/ton): Annual interest rate (fraction): Control system life (years): 48187.5 Source/Reference Calculated using Inlet stream flowrate (ACFM) / Gas-to-cloth ratio (acfm/ft2 cloth area): Calculated using Gross/Net Area Ratio Value 1.1 * Net cloth area required (ft2) 10.472 Ferroalloy (EPA, 2015) 4602 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) 256,694 29,394 89,500 375,589 Ferroalloy (EPA, 2015) 443,195 830,403 1,801,975 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) 8640 $29.44 $29.44 Ferroalloy (EPA, 2015)
research reportNot linked to a paper · refsec
FRED, 2023 9 Ferroalloy (EPA, 2015) Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm].
datasetNot linked to a paper · refsec · cited link
FRED, 2023. Federal Reserve Economic Data (FRED). Bank Prime Loan Rate Changes: Historical Dates of Changes and Rates. https://fred.stlouisfed.org/series/PRIME, accessed 2/3/2023 Parameter Value Capital recovery factor: 0.099964731 Bag life (years): Capital recovery factor (bags): 0.558847774
datasetNot linked to a paper · refsec · cited link
Taxes, insurance, admin. factor: 0.04 Annual Costs ($/yr): Shaker Style Baghouse Oper. labor 63,590 Supv. labor 9,539 Maint. labor 31,795 Maint. matl. 31,795 Electricity 178,176 Compressed air Bag replacement 48,318 Dust disposal Overhead 82,032 Tax,ins.,adm 72,079 Cap. recov. 171,491 Total Annual Costs 689,032 Source/Reference Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Attachment B Ductwork Costs Input Parameters:
research reportNot linked to a paper · refsec
DUCTS: COST BASE DATE: GDP 1993 COST ESCALATION: GDP 2022 -- Inlet stream flowrate (acfm): -- Duct velocity (ft/min): Value 68.877 257,000 5,815 -- Duct length (ft): -- Material of construction: -- Insulation thickness (in.): (text input) 1000 Sheet-galv CS -- Duct design: -- Cost equation parameters: -- Cost equation form: -- Control system installation factor: Circular-longitudinal Ferroalloy (EPA, 2015) 2.03 0.784 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Freeport’s GCT analysis for Hg control system of similar size Freeport’s GCT analysis; p. 10 (if no system, enter '0') -- Fan-motor combined efficiency (fraction):
research reportNot linked to a paper · refsec
BEA, 2023 10 BEA, 2023 Freeport Test Data Back-calculated using pressure drop from GCT analysis Engineering judgement Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Operating factor (hours/year): Electricity price ($/kWhr): Annual interest rate (fractional): $172,322 $258,483
government reportNot linked to a paper · refsec
Taxes, insurance, admin. factor: 0.099964731 0.04 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Freeport ICR Data Ferroalloy (EPA, 2015)
research reportNot linked to a paper · refsec
FRED, 2023 11 Taken from: U.S. Bureau of Economic Analysis, Section 1, "Table 1.1.9. Implicit Price Deflators for Gross Domestic Product" (accessed Thursday, February 2, 2023). https://apps.bea.gov/iTable/?reqid=19&step=2&isuri=1&categories=surveyInteractive Data Application
datasetNot linked to a paper · refsec · cited link
FRED, 2023. Federal Reserve Economic Data (FRED). Bank Prime Loan Rate Changes: Historical Dates of Changes and Rates. https://fred.stlouisfed.org/series/PRIME, accessed 2/3/2023 Input Parameters:
datasetNot linked to a paper · refsec · cited link
BLS, 2023 12 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm]. Attachment C Lime Injection Parameters Annual Operating Hours, hr/yr (H) Exhaust Gas Flow Rate, acfm (Qa) Exhaust Gas Flow Rate, dscfm (Q) Operating Labor Rate, $/hr (LR) Lime Cost, $/lb Dust Disposal Cost, $/Ton Capital Recovery Factor (CRF)
government reportNot linked to a paper · refsec · cited link
GDP, 2022 GDP, 1991 Lime Adjustment Factor (AF) Lime Injection Rate (lb/MMacf)
research reportNot linked to a paper · refsec
Lime, lb/yr Total Capital Investment, $ (TCI) Direct Annual Cost, $/yr (DAC) Operating Labor Supervisory Labor Maintenance Lime Dust Disposal Indirect Annual Cost, $/yr (IAC) Overhead Property Tax, Insurance, & Admin Capital Recovery Total Annual Cost Value 8,760 308,000 257,000 $29.44 $0.12 $100.00 0.100 65.783 763,600 $213,118 Source/Reference Freeport ICR Data Freeport 2022 Test Data Freeport 2022 Test Data
research reportNot linked to a paper · refsec
BLS, 2023 13 Data from Freeport comment ($240/ton lime; converted to $/lb) Data from Freeport comment ($100/ton)
government reportNot linked to a paper · refsec
CRF calculated assuming 20-year equipment life and 7.75% interest (FRED, 2023) 14
datasetNot linked to a paper · refsec
BEA, 2023 15 BEA, 2023 Calculated control efficiency Calculated using algorithm 4,500 x (Q/1,976)0.6 x (1.2 retrofit factor) x CEPCI Adj. 16 $8,059 $1,209 $42,624 $91,632 $34,362.00 Calculated using (0.25 hr/8-hr shift) x H x LR Calculated using 0.15 x Operating Labor Calculated using 0.2 x TCI $31,135 $8,525 $21,304 $238,850 Calculated using 0.6 x (Labor + Maintenance) Calculated using 0.04 x TCI Calculated using CRF x TCI Sum of DAC + IAC Calculated using lime injection rate, 90% capture efficiency, and disposal cost Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm].
government reportNot linked to a paper · refsec · cited link
FRED, 2023. Federal Reserve Economic Data (FRED). Bank Prime Loan Rate Changes: Historical Dates of Changes and Rates. https://fred.stlouisfed.org/series/PRIME, accessed 2/3/2023 Taken from: U.S. Bureau of Economic Analysis, Section 1, "Table 1.1.9. Implicit Price Deflators for Gross Domestic Product" (accessed Thursday, February 2, 2023). https://apps.bea.gov/iTable/?reqid=19&step=2&isuri=1&categories=surveyInteractive Data Application https://www.regulations.gov/document/EPA-HQ-OAR-2002-0083-1095. Appendix E page E-3; pdf page 66 Attachment D Activated Carbon Injection Parameters Annual Operating Hours, hr/yr (H) Exhaust Gas Flow Rate, acfm (Qa) Exhaust Gas Flow Rate, dscfm (Q) Operating Labor Rate, $/hr (LR)
datasetNot linked to a paper · refsec · cited link
GDP, 2022 GDP, 2016 GDP, 1991 AC Adjustment Factor (AF)
research reportNot linked to a paper · refsec
AC Injection Rate (lb/MMacf) AC, lb/yr 105.74 65.783 323,770 Total Capital Investment, $ (TCI) $213,118 Direct Annual Cost, $/yr (DAC) Operating Labor Supervisory Labor Maintenance Activated Carbon Dust Disposal Indirect Annual Cost, $/yr (IAC) Overhead Property Tax, Insurance, & Admin Capital Recovery Total Annual Cost Source/Reference Freeport ICR Data Freeport 2022 Test Data Freeport 2022 Test Data
research reportNot linked to a paper · refsec
CRF calculated assuming 20-year equipment life and 7.75% interest (FRED, 2023) 19
datasetNot linked to a paper · refsec
BEA, 2023 20 BEA, 2023 BEA, 2023 Calculated control efficiency Calculated using algorithm 4,500 x (Q/1,976)0.6 x (1.2 retrofit factor) x CEPCI Adj. 21 $8,059 $1,209 $42,624 $292,091 $58,279 Calculated using (0.25 hr/8-hr shift) x H x LR Calculated using 0.15 x Operating Labor Calculated using 0.2 x TCI $31,135 $8,525 $21,304 $463,225 Calculated using 0.6 x (Labor + Maintenance) Calculated using 0.04 x TCI Calculated using CRF x TCI Sum of DAC + IAC Calculated using lime injection rate, 90% capture efficiency, and disposal cost Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm]. Cost from EPA Integrated Performance Model (IPM). Sargent & Lundy, IPM Model – Updates to Cost and Performance for APC Technologies, Mercury Control Cost Development Methodology, January 2017. $1700/ton (2016 dollars) https://www.epa.gov/system/files/documents/2021-09/attachment_56_hg_control_cost_development_methodology.pdf
government reportNot linked to a paper · refsec · cited link