Policy Replication

Revised GD Annual Form and Instructions

Docket document2020-06-05 · PHMSA · report · PHMSA-2018-0046-0006
RIN 2137-AF36 · Docket PHMSA-2018-0046

Other documents for the same rulemaking (all, by stage)

2020-06-05 Regulatory impact analysisPRIA for Gas Regulatory Reform NPRM
2020-06-05 Docket documentEnvironmental Assessment for Gas Regulatory Reform NPRM
2020-06-05 Docket documentOak Ridge National Laboratories ASME BPVC report ORNL/TM-2017/66
2020-06-05 Docket documentRevised GD Annual Form and Instructions - PHMSA F 7100.1-1 (rev 10-2018)
2020-06-05 Docket documentRevised GD Incident Form and Instructions PHMSA F7100.1
2020-06-05 Docket documentGas Piping Technology Committee - Petition
2020-06-05 Docket documentAGA Petition to Reconsider Final Part 192 281 and Part192 285 (002)
2020-06-09 Federal RegisterPipeline Safety: Gas Pipeline Regulatory Reform
2020-06-09 Docket documentPipeline Comments on DOT Notice of Regulatory Reform
2020-08-18 Docket documentComment from Arkansas Independent Producers and Royalty Owners (AIPRO)
2020-09-16 Docket documentInterstate Natural Gas Association of America - Petition or Reconsideration on Pressure Vessels 2020.9.14
2020-12-07 Docket documentSummary of Meeting with PST
2020-12-21 Docket documentFarm Taps Enforcement Discretion
2020-12-21 Docket document2015 Stay of Enforcement Letter regarding Pressure Vessels
2020-12-22 Docket documentGranted Waiver -State of SDPUC for NorthWestern Energy Grant (1)
2020-12-23 Docket documentGas Reg Reform NPRM OMB Redline
2021-01-11 Federal RegisterPipeline Safety: Gas Pipeline Regulatory Reform
2021-01-14 Regulatory impact analysisFinal Rule RIA
2021-01-14 Docket documentFinal Rule OMB Comparison Document
2021-01-14 Docket documentFinal EA
2021-01-14 Docket documentGD Annual Report Form and Instructions-PHMSA F7100.1-1
2021-01-14 Docket documentGD Incident Form and Instructions PHMSA F7100.1
2021-01-14 Docket documentPHMSA Data Analysis of 2015 Mechanical Fitting Failures
2021-01-15 Docket document2137-AF36 Final Rule OMB Comparison Document
2021-02-12 Docket documentPetition for Reconsideration and Request
2021-03-05 Federal RegisterPipeline Safety: Gas Pipeline Regulatory Reform
2021-03-05 Federal RegisterPipeline Safety: Gas Pipeline Regulatory Reform; Correction
2021-03-13 Docket document2-11-21- Meeting with PST
2021-05-21 Docket documentU.S. DOT/PHMSA - Response to Petition for Reconsideration from Pipeline Safety Trust
2021-06-07 Docket documentPipeline Safety Trust: Response to Petition for Reconsideration

References: 109 extracted, 0 linked to papers

Page 2Download these results: CSV · JSON
SA-240/SA-240M material specification requirements. The ASME BPVC requires any Manufacturer or Assembler holding or applying for a Certificate of Authorization to use the Certification Mark to have, and demonstrate, a quality control system to establish that all Code requirements, including material, design, fabrication, examination (by the Manufacturer), inspection of boilers, pressure vessels, and associated parts (by the Authorized Inspector), pressure testing, and certification will be met. The Authorized Inspector is responsible for verifying that the Manufacturer has a valid Certificate of Authorization and is working to a quality control system. An equivalent safety evaluation of cold stretching requirements in the 1992 and 2015 editions is not possible. Quality control system
research reportNot linked to a paper · refsec
UW-11(f) –welds made by the inertia and continuous drive friction welding process Butt joints that must be subjected to radiographic examination over their full length are identified in Paragraph UW-11(a). However, Paragraph UW-11(a)(7) in the 1992 edition and Paragraph
research reportNot linked to a paper · refsec
UW-11(a)(8) in the in the 2015 edition states that ultrasonic examination may be substituted for radiography for the final closure seam of a pressure vessel if the construction of the pressure vessel does not permit interpretable radiographs in accordance with Code requirements. Butt joints subjected to full radiography are permitted to have higher joint design efficiencies compared to butt
research reportNot linked to a paper · refsec
However, in 1992, the requirements were tightened to require these inspectors to be qualified by examination.) Rules for qualification of radiographic and ultrasonic NDE personnel are stated in the following text from Paragraph PW-50 in the 2015 edition of Section I of the ASME BPVC. The Manufacturer shall be responsible for assuring that nondestructive examination (NDE) personnel have been qualified and certified in accordance with their employer’s written practice prior to performing or evaluating radiographic or ultrasonic examinations required by this Section. SNT‐TC‐1A or CP‐189 shall be used as a guideline for employers to establish their written practice. National or international Central Certification Programs, such as the ASNT Central Certification Program (ACCP), may be used to fulfill the examination and demonstration Equivalent Safety Determination Surface examination acceptance standards in the 2015 edition provide equivalent safety to surface examination acceptance standard in the 1992
research reportNot linked to a paper · refsec
CP‐189 earlier than that referenced in A-360, their certification shall be valid until their next scheduled recertification. 6.2.5.3 and 6.2.5.4 Certification Competency Requirements for PT and MT Personnel Recertification shall be in accordance with the employer’s written practice based on the edition of SNT‐TC‐1A or CP‐189 referenced in A-360. Recertification may be based on evidence of continued satisfactory performance or by reexamination(s) deemed necessary by the employer. Rules for certification of competency for NDE personnel are specified in the 1992 edition of the
research reportNot linked to a paper · refsec
ASME BPVC. These rules state that the manufacturer must certify that each liquid penetrant and magnetic particle examiner meet the following requirements. (a) He has vision, with correction if necessary, to enable him to read a Jaeger Type No. 2 Standard Chart at a distance of not less than 12 in. (300 mm), and is capable of distinguishing and differentiating contrast between colors used. These requirements shall be checked annually. (b) He is competent in the techniques of the liquid penetrant examination method for which he is certified, including making the examination and interpreting and evaluating the results, except that, where the examination method consists of more than one operation, he may be certified as being qualified only for one or more of these operations. Rules for certification of competency for NDE personnel are specified in the 2015 edition of the
research reportNot linked to a paper · refsec
ASME BPVC. Rules in Nonmandatory Appendix A, Paragraphs A-260.2 and A-270.2 in the 2015 edition of Section I of the ASME BPVC state that the Manufacturer must certify that each magnetic particle and liquid penetrant examiner meets the following requirements: (a) The examiner has vision, with correction if necessary, to enable him to read a Jaeger Type No. 2 Standard Chart at a distance of not less than 12 in. (300 mm) and is capable of distinguishing and differentiating contrast between colors used. These Certification of competency for PT and
research reportNot linked to a paper · refsec
MT personnel in the 1992 edition. Table 9.2 Evaluation of equivalent safety – ASME BPVC Section VIII, Division 1, 1992 edition and 2015 edition Reference
datasetNot linked to a paper · refsec
BPVC, are not included in Article 5 in the 1992 edition of Section V of the ASME BPVC. Article 6 in the 1992 and 2015 editions of Section V of the ASME BPVC states that the liquid penetrant examination techniques described in this Article must be used together with Article 1 when specified by the referencing Construction Code. It also provides details to be considered in the procedures used for liquid penetrant examinations. Additional requirements for the control of contaminant content for all liquid penetrant materials used on nickel base alloys, austenitic stainless steels, and titanium are specified in Article 6, Mandatory Appendix II in the 2015 edition of Section V of the ASME BPVC. This requirement is not included in the 1992 edition of Section V of the ASME BPVC. Article 7 – Magnetic Particle Examination in the 1992 and 2015 editions of Section V of the
research reportNot linked to a paper · refsec
ASME BPVC states that the magnetic particle examination techniques described in this Article must be used together with Article 1 when specified by the referencing Construction Code. It also Liquid penetrant examination requirements in Section V in the 2015 edition provide equivalent safety to liquid penetrant
research reportNot linked to a paper · refsec
ASME BPVC. A summary of these limits follows. 1992 – minimum hydrostatic test pressure – 1.5 MAWP 1992 – If the pressure vessel is subjected to visible permanent distortion, the Inspector shall reserve the right to reject the vessel. 2015 – minimum hydrostatic test pressure – 1.3 MAWP 2015 – If the pressure vessel is subjected to visible permanent distortion, the Inspector shall reserve the right to reject the vessel. It is important to note that hydrostatic test pressure rules specified in Paragraph UG-99(b) in the 1992 and 2015 editions of Section VIII, Division 1 of the ASME BPVC allow the primary membrane stress to exceed the plastic collapse stress limit when MAWP is based on an allowable primary membrane stress, Pm, equal to 0.67 Sy and the hydrostatic test pressure is greater than 1.5 MAWP. This hydrostatic pressure test condition violates the principles of limit design theory. Equivalent Safety Determination Section V in the 2015 edition provide equivalent safety to magnetic particle examination requirements in Section V in the 1992 edition. Visual examination requirements in Section V in the 2015 edition provide equivalent safety to visual examination
research reportNot linked to a paper · refsec
ASME BPVC state that when a pressure vessel can be exposed to fire or other unexpected sources of external heat, the pressure relief device(s) must be capable of preventing the pressure from rising more than 21% above the MAWP. (i.e., 1.21 MAWP). This overpressure protection limit ensures that the primary membrane stress, Pm, does not exceed 0.81 Sy (i.e., 1.21/1.50). A minimum hydrostatic test pressure equal to 1.3 MAWP ensures that the pressure vessel will never experience a maximum overpressure while in Equivalent Safety Determination Table 9.2 Evaluation of equivalent safety – ASME BPVC Section VIII, Division 1, 1992 edition and 2015 edition Reference section of this report Rule or Requirement Equivalency Safety Evaluation and Rationale for Rules and Requirements Specified in the 1992 and 2015 Editions of Section VIII, Division 1 of the ASME BPVC Equivalent Safety Determination service that is greater than the hydrostatic test pressure. (i.e., 1.3 MAWP > 1.21 MAWP) 7.1.2.2 Basis for Pneumatic
datasetNot linked to a paper · refsec
BPVC provide an equivalent level of safety compared to the rules for overpressure protection specified in the 1992 edition of Section VIII, Division 1 of the ASME BPVC. The 1992 edition of Section VIII, Division 1 of the ASME BPVC does not provide rules for overpressure protection by system design. However, Paragraph UG-125(a) states: “All pressure vessels within the Scope of this Division, irrespective of size or pressure, shall be provided with protective devices in accordance with the requirements of U-125 through UG-136.” requirements by pressure relief device in the 1992 edition Rules specified in Paragraph UG-140 in the 2015 edition of Section VIII, Division 1 of the ASME
research reportNot linked to a paper · refsec
AM-211.1. This table presents the minimum Charpy V-notch impact test requirements for carbon and low alloy steels based on the specified minimum tensile strength and to what extent the steel is deoxidized. The minimum specified Charpy V-notch impact energy limits listed in the table range up to 20 ft-lb. The minimum specified lateral expansion value listed in the table is 0.015 in. Material toughness requirements in the 2015 edition of Section VIII, Division 2 are provided in Part 3. According to these rules, Charpy V-notch impact tests must be made for materials used for shells, heads, nozzles, and other pressure containing parts, as well as for the structural members essential to structural integrity of the vessel, unless exempted by the rules of Paragraph 3.11. Separate requirements for five specific material groups are provided in Paragraph 3.11. Minimum Charpy V-notch impact energy and lateral expansion requirements vary over a range from 20 to 61 ft-lb and 0.012 to 0.032 in. depending on material type, thickness, and yield strength. Equivalent Safety Determination Requirements in the 2015 edition for protection against brittle fracture provide equivalent or greater safety compared to requirements in the 1992 edition for protection against brittle fracture. Table 9.3 Evaluation of equivalent safety – ASME BPVC Section VIII, Division 2, 1992 edition and 2015 edition Reference section of this report
datasetNot linked to a paper · refsec
BPVC to evaluate ratcheting in accordance with rules specified in Part 5, Paragraph 5.5.6 is the same as the method provided in the 1992 edition of Section VIII, Division 2 of the ASME
research reportNot linked to a paper · refsec
BPVC [2]. Fatigue is the weakening of a material caused by repeatedly applied loads. It is the progressive and localized material degradation that occurs when a component is subjected to cyclic loading. If the loads are above a certain threshold, microscopic cracks will begin to form at stress concentrations such as square holes or sharp corners. Eventually the crack will reach a critical size, propagate, and cause the component to fracture. Avoidance of discontinuities that increase local stresses will increase the fatigue life of a component subjected to cyclic loading. Rules specified in Article D-1, Paragraph AD-160 in the 1992 edition of Section VIII, Division 2 of the ASME BPVC establish criteria for determining when a fatigue analysis is required. When a fatigue analysis is required, design rules specified in Appendix 5 – Mandatory Design Based on Fatigue Analysis apply. Rules specified in the 1992 edition of Section VIII, Division 2 of the
research reportNot linked to a paper · refsec
UDS meets the requirements in Paragraph 2.2.2, and must apply the Professional Engineer seal in accordance with the required procedures. In addition, the Registered Professional Engineer(s) must prepare a statement to be affixed to the document attesting to compliance with the applicable requirements of the Code. Criteria for establishing allowable stresses for use in performing calculations in accordance with rules specified in Section VIII, Division 2 of the ASME BPVC are discussed in Mandatory Appendix 10 of Section II, Part D in the 2015 edition and in Appendix 2 of Section II, Part D in the 1992 edition. These allowable stress values, which are provided in Tables 2A and 2 B in the 1992 edition of Section II, Part D and Tables 5A and 5 B in the 2015 edition of Section II, Part D, are subdivided into materials below room temperature and materials at room temperature and above. According to these criteria, the maximum allowable stress in the 1992 and 2015 editions of
research reportNot linked to a paper · refsec
Section II, Part D is two‐thirds of the room temperature yield strength, 2/3 Sy. Unlike Section VIII, Division 1 of the ASME BPVC, there are no rules in Section VIII, Division 2 of the ASME BPVC specifically for pressure vessels constructed using materials having a higher allowable stresses at low temperature. Allowable stress rules in the 2015 edition provide equivalent safety to allowable stress rules in the 1992 edition. Table 9.3 Evaluation of equivalent safety – ASME BPVC Section VIII, Division 2, 1992 edition and 2015 edition Reference section of this report Rule or Requirement Equivalency Safety Evaluation and Rationale for Rules and Requirements Specified in the 1992 and 2015 Editions of Section VIII, Division 2 of the ASME BPVC Equivalent Safety Determination For allowable stresses specified in the 1992 edition of Section II, Part D of the ASME BPVC, the yield strength controls the design of pressure vessels that are designed and fabricated in accordance with rules specified in the 1992 edition of Section VIII, Division 2 of the ASME BPVC when the ultimate tensile strength is greater than 2.0 (e.g. 2/3 × 3.0) times the yield strength. In comparison, the yield strength controls the design of boilers and pressure vessels that are designed and fabricated in accordance with rules specified in the 2015 edition of Section VIII, Division 2 of the
datasetNot linked to a paper · refsec
SPS = max [3S, 2Sy] However, SPS shall be limited to 3S if either 4.8.2 Plastic Collapse Stress Limits (a) the room temperature ratio of the minimum specified yield strength from Annex 3-D to the ultimate tensile strength from Annex 3-D exceeds 0.70; or, (b) the allowable stress from Annex 3-A is governed by time-dependent properties. Plastic collapse is the load at which overall structural instability occurs. The collapse load is the maximum load limit for a component made of elastic perfectly plastic material. Deformations of these components increase without bound at the collapse load. Basic stress intensity limits for pressure vessels designed and fabricated in accordance with requirements in the 1992 edition of Section VIII, Division 2 of the ASME BPVC are specified in Paragraph 4-130. These stress intensity limits are consistent with the design criteria specified in Paragraph AD 140(b) in the 1992 edition of Section VIII, Division 2 of the ASME BPVC and discussed in Sect. 4.4.2 of this report. According to text in Paragraphs 4-136(b): “The limits on local membrane stress intensity and primary membrane plus primary bending stress intensity of 1.5 Sm have been placed at a level which conservatively assures the prevention of collapse as determined by the principles of limit analysis.” Guidance for application of plastic analysis in the 1992 edition of Section VIII, Division 2 of the
research reportNot linked to a paper · refsec
ASME BPVC is presented in Appendix 4, Paragraph 4-136. The guidance covers: Plastic Analysis – Paragraphs 4-136.2 and 4-136.5. Plastic analysis is that method which computes the structural behavior under given loads considering the plasticity characteristics of the material including strain hardening and the stress redistribution occurring in the structure. Limit Analysis – Paragraph 4-136.3. Limit analysis is a special case of plastic analysis in which the material is assumed to be ideally plastic (non-strain-hardening). Experimental Analysis – Paragraphs 4-136.4. Experimental stress analysis is required when the critical or governing stresses in parts in which theoretical stress analysis is inadequate or for which design values are unavailable. Rule for experimental stress analysis including Plastic collapse stress limit rules in the 2015 edition provide equivalent safety to plastic collapse stress limit rules in the 1992 edition Table 9.3 Evaluation of equivalent safety – ASME BPVC Section VIII, Division 2, 1992 edition and 2015 edition Reference section of this report Rule or Requirement
datasetNot linked to a paper · refsec
AD-201 through AD-206.” Rules specified in Part AD, Paragraph AD-140(a) further state that the theory of failure used in this Division is the maximum shear stress theory except in the case of some specifically designated configurations, shapes, or design rules included as a part of this Division. Basic requirements for application of design-by-rule methods specified in the 2015 edition of Section VIII, Division 2 of the ASME BPVC are described in Part 4 – Design by Rule
research reportNot linked to a paper · refsec
ASME BPVC are based on a limit analysis using the distortion energy theory (also known as the octahedral shear theory and the von Mises criterion) discussed in Sect. 4.5.3 of this report. Detailed design procedures utilizing the results from a stress analysis are provided in Part 5 to evaluate components for plastic collapse, local failure, buckling, and cyclic loading. Supplemental requirements are provided for the analysis of bolts, perforated plates and layered vessels. Procedures are also provided for design using the results from an experimental stress analysis and for fracture mechanics evaluations. The design-by-analysis requirements in Part 5 in the 2015 edition of Section VIII, Division 2 of the
research reportNot linked to a paper · refsec
BPVC. According to rules specified in Part 4, Paragraph 4.3.2.3, shells that do not meet the tolerance requirements of Paragraph 4.3.2 may be evaluated using rules for evaluation of vessels outside of tolerance specified in Paragraph 4.1.4. Corresponding rules for evaluation of pressure vessels outside of tolerance are not provided in the 1992 edition of Section VIII, Division 2 of the
research reportNot linked to a paper · refsec
ASME BPVC. Rules for alignment tolerances for edges to be butt welded are specified in Paragraph AF-142 in the 1992 edition of Section VIII, Division 2 of the ASME BPVC. Table AF-142.1 defines the maximum allowable offset in welded joints. Corresponding rules for alignment tolerances for edges to be butt welded are specified in Part 6, Paragraph 6.1.6 in the 2015 edition of Section VIII, Formed head tolerances in the 2015 edition provide equivalent
research reportNot linked to a paper · refsec
IX of the ASME BPVC. Rules for plastic fusing are only specified in Part QF in the 2015 edition of Section IX of the ASME BPVC. All of the welding and brazing methods permitted in the 1992 edition are also permitted in the 2015 edition. However, Diffusion Welding (DFW) and Friction Stir Welding (FSW) are also permitted in the 2015 edition. 5.3.3 Procedure Qualification Record The PQR documents what occurred during the production of a test coupon by a person using one or more joining processes following an organization’s procedure specification. As a minimum, the record must document the essential variables for each process used to produce the test coupon, the ranges of variables qualified, and the results of the required testing and nondestructive examinations. 5.3.4 Procedure A procedure specification is a written document that provides direction to the person applying the P-Numbers in the 2015 edition provide equivalent safety to P-Numbers in the 1992 edition. Welding and brazing methods in the 2015 edition provide equivalent safety to welding and brazing methods in the 1992
research reportNot linked to a paper · refsec
QB, Article XIII in the 1992 and 2015 editions of Section IX of the ASME BPVC. Rules for plastic fusing performance qualification are only specified in Part QF, Article XXIII in the 2015 edition of Section IX of the ASME BPVC. Performance qualification rules in the 2015 edition provide equivalent safety to performance qualification rules in the 1992 edition because they both require a written performance qualification record. Procedure specification rules for fusing are not specified in the 1992 edition. Procedure specification record rules in the 2015 edition provide equivalent safety to procedure specification
research reportNot linked to a paper · refsec
BPVC. Performance qualification record rules in the 2015 edition provide equivalent safety to performance qualification record rules in the 1992 edition because they both require documentation of what occurred during the production of a test coupon by a person using one or more joining processes following an organization’s procedure specification. Performance qualification records are designed in the 2015 edition of Section IX of the ASME BPVC as follows. 5.3.8 5.4.1 Welding,
research reportNot linked to a paper · refsec
Welding, brazing, and fusing data articles include the variables grouped into categories such as joints, base materials and filler materials, positions, preheat/postweld heat treatment, gas, electrical characteristics, and technique. They are referenced from other articles as they apply to each process. Welding data include essential, supplementary essential or nonessential variables. Brazing data include essential and nonessential variables. Fusing data include the fusing variables grouped as joints, pipe material, position, thermal conditions, equipment, and technique. Equivalent Safety Determination Performance qualification record rules in the 2015 edition provide equivalent safety to performance qualification record rules in the 1992 edition. Performance qualification record rules for fusing are not specified in the 1992 edition. Welding and brazing, data rules in the 2015 edition provide equivalent safety to
research reportNot linked to a paper · refsec
BPVC does not require any distribution of this information, except for the Authorized Inspector or an ASME designee. Quality control system requirements in the 2015 edition of Section VIII, Division 2 include the same quality control system requirements as those in the 1992 edition of Section VIII, Division 2 of the ASME BPVC. However, the 2015 edition of Section VIII, Division 2 specifies additional quality control system requirements that are not specified in the 1992 edition of Section VIII, Division 2 of the ASME BPVC. Examination requirements specified in the 1992 edition of Section VIII, Division 2 of the ASME
research reportNot linked to a paper · refsec
BPVC for welded joints are significantly different from corresponding rules in the 2015 edition of Section VIII, Division 2. A comparison of weld joint examination requirements specified in the 1992 and 2015 editions is presented in Table 6.1 of this report. 6.2.3 General NDE Requirements Section VIII, Division 2 6.2.3.1 Radiographic Examination Requirements Section VIII, Division 2 Rules for radiographic examination of joints in pressure vessels fabricated by welding in accordance with requirements specified in the 1992 edition of Section VIII, Division 2 of the
datasetNot linked to a paper · refsec
ASME BPVC are provided in Article I-5, Paragraph AI-500. Corresponding rules for radiographic examination of joints in pressure vessels fabricated by welding in accordance with requirements specified in the 2015 edition of Section VIII, Division 2 of the ASME BPVC are provided in Part 7, Paragraph 7.5.3. According to these rules, all welded joints subjected to radiographic examination must be examined in accordance with requirements specified in the applicable edition of Section V, Article 2 of the ASME BPVC. 6.2.3.2 Ultrasonic Examination Requirements Section VIII, Division 2 Rules for ultrasonic examination of joints in pressure vessels fabricated by welding in accordance with requirements specified in the 1992 edition of Section VIII, Division 2 of the ASME BPVC are provided in Article 9-3, Paragraph 9-300(b). According to these rules, all welded joints subjected to ultrasonic examination must be examined in accordance with requirements specified in Section V, Article 5 in the 1992 edition of the ASME BPVC. Corresponding rules for ultrasonic examination of joints in pressure vessels fabricated by welding in accordance with requirements specified in the 2015 edition of Section VIII, Division 2 of the
research reportNot linked to a paper · refsec
Section V, Article 4 in the 2015 edition of the ASME BPVC. General NDE requirements in the 2015 edition provide equivalent safety to general NDE requirements in the 1992 edition. Radiographic examination requirements in the 2015 edition provide equivalent safety to radiographic examination requirements in the 1992 edition. Ultrasonic examination requirements in the 2015 edition provide equivalent safety to ultrasonic examination requirements in the 1992 edition. Table 9.3 Evaluation of equivalent safety – ASME BPVC Section VIII, Division 2, 1992 edition and 2015 edition Reference section of this report 6.2.3.3 6.2.3.4 6.2.3.5 6.2.4.1 Rule or Requirement Equivalency Safety Evaluation and Rationale for Rules and Requirements Specified in the 1992 and 2015 Editions of Section VIII, Division 2 of the ASME BPVC Equivalent Safety Determination Liquid Penetrant Examination Requirements Section VIII, Division 2 Rules for liquid penetrant examination of welded joints in pressure vessels fabricated by welding in accordance with requirements specified in the 1992 edition of Section VIII, Division 2 of the
datasetNot linked to a paper · refsec
ASME BPVC are provided in Article 9-2, Paragraph 9-200(b). According to these rules, all welded joints subjected to liquid penetrant examination must be examined in accordance with requirements specified in Section V, Article 6 in the 1992 edition of the ASME BPVC. Liquid penetrant examination requirements in the 2015 edition provide equivalent safety to liquid penetrant examination requirements in the 1992 edition. Magnetic
research reportNot linked to a paper · refsec
ASME BPVC. 6.2.4.2 6.2.5.1 and 6.2.5.2 Surface Examination Acceptance Standards Certification Requirement for RT and UT Personnel A comparison of radiographic examination and ultrasonic examination acceptance standards is shown in Table 6.2 of this report. The comparison shows no difference in radiographic and ultrasonic indications acceptance standards. However, editorial changes have been made and metric equivalents are included in the 2015 editions of Section I, Section VIII, Division 1, and Section VIII, Division 2 of the ASME BPVC. These changes are either not safety significant or result in equivalent safety. Liquid penetrant (PT) and magnetic particle (MT) inspections are surface examination techniques used to detect cracks or other discontinuities on material surfaces. The examination methods are typically used in Section I, Section VIII, Division 1, and Section VIII, Division 2 of the ASME
datasetNot linked to a paper · refsec
BPVC to provide material quality factors. The acceptance criteria are either contained within the referenced Paragraphs or provided in referenced appendices. A comparison of liquid penetrant examination and magnetic particle examination acceptance standards is presented in Table 6.2 of this report. The comparison shows no difference in liquid penetrant and magnetic particle indications acceptance standards. However, editorial changes have been made and metric equivalents are included in the 2015 editions of Section I, Section VIII, Division 1, and Section VIII, Division 2 of the ASME BPVC. These changes are either not safety significant or result in equivalent safety. According to rules specified in the 1992 edition of the ASME BPVC for qualification of radiographic and ultrasonic NDE personnel, each person must be qualified and certified in accordance with their employer’s written practice. Standard SNT TC 1A, which is published by the American Society for Nondestructive Testing, must be used as a guideline for employers to establish their written practice for qualifications and certification of personnel. Provisions for training, experience, qualification, and certification of NDE personnel must be described in the manufacturer's Quality Control System. (Note: Earlier editions of SNT-TC-1A allowed NDE Surface examination acceptance standards in
datasetNot linked to a paper · refsec
However, in 1992, the requirements were tightened to require these inspectors to be qualified by examination.)
research reportNot linked to a paper · refsec
UT personnel in the 1992 edition. Rules for qualification of radiographic and ultrasonic NDE personnel are stated in the following text from Paragraph PW-50 in the 2015 edition of Section I of the ASME BPVC. The Manufacturer shall be responsible for assuring that nondestructive examination (NDE) personnel have been qualified and certified in accordance with their employer’s written practice prior to performing or evaluating radiographic or ultrasonic examinations required by this Section. SNT‐TC‐1A or CP‐189 shall be used as a guideline for employers to establish their written practice. National or international Central Certification Programs, such as the ASNT Central Certification Program (ACCP), may be used to fulfill the examination and demonstration requirements of the employer’s written practice. Provisions for training, experience, qualification, and certification of NDE personnel shall be described in the Manufacturer’s quality control system.
research reportNot linked to a paper · refsec
MT personnel in the 2015 edition provide equivalent safety to certification of competency for PT and Table 9.3 Evaluation of equivalent safety – ASME BPVC Section VIII, Division 2, 1992 edition and 2015 edition Reference
datasetNot linked to a paper · refsec
BPVC, are not included in Article 5 in the 1992 edition of Section V of the ASME BPVC. Article 6 in the 1992 and 2015 editions of Section V of the ASME BPVC states that the liquid penetrant examination techniques described in this Article must be used together with Article 1 when specified by the referencing Construction Code. It also provides details to be considered in the procedures used for liquid penetrant examinations. Additional requirements for the control of contaminant content for all liquid penetrant materials used on nickel base alloys, austenitic stainless steels, and titanium are specified in Article 6, Mandatory Appendix II in the 2015 edition of Section V of the ASME BPVC. This requirement is not included in the 1992 edition of Section V of the ASME BPVC. 6.3.5 Magnetic Particle Examination Requirements in Section V Article 7 – Magnetic Particle Examination in the 1992 and 2015 editions of Section V of the
research reportNot linked to a paper · refsec
ASME BPVC states that the magnetic particle examination techniques described in this Article must be used together with Article 1 when specified by the referencing Construction Code. It also provides details to be considered in the procedures used for magnetic particle examinations. 6.3.6 Visual Examination Requirements in Section V Article 9 – Visual Examination in the 1992 and 2015 editions of Section V of the ASME BPVC states that methods and requirements for visual examination in this Article are applicable together with requirements of Article 1 when specified by a referencing Construction Code. Specific visual examination procedures required for every type of examination are not included in this Article because there are many applications where visual examinations are required. Some examples of these applications include nondestructive examinations, leak testing, in-service examinations, and fabrication procedures. Equivalent Safety Determination Liquid penetrant examination requirements in Section V in the 2015 edition provide equivalent safety to liquid penetrant examination requirements in Section V in the 1992 edition. Magnetic particle
research reportNot linked to a paper · refsec
BPVC, Section VIII, Division 1, Paragraph UG-140 are satisfied. Equivalent Safety Determination overpressure protection by system design in the 1992 and 2015 editions is not possible.
research reportNot linked to a paper · refsec
RE: April 30, 2015 Equivalency Letter for Elba Liquefaction Project.
research reportNot linked to a paper · refsec
PTB-1-2014, American Society of Mechanical Engineers, New York, NY, 2014. American Petroleum Institute (API), 2011, Damage Mechanisms Affecting Fixed Equipment in the Refining Industry, API RP 571, Second Edition, American Petroleum Institute, Washington, DC.
research reportNot linked to a paper · refsec
ASME Boiler and Pressure Vessel Code, WRC Bulletin 435, Welding Research Council, September 1998.
research reportNot linked to a paper · refsec
API 579-1/ASME FFS-1, Fitness-for-Service, American Petroleum Institute and American Society of Mechanical Engineers, American Petroleum Institute, Washington, DC, June, 2016.
research reportNot linked to a paper · refsec
Equipment, WRC Bulletin 447, Welding Research Council, December 1999.
research reportNot linked to a paper · refsec
Rodabaugh, E. C., A Review of Area Replacement Rules for Pipe Connections in Pressure Vessels and Piping, WRC Bulletin 335, The Welding Research Council, Inc., New York, N.Y., August 1988.
journal articleNot linked to a paper · refsec
MacKay, J.R. and Pillow, J.T., Power Boilers – A Guide to Section I of the ASME Boiler and Pressure Vessel Code – Second Edition, ASME Pres, New York, 2011. Jinyang Zheng, Abin Guo, Cunjian Miao, Ping Xu, Jian Yang, Jianjun Ye, Li Ma, Linlin Wu, Guoyi Yang, Cold Stretching of Cryogenic Pressure Vessels From Austenitic Stainless Steels,
research reportNot linked to a paper · refsec
ASME Pressure Vessels and Piping Conference, Baltimore, Maryland, PVP2011-57331, 2011.
research reportNot linked to a paper · refsec
[10] ASME CA-1-2014, Conformity Assessment Requirements, American Society of Mechanical
research reportNot linked to a paper · refsec
← PreviousNext →