GCT Evaluation from Freeport 125,898 See Attachments A, B, C, D of this memo 476,580 117,042 289,942 48,318 145,764 99,468 604,056 1,907,069 Estimated using 20-year payback period and 7.75% interest Control Cost Manual. Section 2, Chapter 1. https://www.epa.gov/sites/default/files/202007/documents/cs2ch1.pdf EPA (Chapter dated 1995) Attachment A Baghouse Costs Parameter Input Parameters:
GDP (1998) -- Inlet stream flowrate (acfm): -- Inlet stream temperature (°F): -- Dust type: -- Inlet dust loading (gr/ft3): -- Dust mass median diameter (microns): -- Filtration time (min): -- Dust specific resistance (in.H2O/fpm/lb/ft2): -- G/C ratio factors (shaker & reverse-air): A Gas:Cloth Ratio: B Fineness Factor: C Dust Load Factor: -- Fraction of bags cleaned (shaker & rev-air): -- Insulation required? ('yes'=1;'no'=0): -- Stainless steel required? ('yes'=1;'no'=0): -- Bag material: -- Fabric effective residual drag (in. H2O/fpm): Value Source/Reference 257,000 fPM including HAP metal from secondary converters 0.00091
PEC($)-base: ' ' -esc.: TCI ($): Annual Cost Inputs: Operating factor (hr/yr): Operating labor rate ($/hr): Maintenance labor rate ($/hr): Operating labor factor (hr/sh): Maintenance labor factor (hr/sh): Electricity price ($/kWhr): Compressed air ($/1000 scf): Dust disposal ($/ton): Annual interest rate (fraction): Control system life (years): 48187.5 Source/Reference Calculated using Inlet stream flowrate (ACFM) / Gas-to-cloth ratio (acfm/ft2 cloth area): Calculated using Gross/Net Area Ratio Value 1.1 * Net cloth area required (ft2) 10.472 Ferroalloy (EPA, 2015) 4602 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) 256,694 29,394 89,500 375,589 Ferroalloy (EPA, 2015) 443,195 830,403 1,801,975 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) 8640 $29.44 $29.44 Ferroalloy (EPA, 2015)
FRED, 2023 9 Ferroalloy (EPA, 2015) Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm].
FRED, 2023. Federal Reserve Economic Data (FRED). Bank Prime Loan Rate Changes: Historical Dates of Changes and Rates. https://fred.stlouisfed.org/series/PRIME, accessed 2/3/2023 Parameter Value Capital recovery factor: 0.099964731 Bag life (years): Capital recovery factor (bags): 0.558847774
Taxes, insurance, admin. factor: 0.04 Annual Costs ($/yr): Shaker Style Baghouse Oper. labor 63,590 Supv. labor 9,539 Maint. labor 31,795 Maint. matl. 31,795 Electricity 178,176 Compressed air Bag replacement 48,318 Dust disposal Overhead 82,032 Tax,ins.,adm 72,079 Cap. recov. 171,491 Total Annual Costs 689,032 Source/Reference Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Attachment B Ductwork Costs Input Parameters:
DUCTS: COST BASE DATE: GDP 1993 COST ESCALATION: GDP 2022 -- Inlet stream flowrate (acfm): -- Duct velocity (ft/min): Value 68.877 257,000 5,815 -- Duct length (ft): -- Material of construction: -- Insulation thickness (in.): (text input) 1000 Sheet-galv CS -- Duct design: -- Cost equation parameters: -- Cost equation form: -- Control system installation factor: Circular-longitudinal Ferroalloy (EPA, 2015) 2.03 0.784 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Freeport’s GCT analysis for Hg control system of similar size Freeport’s GCT analysis; p. 10 (if no system, enter '0') -- Fan-motor combined efficiency (fraction):
BEA, 2023 10 BEA, 2023 Freeport Test Data Back-calculated using pressure drop from GCT analysis Engineering judgement Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Operating factor (hours/year): Electricity price ($/kWhr): Annual interest rate (fractional): $172,322 $258,483
Taxes, insurance, admin. factor: 0.099964731 0.04 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Freeport ICR Data Ferroalloy (EPA, 2015)
FRED, 2023 11 Taken from: U.S. Bureau of Economic Analysis, Section 1, "Table 1.1.9. Implicit Price Deflators for Gross Domestic Product" (accessed Thursday, February 2, 2023). https://apps.bea.gov/iTable/?reqid=19&step=2&isuri=1&categories=surveyInteractive Data Application
FRED, 2023. Federal Reserve Economic Data (FRED). Bank Prime Loan Rate Changes: Historical Dates of Changes and Rates. https://fred.stlouisfed.org/series/PRIME, accessed 2/3/2023 Input Parameters:
BLS, 2023 12 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm]. Attachment C Lime Injection Parameters Annual Operating Hours, hr/yr (H) Exhaust Gas Flow Rate, acfm (Qa) Exhaust Gas Flow Rate, dscfm (Q) Operating Labor Rate, $/hr (LR) Lime Cost, $/lb Dust Disposal Cost, $/Ton Capital Recovery Factor (CRF)
GDP, 2022 GDP, 1991 Lime Adjustment Factor (AF) Lime Injection Rate (lb/MMacf)
Lime, lb/yr Total Capital Investment, $ (TCI) Direct Annual Cost, $/yr (DAC) Operating Labor Supervisory Labor Maintenance Lime Dust Disposal Indirect Annual Cost, $/yr (IAC) Overhead Property Tax, Insurance, & Admin Capital Recovery Total Annual Cost Value 8,760 308,000 257,000 $29.44 $0.12 $100.00 0.100 65.783 763,600 $213,118 Source/Reference Freeport ICR Data Freeport 2022 Test Data Freeport 2022 Test Data
BLS, 2023 13 Data from Freeport comment ($240/ton lime; converted to $/lb) Data from Freeport comment ($100/ton)
CRF calculated assuming 20-year equipment life and 7.75% interest (FRED, 2023) 14
BEA, 2023 15 BEA, 2023 Calculated control efficiency Calculated using algorithm 4,500 x (Q/1,976)0.6 x (1.2 retrofit factor) x CEPCI Adj. 16 $8,059 $1,209 $42,624 $91,632 $34,362.00 Calculated using (0.25 hr/8-hr shift) x H x LR Calculated using 0.15 x Operating Labor Calculated using 0.2 x TCI $31,135 $8,525 $21,304 $238,850 Calculated using 0.6 x (Labor + Maintenance) Calculated using 0.04 x TCI Calculated using CRF x TCI Sum of DAC + IAC Calculated using lime injection rate, 90% capture efficiency, and disposal cost Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm].
FRED, 2023. Federal Reserve Economic Data (FRED). Bank Prime Loan Rate Changes: Historical Dates of Changes and Rates. https://fred.stlouisfed.org/series/PRIME, accessed 2/3/2023 Taken from: U.S. Bureau of Economic Analysis, Section 1, "Table 1.1.9. Implicit Price Deflators for Gross Domestic Product" (accessed Thursday, February 2, 2023). https://apps.bea.gov/iTable/?reqid=19&step=2&isuri=1&categories=surveyInteractive Data Application https://www.regulations.gov/document/EPA-HQ-OAR-2002-0083-1095. Appendix E page E-3; pdf page 66 Attachment D Activated Carbon Injection Parameters Annual Operating Hours, hr/yr (H) Exhaust Gas Flow Rate, acfm (Qa) Exhaust Gas Flow Rate, dscfm (Q) Operating Labor Rate, $/hr (LR)
GDP, 2022 GDP, 2016 GDP, 1991 AC Adjustment Factor (AF)
AC Injection Rate (lb/MMacf) AC, lb/yr 105.74 65.783 323,770 Total Capital Investment, $ (TCI) $213,118 Direct Annual Cost, $/yr (DAC) Operating Labor Supervisory Labor Maintenance Activated Carbon Dust Disposal Indirect Annual Cost, $/yr (IAC) Overhead Property Tax, Insurance, & Admin Capital Recovery Total Annual Cost Source/Reference Freeport ICR Data Freeport 2022 Test Data Freeport 2022 Test Data
CRF calculated assuming 20-year equipment life and 7.75% interest (FRED, 2023) 19
BEA, 2023 20 BEA, 2023 BEA, 2023 Calculated control efficiency Calculated using algorithm 4,500 x (Q/1,976)0.6 x (1.2 retrofit factor) x CEPCI Adj. 21 $8,059 $1,209 $42,624 $292,091 $58,279 Calculated using (0.25 hr/8-hr shift) x H x LR Calculated using 0.15 x Operating Labor Calculated using 0.2 x TCI $31,135 $8,525 $21,304 $463,225 Calculated using 0.6 x (Labor + Maintenance) Calculated using 0.04 x TCI Calculated using CRF x TCI Sum of DAC + IAC Calculated using lime injection rate, 90% capture efficiency, and disposal cost Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm]. Cost from EPA Integrated Performance Model (IPM). Sargent & Lundy, IPM Model – Updates to Cost and Performance for APC Technologies, Mercury Control Cost Development Methodology, January 2017. $1700/ton (2016 dollars) https://www.epa.gov/system/files/documents/2021-09/attachment_56_hg_control_cost_development_methodology.pdf