Revised GD Annual Form and Instructions
Original sourcePDF at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at source
Other documents for the same rulemaking (all, by stage)
References: 109 extracted, 0 linked to papers
ORNL/TM-2017/66 (April 2017). Bert Kalisch, American Public Gas Association. Comments of the American Public Gas Association. Docket No. OST-2017-0069 (November 21, 2017). Christina Sames, et al. Comments of the American Gas Association, the American Petroleum Institute, and the Interstate Natural Gas Association of America. Docket No.
OST-2017-0069 (November 9, 2017). Christina Sames and Sonal Patni, American Gas Association. Petition for Reconsideration for the Plastic Pipe Rule. Docket No. PHMSA-2014-0098 (August 23, 2019).
DRAFT EA: Pipeline Safety: Gas Pipeline Regulatory Reform National Transportation Safety Board, “Safety Through Reliable Fusion Joints,” SA-047, https://www.ntsb.gov/safety/safety-alerts/Documents/SA_047.pdf. June 2015. Notification of Regulatory Review. 82 FR 45750 (October 2, 2017). Docket No. DOT–
OST–2017–0069. Paul Korman, et al, Interstate Natural Gas Association of America. Motion to Stay Final Rule. Docket No PHMSA-2010-0026 (September 4, 2015). Pipeline and Hazardous Materials Safety Administration (PHMSA). Pipeline Safety: Gas Pipeline Regulatory Reform, Notice of Proposed Rulemaking. (June 2020). Docket No.
PHMSA-2014-0098. Terry Boss, Interstate Natural Gas Association of America. Petition for Reconsideration of ‘Pipeline Safety: Miscellaneous Changes to Pipeline Safety Regulations,’ Docket No.
PHMSA-2010-0026. (April 10, 2015). https://www.regulations.gov/document?D=PHMSA-2010-0026-0057. Transportation Infrastructure: Notice of Review of Policy, Guidance, and Regulation. 82
FR 26734 (June 8, 2017). Docket No. DOT-OST-0057. U.S. EPA Greenhouse Gas Emissions. Understanding Global Warming Potentials. https://www.epa.gov/ghgemissions/understanding-global-warming-potentials. Accessed
Dec. 2019. ORNL/TM-2017/66 ASME Boiler and Pressure Vessel Code Evaluation and Equivalence Study for Liquefied Natural Gas Facilities Barry Oland Mark Lower Simon Rose April 2017 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.
ORNL/TM-2017/66 Energy and Transportation Science Division
ASME Boiler and Pressure Vessel Code Evaluation and Equivalence Study for Liquefied Natural Gas Facilities Barry Oland Mark Lower Simon Rose Date Published: April 2017
IBR approved for §192.7(c)(6) ASME Boiler & Pressure Vessel Code, Section I: “Rules for Construction of Power Boilers 2007,” 2007 edition, July 1, 2007, (ASME BPVC, Section I) §192.153(b) §192.7(c)(7)
ASME Boiler & Pressure Vessel Code, Section VIII, Division 1: “Rules for Construction of Pressure Vessels,” 2007 edition, July 1, 2007, (ASME BPVC, Section VIII, Division 1) §§192.153(a), (b), (d); and 192.165(b) §192.7(c)(8)
ASME Boiler & Pressure Vessel Code, Section VIII, Division 2: “Alternate Rules, Rules for Construction of Pressure Vessels,” 2007 edition, July 1, 2007, (ASME BPVC, Section VIII, Division 2) §§192.153(b), (d); and 192.165(b) §192.7(c)(9)
Procedures, Welders, Brazers, and Welding and Brazing Operations,” 2007 edition, July 1, 2007, (ASME BPVC, Section IX) §§192.225(a); 192.227(a); and Item II, Appendix B to Part 192 Table 1.4 ASME BPVC and NFPA references incorporated in 49 CFR Part 193 49 CFR Paragraph Reference
IBR approved for §193.2013(e)(1) ASME Boiler & Pressure Vessel Code, Section VIII, Division 1: “Rules for Construction of Pressure Vessels,” 2007 edition, July 1, 2007, (ASME BPVC, Section VIII, Division 1) § 193.2321(a) (See Note 1) §193.2013(g)(1)
NFPA 59A (2006), “Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG),” 2006 edition, approved August 18, 2005, (NFPA–59A–2006) [NFPA–59A (2006) incorporates by reference the ASME
BPVC, 2004 Edition. See Note 3.] §§ 193.2101(b) and 193.2321(b) Notes: 1. Butt welds in metal shells of storage tanks with internal design pressure above 15 psig must be nondestructively examined in accordance with rules specified in Section VIII, Division 1 of the ASME BPVC (incorporated by reference, see §193.2013) except that 100 percent of welds that are both longitudinal (or meridional) and circumferential (or latitudinal) of hydraulic load bearing shells with curved surfaces that are subject to cryogenic temperatures must be nondestructively examined in accordance with rules specified in Section VIII, Division 1 of the ASME BPVC. 2. Chapter 12 of NFPA 59A-2001 lists documents or portions thereof that are referenced within this standard as mandatory requirements and shall be considered part of the requirements of this standard. This list includes the 1992 edition of the ASME BPVC, including Addenda and applicable Code Interpretation Cases. Chapter 2 of NFPA 59A-2006 lists documents or portions thereof that are referenced within this standard as mandatory requirements and shall be considered part of the requirements of this standard. This list includes the 2004 edition of the ASME BPVC. Table 1.5 ASME BPVC and API references incorporated in 49 CFR Part 195 49 CFR Paragraph Reference
IBR approved for §195.3(b)(16) API Standard 510, ‘‘Pressure Vessel Inspection Code: InService Inspection, Rating, Repair, and Alteration,’’ 9th edition, June 2006, (API Std 510) §195.205(b) and 195.432(c) §195.3(c)(5)
ASME Boiler & Pressure Vessel Code, Section VIII, Division 1: “Rules for Construction of Pressure Vessels,” 2007 edition, July 1, 2007, (ASME BPVC, Section VIII, Division 1) §§195.124 and 195.307(e) §195.3(c)(6)
ASME Boiler & Pressure Vessel Code, Section VIII, Division 2: “Alternate Rules, Rules for Construction of Pressure Vessels,” 2007 edition, July 1, 2007, (ASME BPVC, Section VIII, Division 2) §195.307(e) §195.3(c)(7)
Procedures, Welders, Brazers, and Welding and Brazing Operations,” 2007 edition, July 1, 2007, (ASME BPVC, Section IX) §195.222(a) Most standards-developing organizations update and revise their codes and standards on a regular schedule. Therefore, conformance with PHMSA regulations may involve satisfying requirements specified in a code or standard that is either obsolete or no longer applicable. In order to enforce any edition of a code or standard including the IBR edition, PHMSA must first publish a notice of proposed rulemaking in the Federal Register. To permanently address this potential non-compliance issue, PHMSA must make revisions to applicable Federal pipeline safety regulations in Parts 190 to 199 through the established rulemaking process defined in 49 CFR Part 190, Subpart D – Procedures for Adoption of Rules. When the PHMSA regulations do not keep up with the latest IBR editions, a pipeline operator can submit a special permit application to PHMSA in accordance with requirements specified in §190.341 to request a waiver from compliance with these parts of the Federal pipeline safety regulations. Special permit applications must contain the information described in §190.341(c) including the following.
BPVC: “These charts were established in order to facilitate a conservative approach in determining external pressure ratings for components covering a wide range of geometries, materials, and conditions. The methods provide for a uniform basis of calculation for the referencing Section; the use of the charts eliminates the need for complex calculations by equations and incorporates realistic factors of safety for components of widely varying length-to-diameter and diameter-tothickness ratios.” 4.1.2 Excessive Plastic Deformation In addition, Section I, Paragraph PG-29.9 in the 1992 and 2015 editions of the ASME BPVC state that: “Unstayed dished heads with the pressure on the convex side must have a maximum allowable working pressure equal to 60% of that for heads of the same dimensions with the pressure on the concave side.” The plastic deformation mode of failure (ductile rupture) is controlled by imposing limits on calculated stress. Primary stress limits and primary plus secondary stress limits in the ASME
Therefore, no fracture toughness requirements are specified in either the 1992 or the 2015 edition of Section I of the ASME BPVC. Boiler and pressure vessel materials that are in service above a certain temperature undergo continuing deformation (creep) at a rate that is strongly influenced by both stress and temperature. The temperature at which creep occurs varies with the alloy composition. In order to prevent excessive deformation and possible premature rupture it is necessary to limit the allowable stresses by additional criteria on creep-rate and stress-rupture. Empirical limits for creep-rate and stress-rupture have been established and are specified in Section I of the ASME BPVC. Allowable stresses specified in the 1992 and 2015 editions of
BPVC are generally not subjected to cyclic loading. Therefore, no plastic instability and incremental collapse requirements associated with ratcheting are specified in either the 1992 or the 2015 edition of Section I of the ASME BPVC. Fatigue is the weakening of a material caused by repeatedly applied loads. It is the progressive and localized material degradation that occurs when a component is subjected to cyclic loading. If the loads are above a certain threshold, microscopic cracks will begin to form at stress concentrations such as square holes or sharp corners. Eventually the crack will reach a critical size, propagate, and
ASME BPVC are different from those in Paragraph PG-22 – Loadings in the 2015 edition. Paragraph PG-22.1 in the 1992 edition states: “Additional stresses imposed by effects other than working pressure or static head which increase the average stress by more than 10% of the allowable working stress must also be taken into account.” This requirement in Paragraph PG-22.1 in the 1992 edition is less conservative than the corresponding requirement in Paragraph PG-22.1 in the 2015 edition which states: “Stresses due to hydrostatic head shall be taken into account in determining the minimum thickness required unless noted otherwise. This Section does not fully address additional loadings other than those from working pressure or static head. Consideration shall be given to such additional loadings.” This requirement ensures that post-construction loads such as those associated with in-service pressure tests that may be imposed by PHMSA regulations or by the Authority Having Jurisdiction are included in the design basis. Criteria for establishing allowable stress values for use in performing calculations in accordance with rules specified in Section I of the ASME BPVC are discussed in Mandatory Appendix 1 of
Section II, Part D in the 2015 edition and in Appendix 1 of Section II, Part D in the 1992 edition. According to these criteria, the maximum allowable stress in the 1992 edition of Section II, Part D is either two‐thirds of the room temperature yield strength or the ultimate tensile strength divided by 4.0, whichever is less. Correspondingly, the maximum allowable stress in the 2015 edition of
Section II, Part D is either two‐thirds of the room temperature yield strength or the ultimate tensile strength divided by 3.5, whichever is less. For allowable stress values specified in the 1992 edition of Section II, Part D, the two‐thirds of the yield strength value controls the design when the ultimate tensile strength of the material is greater than 2.67 (e.g. 2/3 × 4.0) times the yield strength.
Instead, design-by-rule generally involves calculation of average membrane stress across the thickness of the walls of the component. As discussed in Sect. 4.5.1 of this report, rules in the 1992 and 2015 editions of Section I are based on the maximum stress theory. edition provides equivalent safety to the design-by-rule approach in the 1992 edition Rules for openings and reinforcements in the 1992 and 2015 editions of Section I of the ASME
ASME BPVC. Rules for brazing are specified in Part QB in the 1992 and 2015 editions of Section
QB, Article XIII in the 1992 and 2015 editions of Section IX of the ASME BPVC. Rules for plastic fusing performance qualification are only specified in Part QF, Article XXIII in the 2015 edition of Section IX of the ASME BPVC. Performance qualification rules in the 2015 edition provide equivalent safety to performance qualification rules in the 1992 edition because they both require a written performance qualification record. 5.3.7 Performance Qualification Record The performance qualification record documents what occurred during the production of a test coupon by a person using one or more joining processes following an organization’s procedure specification. Rules for welding performance qualification record are specified in Paragraph QW301.4 in the 1992 and 2015 editions of Section IX of the ASME BPVC. Rules for brazing performance qualification record are specified in Paragraph QB-301.4 in the 1992 and 2015 editions of Section IX of the ASME BPVC. Rules for plastic fusing performance qualification record are only specified in Paragraph QF-301.4 in the 2015 edition of Section IX of the ASME Procedure qualification
BPVC. rules in the 1992 edition. Performance qualification record rules in the 2015 edition provide equivalent safety to performance qualification record rules in the 1992 edition because they both require documentation of what occurred during the production of a test coupon by a person using one or more joining processes following an organization’s procedure specification. Performance qualification records are designed in the 2015 edition of Section IX of the ASME BPVC as follows. 5.3.8 Welding,
However, the 2015 edition of Section I specifies additional quality control system requirements that are not specified in the 1992 edition of Section I of the ASME BPVC. Rules for circumferential and longitudinal butt welded joints in boilers fabricated by welding that require volumetric examination are specified in Paragraph PW-11 in the 1992 and 2015 editions of Section I of the ASME BPVC. These rules state that all circumferential and longitudinal butt
PW-51.3.2 in both editions define the conditions under which indications shown on the radiographs of welds and characterized as imperfections are unacceptable and must be repaired and the repair radiographed. 6.2.1.2 Ultrasonic Examination Requirements in Section I Rules for ultrasonic examination of welds are provided in Paragraph PW-52 in the 1992 and 2015 editions of Section I of the ASME BPVC. These rules state that techniques and standards for ultrasonic examination must follow rules specified in Article 5, Section V in the 1992 edition or Article 4, Mandatory Appendix VII, Section V in the 2015 edition of the ASME BPVC, as applicable. 6.2.1.3 Visual and Liquid Penetrant Examination Requirements in Section I 6.2.4.1 Volumetric Examination Acceptance Standards Fabrication rules for bimetallic tubes when the clad strength is included are specified in Paragraph
PW-44.8.1 in the 2015 edition of Section I of the ASME BPVC. These rules state: “Visual examination (VT) shall be performed on 100% of the clad surface in accordance with Section V, Article 9. Any indication open to the surface shall additionally be subjected to liquid penetrant examination (PT) in accordance with A-270 and acceptance or rejection based on A-270.4. The portion of bimetallic tubing containing rejectable defects shall either be removed or the defects repaired in accordance with PW-44.9.” Visual and liquid penetrant examinations must comply with Article 9 and Article 6, respectively, in the 2015 edition of Section V of the ASME BPVC. Corresponding rules for fabrication of bimetallic tubes when the clad strength is included are not provided in the 1992 edition of Section I of the ASME BPVC. Acceptance standards for volumetric examination are specified in Section I, Section VIII, Division 1, and Section VIII, Division 2 of the ASME BPVC. These standards identify the following types of indications that are considered rejectable imperfections and must be removed. any indication characterized as a crack or zone of incomplete fusion or penetration elongated indications greater than a specified length which is a function of the weld
BPVC to provide material quality factors. The acceptance criteria are either contained within the referenced Paragraphs or provided in referenced appendices. A comparison of liquid penetrant examination and magnetic particle examination acceptance standards is presented in Table 6.2 of this report. The comparison shows no difference in liquid penetrant and magnetic particle indications acceptance standards. However, editorial changes have been made and metric equivalents are included in the 2015 editions of Section I, Section VIII, Division 1, and Section VIII, Division 2 of the ASME BPVC. These changes are either not safety significant or result in equivalent safety. According to rules specified in the 1992 edition of the ASME BPVC for qualification of radiographic and ultrasonic NDE personnel, each person must be qualified and certified in accordance with their employer’s written practice. Standard SNT TC 1A, which is published by the American Society for Nondestructive Testing, must be used as a guideline for employers to establish their written practice for qualifications and certification of personnel. Provisions for training, experience, qualification, and certification of NDE personnel must be described in the manufacturer's Quality Control System. (Note: Earlier editions of SNT-TC-1A allowed NDE Level III inspectors to be qualified based on experience without having to pass an examination [2].
However, in 1992, the requirements were tightened to require these inspectors to be qualified by examination.) Paragraphs PW-51.5 and PW-52.4 in the 1992 edition of Section I of the ASME
BPVC further state: “When personnel have been certified according to their employer’s written practice based upon an edition of SNT TC 1A earlier than that referenced in A 361, their certification shall be valid for performing nondestructive examination required by this Section until Equivalent Safety Determination acceptance standard in the 1992 edition. Surface examination acceptance standards in
NDE personnel shall be qualified by examination. Qualification of NDE Level III personnel certified prior to the 2004 Edition of Section I may be based on demonstrated ability, achievement, education, and experience. Such qualification shall be specifically addressed in the written practice. When NDE personnel have been certified in accordance with a written practice based on an edition of SNT‐TC‐1A or
CP‐189 earlier than that referenced in A-360, their certification shall be valid until their next scheduled recertification. Recertification shall be in accordance with the employer’s written practice based on the edition of SNT‐TC‐1A or CP‐189 referenced in A-360. Recertification may be based on evidence of continued satisfactory performance or by reexamination(s) deemed necessary by the employer. Rules for certification of competency for NDE personnel are specified in the 1992 edition of the
MT personnel in the 2015 edition provide equivalent safety to certification of competency for PT and
MT personnel in the Table 9.1 Evaluation of equivalent safety – ASME BPVC Section 1, 1992 edition and 2015 edition Reference section of
MAWP while the boiler is carefully examined. The 1992 and 2015 editions of Section I of the ASME BPVC do not include pneumatic pressure testing requirements. 7.1.1.2 Basis for Pneumatic Pressure Testing Limits Alternative Pressure Testing The 1992 and 2015 editions of Section I of the ASME BPVC do not include alternative pressure testing requirements. 7.3.1 Proof Testing Paragraph PG-18 in the 1992 and 2015 editions of Section I of the ASME BPVC states that where no rules are given for calculating the strength of a boiler or any part thereof, the Manufacturer may establish MAWP by testing a full‐size sample in accordance with one of the following three test methods. Strain Measurement Test Displacement Measurement Test Burst Test An equivalent safety evaluation of pneumatic pressure testing requirements in the 1992 and 2015 editions is not possible. An equivalent safety evaluation of alternative pressure testing requirements in
ASME BPVC are the same. Therefore, the rules for overpressure protection specified in the 2015 edition of Section I of the ASME BPVC provide an equivalent level of safety compared to the rules for overpressure protection specified in the 1992 edition of Section I of the ASME BPVC. 8.1.2 Overpressure Protection by System Design Section I of the ASME BPVC does not provide rules for overpressure protection by system design. Equivalent Safety Determination The overpressure protection requirements by pressure relief device in the 2015 edition provide equivalent safety to the overpressure protection requirements by pressure relief device in the 1992 edition An equivalent safety evaluation of overpressure protection by system design in the 1992 and 2015 editions is not possible. Table 9.2 Evaluation of equivalent safety – ASME BPVC Section VIII, Division 1, 1992 edition and 2015 edition Reference section of this report 4.1.1.2 4.1.2 4.1.3.2 Rule or Requirement Equivalency Safety Evaluation and Rationale for Rules and Requirements Specified in the 1992 and 2015 Editions of Section VIII, Division 1 of the ASME BPVC Equivalent Safety Determination Excessive Elastic
Instead, rules in the 1992 and 2015 editions of Section VIII, Division 1 of the ASME BPVC provide equations for minimum wall thickness based on the maximum stress theory discussed in Sect. 4.5.1 of this report. Consequently, no rules for fatigue are specified in either the 1992 or the 2015 edition of Section VIII, Division 1 of the ASME BPVC. Two common types of corrosion that can adversely affect the integrity of a boiler or pressure vessel include stress corrosion cracking and corrosion fatigue. Stress corrosion cracking (SCC) is the Stress corrosion cracking and corrosion Table 9.2 Evaluation of equivalent safety – ASME BPVC Section VIII, Division 1, 1992 edition and 2015 edition
BPVC is referred to as design-by-rule. This design-by-rule approach is not based on detailed stress analysis. Instead, design-by-rule generally involves calculation of average membrane stress across the thickness of the walls of the pressure vessel or component. As discussed in Sect. 4.5.1 of this report, rules in the 1992 and 2015 editions of Section VIII, Division 1 of the ASME BPVC are based on the maximum stress theory. Rules for openings and reinforcements in the 1992 and 2015 editions of Section VIII, Division 1 of the ASME BPVC are based on the area replacement concept in which the metal cut out by an Equivalent Safety Determination edition. Allowable stress rules 2015 edition provide equivalent safety to allowable stress rules 1992 edition. The design-by-rule approach in the 2015 editions provides equivalent safety to the design-by-rule approach in the 1992 editions. Table 9.2 Evaluation of equivalent safety – ASME BPVC Section VIII, Division 1, 1992 edition and 2015 edition
Part QB, Article XIII in the 1992 and 2015 editions of Section IX of the ASME BPVC. Rules for plastic fusing performance qualification are only specified in Part QF, Article XXIII in the 2015 edition of Section IX of the ASME BPVC. Performance qualification rules in the 2015 edition provide equivalent safety to performance qualification rules in the 1992 edition because they both require a written performance qualification record. 5.3.7 Performance Qualification Record The performance qualification record documents what occurred during the production of a test coupon by a person using one or more joining processes following an organization’s procedure specification. Rules for welding performance qualification record are specified in Paragraph
QW-301.4 in the 1992 and 2015 editions of Section IX of the ASME BPVC. Rules for brazing performance qualification record are specified in Paragraph QB-301.4 in the 1992 and 2015 editions of Section IX of the ASME BPVC. Rules for plastic fusing performance qualification record are only specified in Paragraph QF-301.4 in the 2015 edition of Section IX of the ASME
BPVC. Equivalent Safety Determination rules for fusing are not specified in the 1992 edition. Procedure specification record rules in the 2015 edition provide equivalent safety to procedure specification record rules in the 1992 edition. Procedure qualification record rules for fusing are not specified in the 1992 edition. Performance qualification rules in the 2015 edition provide equivalent safety to performance qualification rules in the 1992 edition. Performance qualification rules for fusing are not specified in the 1992 edition. Performance qualification record rules in the 2015 edition provide equivalent safety to performance qualification record rules in the 1992 Table 9.2 Evaluation of equivalent safety – ASME BPVC Section VIII, Division 1, 1992 edition and 2015 edition Reference section of this report Rule or Requirement Equivalency Safety Evaluation and Rationale for Rules and Requirements Specified in the
UNF-56 in the 1992 and 2015 editions. However, postweld heat treatment requirements in the 2015 edition of Section VIII, Division 1 of the ASME BPVC are more comprehensive that corresponding rules in the 1992 edition of Section VIII, Division 1 of the ASME BPVC. treatment rules in the 2015 edition provide equivalent safety to postweld heat treatment rules in the 1992 edition. Postweld heat treatment temperatures for carbon and alloy alloys steels are specified in Table UCS-56 in the 1992 edition and in Tables UCS-56-1 through UCS-56-11 in the 2015 edition. Postweld heat treatment temperatures for ferritic steels with properties enhanced by heat treatment are specified in Table UHT-56 in the 1992 and 2015 editions. Postweld heat treatment temperatures for high alloy steels are specified in Table UHA-32 in the 1992 edition and in Tables UHA-32-1 through UHA-32-7 in the 2015 edition. Postweld heat treatment temperatures specified in these tables are applicable to specific P-Number materials. 5.6.2 Cold Stretching Quality Control System Although postweld heat treatment of nonferrous materials is not normally necessary nor desirable, postweld heat treatment requirements for specified nonferrous materials are covered in Paragraph
UNF 56 in the 1992 and 2015 editions. The 1992 edition of Section VIII, Division 1 of the ASME BPVC does not include cold stretching requirements. Cold stretching is a pressure vessel construction method that was incorporated into the ASME BPVC through approval of Code Case 2596 on January 29, 2008. Mandatory Appendix 44 in the 2015 edition specifies requirements for design, construct, and stamping of cold-stretched austenitic stainless steel pressure vessels in addition to those provided in Section VIII, Division 1. However, rules in Paragraph 44-4 restrict design and fabrication of coldstretched pressure vessels to specific types of the austenitic stainless steels that conform to