USGS 4339-1, 1972, P,"X iii. study looked at minimum depth to salt, p. 45, USGS 4339-6, 1973,\2H iv. Los Medanos suitable - thick seams of salt at moderate depths, p. 34,
USGS 4339-7, 1973 , £,£ v. feature of interest of Mescalero Plains - minimum depth to salt ranges from 200 to 1,500 ft., p. 20, USGS 74-190, 1974 , "S^ vi. p. 4, ORNL Program Plan for BSPP 1973 ,3>\ vii. site selection - determine suitability on local level in terms of probable volume of host rock at usable depths, p. 13,; site evaluation determine depth of host and associated units, p. 14, ESTP, USGS and DOE, 1979 , T > - ^ 2. Minimum Depth: i. Large scale site selection criteria: depth to suitable salt of at least 1,000 ft, p. 2:10, GCR, 1978, T M O ii. 300m, p. 2, Canada AECL 1976> E~X iii. 500 ft, p. 5-7, USGS 4339-5, 1973 , £>"2> iv. Los Medanos promising because depth to Salado varies from 750 to no more than 1,500 ft, p. 34-35, USGS 4339-7, 1973, TSS v. site selection criteria - 500 ft, p. 21, AEC Lyons ES 1971,Ut vi. large scale site selection criteria - 1,000 ft, p. 12, SS WIPP, Sandia 1977 vii. 200 to 300 m, p. C2-4, ERDA/BNWL Alternatives App C 1976,-£>IS viii. 300 m, p. 4-5, OWI/DOE, Salt Dep of US 1978 ,iya-\ ix. 300 to 400m desirable, Gera, ORNL Salt Tectonics, GSA 1972 ,T>«f x. 1000 ft, p. 7, BSPP SS Factors, ORNL 1973 fEO^ xi. 200 to 300 m, p. 32, IAEA SS Factors 1977, G»\ xii. assume minimum depth of about 300 m, p. 86; at least 300 to 400 m, p. 115-116, Considerations for HLWM, Gera and Jacobs, ORNL 1972 ,~D& xiii. site selection criteria - 1,000 ft, p. 4-73, ES of WM of LWR Cycle,
NRC 1976 Reason for/determination of minimum depth: a.) depth should be sufficient to separate rep from any surficial process that might cause a breach, i.e. erosion, meteor impact, bombs, etc: i. p. 4-5, NAS/NRC 1978>*l ii. (minimum depth must include consideration of probable penetration distances of these processes/events plus a margin for uncertainties), Kehnemuyi,Battelle M, 1979,3>'^^> iii. p. 7, BSPP SS Factors, ORNL, 1973, D X b.) insure against disinterment by erosion i. p. 2:10, GCR, 1978,~DlO ii. p. C2-4, ERDA/BNWL Alternatives App C 1976 , T > ^ iii. p. 4-5, OWI/DOE Salt Dep of US 1978 jTyaA iv. Gera, Salt Tectonics, ORNL, GSA 1972,TD4 v. stream erosion is the most damaging, p. 7, BSPP SS Factors, ORNL 1973,"DX vi. p. 32, IAEA SS Factors, 1977, £\\ vii. p. 2, Brunton and McClain, OWI/ERDA 1977 ,"00.0 viii. p. 115-116, Considerations for HLWM, Gera and Jacobs, ORNL 1972 /DS -31- P.55 c.) numerous open fractures near surface: i. p. C2-4, ERDA/BNWL Alternatives App C 1976 , TMtf ii. p. 32, IAEA SS Factors 1977 , £ U d.) avoid dissolution of salt by shallow aquifers: i. p. 4-5, OWI/DOE Salt Dep of US 1978 , TJ tx \ ii. p. 98, Considerations for HLWM, Gera and Jacobs, ORNL 1972 j"^ ^ e.) protection against accidental and criminal encounters, de Marsily et al, Guarantee Isolation? 1977 £ 5 f.) factor tending to lengthen transport time - long flow path, p. 8, USGS,
AD Little, Assessment, 1978, C 3 -iii. W. German plan - Asse mine - 775 m depth to disposal horizon, p. 10, Krause and Randl, WM in West Germany, 1972 , ETTiv. introduction to KBS report - geological factors that will determine the suitability of a site - 500 m depth, p. 5 Appendix, Johansson and
Steen, Ringhals - 3, 1978 , £\0 5. Effect of changing the depth: i. in risk assessment, affects the failure probabilities caused by technological imperfections; alters meteorite and human induced failure probabilities, p. 206, AD Little, Assessment 1978 , C-3 ii. reconcentration phenomenon - increasing the depth at first increases and then decreases the magnitude of the effect, (reconcentration phenomenon - maximum discharge rates to biosphere for deep geological rep greater than the corresponding level for surface storage), p. 1.13-1.15, Burkholder, Reconcentration Phenomenon, BNWL, 1976,"t3Vf> iii. increasing depth from zero to 10 miles decreases the highest incremental dose by a factor of 12,000, Incentives for Partitioning,
Burkholder, 1976 ^\L\ -33- P.57 Part II? No. 2 2. Dimensions of Host Rock Body Should be considered/information useful for SS: i. in making criteria, p. 12-13 AECL Canada 1976 ; E^X ii. gross thicknesses, USGS 4339-1, 1972 , t>"X iii. p. 5, 7, USGS 4339-5, 1973, ?>?> iv. looked at in study - thickness of salt, thickness of target bed and areal extent, p. 45, USGS 4339-6J.973 , ^>H v. factor affecting long term safety/suitability of site-salt thickness, p. 25 - 45, AEC-Lyons ES 1971, ~S> (a vi. must be assessed prior to SS-thickness and continuities, p. 4 Program Plan for BS??, 1973 , "D \ vii. assumptions for a safe rep: a volume of rock in stable geological environment, p. 1, EPA State of Knowledge, 1978, CTviii. SS - determine suitability of local regions in terms of probable volume of acceptable lithology at usable depths, p. 13; site evaluation - detailed definition needed of thickness and size of host and associated units, p. 14, ESTP - USGS and
DOE 1979 , T O M ix, study looked at thicknesses of formations in U.S. Pierce &
Rich, USGS Bulletin 1148, 1962 , \3\ Minimum size: The size and shape (lateral and vertical) of body should be sufficient for rep and a sufficiently large buffer zone: i. p. 4-5, NAS/NRC Aug. 1978, h\ ii. buffer zone of "significant" size - p. 15 AECL Canada 1975 , El iii. p. C2-4, ERDA/BNWL Alternatives App. C 1976 , T > * € iv. Kehnerowy'^Battelle M, 1979 , "^"S-3 v. p.. 33, IAEA SS Factors 1977 , £ U vi. p . 2 , Brunton & McCla.i*,, OWI/ERDA 1977 (geological criteria— must be met) "JJ-^JD host rock formation should .be thick: i. p. 1, Pierce and Rich, Bulletin 1148 USGS 1962 , \3>\ ii. Los Medanos suitable - thick seams of salt at usable depths, p. 34, USGS 4339-7, 1973,TiS iii. Mescalero Plains features of interest - thick beds of salt p. 20, USGS - 74 - 190, 1974 . ^ iv. great lateral and vertical extent of salt make SE New Mexico area prime location, p. 2, OEKlL Program Plan for BSPP 1973} TDV v. one of 2 principal reasons for considering certain formations— have large volumes p. 19, IAEA SS Factors 1977, E U vi. rep. rock shall have sufficient vertical extent— p. 2, Brunton & McClain, OWI/ERDA 1977 ,"t>^0 vii. p. 95, p. 98, Considerations for HLWM, Gera & Jacobs ORNL 1972, T>^ -34- P.58 exact minimum thickness: i. total of salt deposits - several 100 ft.; for rep. bed, 20 ft. or more, - p. 1:3, p. 2:16-17, GCR 1978, T> vO ii. Los Medanos tract promising because there is as much as 1,500 to 2,000 ft. of salt above maximum depth - p. 34-35,
USGS 4339-7, 1973, Wib iii. 150 to 200 ft., p. 2-3, Supplemental Areas, KnGS 1972, "2>U iv. several 100 ft. of very low permeability both above and below disposal horizon, p. 23, USGS 74-158, 1974. , <bS? v. 200 ft., p. 21, AEC-Lyens ES 1971 ^DC vi. at least 60m prefered for salt bearing strata; minable salt should be at least 6m thick - p. 4-5, OWI/DOE Salt Dep of
US 1978 , -S)-X\ vii. 100m, Gera, Salt Tect., ORNL, GSA 1972,1)4 viii. 200 ft. p, 3-4; 150 ft. above disposal horizon, p. 4-5,
HLWM, Gera & Jacobs, ORNL 1972 } T i £ vi. the thickness of the layer is not a governing parameter since doubling it only doubles the time it takes the nuclides to reach the environment. De Mars'iU et al, Guarantee Isolation? 1977, t5 lateral extent, distance to structural boundaries, should be adequate to provide for future integrity: i. i.e. to protect from dissolutioning - at least 5 miles to Capitan Reef, at least 1 mile to dissolution front- p.2:16-17,
GCR Sandia 1978, T>10 ii. at least several tens of miles, p. 21, AEC Lyons ES 1971, 3b £> iii. protection from boundary dissolutioning, (required distance depends on an analysis of total thickness and shape of formation; thickness of salt overlying wastes, structure of salt between rep & formation boundary) p. 10 BSPP SS Factors 1973 ORNL , " D ^ iv. to protect rep from dissolutioning, p. 22 IAEA SS Factors, 1977, C W v. to protect rep from dissolutioning, p. 98, considerations for
NWTSP, 1976, D W iv. between rep and dissolution boundary for prediction of dissolution/ determination of adequate lateral extent, p. 10, BSPP SS Factors,
ORNL 1973 j ^ X v. structure shall not compromise rep operations, engineering design or containment (criteria must be met) - consider homogeneity, isotropy, etc., p. 3, Brunton and McClain, OWI/ERDA 1977, " D I D vi. site selection criteria must include consideration of structure and stratigraphy, p. 4-73, ES of WM of LWR Cycle, NRC 1976, CS. vii. USGS - information needed on distribution and extent of major heterogeneities, (affect flow pattern), p. 114; confidence in a site - from understanding of structural and lithologic features on scales of a few meters to tens of kilometers, p. 170-1, Johansson and
Steen, Ringhals-3, 1978, E l O viii. information is needed on geologic structures - detailed high quality maps, 3 dimensional data for design, p. 15, NAS/NRC, Implementation of Standards, 1979 , A 3 2. Simple structure: i. feature of interest of Clovis-Portales area - fairly simple structure, p. 17, USGS 74-60, 1974, "G>G ii. feature of interest of Mescalero Plains area - simple structure, p. 17, USGS 74-190, 1974 ,T3<* iii. for salt, desired since it is a factor that militates against salt flow, p. 4-5, NAS/NRC Bedded Salt 1970, ft"^ iv. large scale site selection criteria - simple structure, p. 12,
SS WIPP, Sandia 1977, " D ^ v. desired since complex geology is an indication of complex hydrology, - p. C2-4, ERDA/BNWL Alternatives App C 1976,TD Ig - p. 33, IAEA SS Factors 1977 , &\ vi. Summary of SS Factors - regional structural framework - minimal; structure of mining horizon - easily mineable, BSPP SS Factors,
OENL 1973 - T D ^ vii. absence of discontinuities desired, or at least a small number, p. 13, EPA State of Knowledge, 1978, C ^ 3. Bedding should be close to horizontal (when rep is in bedded strata): i. less than 3 degrees, p. 2:16-17, GCR 1978 J'SHO ii. information useful in evaluating the Carlsbad formation: gentle dip of less than 2 degrees, p 78, USGS 4339-1, 1972 , T i ^ iii. p. 21, AEC Lyons ES 1971^ "Dfc iv. dip should not exceed a few degrees for ease of mining; steep dips are an indication of tectonic stress and perhaps fractures. - p. C4-5, ERDA/BNWL Alternatives, App C 1976 ,"*>IS - p. 3-4, OWI/DOE Salt Dep of the US, 1978, "D^Xt - p. 34, IAEA SS Factors 1977 , e\V v. in salt, risk of containment failure due to diapirism in negligible if formation beds are close to horizontal - Gera, Salt Tectonics, ORNL, GSA 1972,T>4 - p. 115-116, Gera and Jacobs, Considerations for HLWM, 1972. -37' P.61 vi. dips of mining horizon less than 100 ft/mile, for ease of mining, avoidance of appreciable differential loading, p. 8, BSPP SS Factors,
ORNL 1973 T>-x 4. Continuity of Bedding: i. consideration for construction and assessment of failure scenarios, p. 2:16-17, GCR, 1978, T M O ii. looked at/considered in study, p. 45, USGS 4339-6, 1973 iii. assessed prior to final site selection, p. 4, ORNL, Program Plan for BSPP, 1973, T>\ 5. Deformation/Folding: i. undesirable, p. 2:13, GCR, 1978, t>lO ii. information useful in evaluating Carlsbad formation - little deformed, p. 28-52, USGS 4339-1, 1972 , ^>3^ iii. regions with abundant folding generally less suitable - more fractured rocks, p. 5, USGS 4339-5, 1973 ,!i3 iv. looked at/ considered in study - folding, p. 45, USGS 4339-6, 1973 3^H v. Los Medanos area suitable because only slightly deformed, p. 34,
USGS 4339-7, 1973, C>S vi. features of interest of Clovis-Portales area - moderate folding, age of deformation unknown, p. 17, USGS 74-60, 1974 ,,3>fe» vii. features of interest of Mescalero Plains area - no evidence of deformation, p. 17, USGS 74-190, 1974 ,B*t viii. formation should be relatively undisturbed structurally, p. 21,
AEC Lyons ES 1971, "D& ix. is hazard and should be avoided, p. 12-13, p. 39-41, SS WIPP, Sandia 1977 x. gentle terrain prefered since it is an indication of undisturbed rocks at depth . - p. Cl, ERDA/BNWL Alternatives App C 1976, T> (« - p. 31, IAEA SS Factors, 1977 , £»l 6. character of interbedding/relationships between stratigraphic units should be taken into account: i. for construction and assessment of failure scenarios, p. 2:16-17,
OWI/ERDA 1977, TTi.C> ix. introduces uncertainties into nuclide transport model-making (increases flow rate and decreases sorption), p. 8, USGS, ES
GCR, 1978 , T M O ii. salt formation should be bedded (not dome) p. 21, AEC Lyons ES 1971,1>£> iii.expanded site selection criteria - avoidance of anticlinal structures; synclines are unfavorable for oil and gas accumulation and less likely to contain geopressured brine resevoirs, p. 12; potential geologic hazard to be investigated - salt flowage, p. 39-41,
SS WIPP, Sandia 1977,1)4 11. Other Structures of Concern: i. breccia pipes, dikes, p. 39-41, SS WIPP, Sandia 1977 , T>9 ii. dikes, p.2:13, GCR 1978 ,"DiO iii. taken into account in risk assessment - breccia pipes, p. 95-103,
GCR, 1978 . T H O iii. shales of marine origen given more study - more uniform in composition and less likely to contain coarser grained water-bearing beds, p. 4,
USGS 4339-5, 1973,Tb3> iv. criteria for disposal horizon - those with fewest non-halite interbeds, p. 26, SS WIPP, Sandia 1977 ^ ^ 4 v. rocks with high degree of homogeneity are considered superior but limits of acceptibility of non-homogeneity cannot be stated unequivocally. Heat dissipation can be adversely affected by discrete interbeds of impurities; interbeds known to contain circulating groundwater also detract from formation suitability. - p. C2-4, ERDA/BNWL Alternatives App C 1976,*S>« - p. 33, IAEA SS Factors 1977, EA\ vi. high degree desired for uncomplicated mining operations and heat dissipation, p. 4-5, OWI/DOE Salt Dep of the US, 1978,-D-x\ vii. a degree of lithologic homogeneity is necessary but cannot be assured through surface mapping and coring (especially if the number of boreholes is limited), p. 170-1, Johansson and Steen, Ringhals-3, 1978 jElD 3. Purity in general: i. quality of salt should be considered in making criteria, p. 2-3, Supplemental areas, Kn GS 1972, ~£>U ii. factor affecting long term safety/suitability - salt quality, p. 25-45,
Battelle M, 1979>-3>-X3 vii. desirable to limit as much as possible the amount of moisture available in disposal horizon - water from brine inclusions and hydrated minerals should not exceed 2% by volume (to limit corrosion and gas generation rates to acceptable values), p. 5-6, BSPP SS Factors,
GCR 1978 , T M O iii. collapse during operational period could be disasterous,
Kehnemuyi, Battelle M, 1979 , D'5-3iv. p. 4,5, Brunton and McClain , OWI/ERDA 1977, "DO-O v. p. 13, EPA State of Knowledge 1978 , CTvi. stability must be demonstrated for a period significantly longer than that required for retrievability, p. 15-16, p. 26, NAS/NRC Implementation o f Standards 1979 , A 3 2. Should be such as to ensure that the site is able to maintain its long term structural/mechanical integrity despite stresses imposed by excavation/presence of the rep (thermal, etc.): i. must be established that transient and permanent deformations (displacement, strains and stresses) induced will not produce conditions leading to a breach in integrity - p. C6-10, ERDA/BNWL Alternatives App C 1976,151?' - p. 37-8, IAEA SS Factors 1977, El| ii. has to be shown that emplacement of waste could not have a significant effect on macroscopic stability of the formation, p. 15, AECL Canada 1975, E\ iii. p. 4,5, Brunton and McClain, OWI/ERDA 1977, "£>:>.C> iv. p. IV-8,9, KBS Rydberg and Winchester 1978, E*» v. p. 13, EPA State of Knowledge, 1978 > C T vi. Concept, p. 6, NRC State Review, Nureg 0353 1977 _,CH vii. p. 15-16; variation of stability throughout lifetime of the rep must be calculated and shown to be acceptable under the most adverse thermal conditions generated, p. 28, NAS/NRC Implementation of
Standards, 1979 , Wl. 3. Mechanical properties/state of stress should be considered/information useful for site selection/evaluation: i. such as strength and elastic moduli, in making criteria, p. 12-13,
AECL Canada 1976 > £ 3 ii. looked at in study of rock types - strength - p. 190 on, USGS 74-158, 1974, T b ^ - Section 4.0.3, HLWM Alternatives, BNWL-1900, 1974j"C>l6 iii. generic technical studies to be done on rock mechanics, p. 10,
OWI/ERDA Program Plan for NWTSP 1976, T>\9 iv. host rock characteristics pertinent to waste disposal - plasticity (salt), strength/structural stability (granite, etc), p. 3-4,
USGS ES Perspectives 1978, T*>\0 v. in site evaluation, need detailed definition of mechanical properties of host rock and confining media, p. 15; need information on state of natural stress and bulk and mechanical properties, p. 15, ESTP
USGS and DOE, 1979,"£0-4 vi. experimental determination of state of stress/rock mass stability at site is of primary importance, p. 15-16, NAS/NRC Implementation of Standards 1979, A 3 vii. presence of faults/joints affects stability, p. 35, IAEA SS Factors 1977 , E\\ -45- P.69 4. Strength is desirable: i. sufficient to allow safe excavation, p. 13, EPA State of Knowledge 1 9 7 8 , O ii. factor that will determine suitability of site - rock strength, p. 5 Appendix (Intro to KBS Report), Johansson and Steen, Ringhals-3,1978,"5\0 iii. three factors of rep that lie outside mining experience: containment, required lifetime and thermal stress - imposes stringent requirements on stability of rock mass and on the two principal factors that determine this stability: state of stress and strength of rock mass, p. 37-8,
NAS/NRC Implementation of Standards 1979 } A3 5. Plasticity is desirable: i. contributes to reliability of containment, p. 2, IAEA SS Factors, 1977,Ell ii. to determine potential of shale body for disposal: need to know estimated plasticity, p. 7, USGS 4339-5, 1973 , "B3 iii. hard brittle rocks are unsuitable for disposal - fractures don't heal p. 92; formation must be characterized by plasticity because the sealing of fractures represents "the main safeguard against sudden loss of containment and release of radionuclides to groundwater"; but there are negative consequences of too much plasticity - diapirism; so rate of deformation required must be defined, p. 100-101; so in site selection, use the following criteria: formation should be plastic enough to cause the sealing of fractures but not so plastic as to permit the occurence of diapiritic processes in a time period of several hundred thousand years., p. 131, Considerations for HLWM, Gera and Jacobs, ORNL 1972 .35 £ iv. factor making bedded salt leading candidate - its plasticity, p. 63,
AD Little, Assessment 1978, C3> 6. Desired State of Stress: i. site selected should in past have been mechanically stable, p. 2-9,
ES of WM of LWR Cycle, NRC 1976 ; C S ii. so that existing or future planes of weakness will not be mobilized state of stress should be such that: the resistance to slip is appreciably greater than the shear stress across all planes of orientation within the rock mass; normal minimum stress should exceed the pressure of the hydrostatic head to ensure that existing fractures are not fully opened; to obviate the likelihood of faulting, especially in the presence of hydrostatic pressure, the difference between the values of the maximum and minimum components of the principal stresses should be small, p. 15-16; geoengineering - three factors that lie outside mining experience: containment, required lifetime and thermal stress - imposes stringent requirements on the stability of the rock mass and on the two principal factors that determine this stability - state of stress and strength, p. 37-8, NAS/NRC Implementation of Standards, 1979 , A3 7.Rock should have mechanical properties such that mining it is not too difficult: i. especially drillability in disposal zone - should be equivalent to commercial grade rock salt for convenience, p. 5-6, BSPP SS Factors ,
ORNL 1973 ,"D^ ii. faults and joints affect ease of mining, p. 35, IAEA SS Factors 1977, E U iii. factor making bedded salt a leading candidate - ease of mining, p. 63, AD Little, Assessment 1978 ,,C3 8. Effect of rep induced stresses/deformations should be considered/information useful in site selection/evaluation: i. studies should be performed on deformational behavior of rocks - operation of rep will induce transient and permanent deformations in surrounding and overlying rock, p. 11-12, ORNL Program Plan for BSPP 1973,"DI -46- P.70 ii. in evaluating site suitability, must consider deformations expected around mine openings, long term deformations over rep, creep and their effect on the long term integrity of containment,
KBS Rydberg and Winchester 1978 , E 9 viii. much more needs to be known about thermo-elastic expansion, thermal conductivity, particularly as they are affected by thermal cracking, p. 14,
EPA State of Knowledge 1978 > CTix. factors making bedded salt a leading candidate - high thermal conductivity, p. 63, AD Little, Assessment 1978 j C 3 x. in evaluation of site, need detailed definition of thermal properties of host rock and confining media, p. 15, ESTP, USGS and DOE, 1979jT>2jf xi. current analytical techniques are adequate for predicting temperature distribution. Many of the data for models are site specific and it should be possible to measure most of the parameters during exploration and early stages, p. 2-2, NRC Info Base for Rep Design 1979, c\0 xii. need detailed data on: thermal conductivity, heat capacity, geothermal gradients, p. 16-17, NAS/NRC Implementation of Standards, 1979, A.3 3. Effects of Thermal Stresses imposed by Rep: i. should be considered in additional criteria: problems of geothermal impacts, p. 30, NRC State Review/Analysis, Nureg 0354, 1978, C S ii. generic technical support studies to be done: on heat transfer/thermal analysis, p. 10, OWI/ERDA Program Plan for NWTSP, 1976 ,"p\«* -50- P.74 iii. evaluation of site - evaluation of effects of rep on site over short term - thermal transient, ORNL, McClain and Boch, 1974 ,"3>3 iv. must be considered in rep design and operation, p. 4-76, ES of WM of
USGS and DOE, 1979, TraU, b. Temperature rise in aquifer and at ground surface: i. considered in determining maximum thermal load, p. 46, AEC Lyons ES, 1971 ,T>G ii. considered, p. 3, Letter from Beckner to Schueler Dec. 1978(aquifer),T>\3 iii.at ground surface , considered as it limits thermal loading, p. 4-76, p. 4-81,. ES of WM of LWR Cycle, NRC 1976jC? -51- P.75 c. effect on permeability/groundwater regime: i. permeability may be altered - minimize complications by design with low heat generation rate, p. 111-16, KBS Rydberg and Winchester 1978 , £"4 ii. may cause stress/thermal gradients which are potential driving forces for radionuclide migration - must be understood and characterized before operational safety can be evaluated, p. 4-76, ES of WM of LWR Cycle,
Canister, Sandia 1 9 7 8 , t » f. effect on brine migration in salt (see also Homogeneity and Rock Purity): i. considered in evaluation of site suitability, ORNL McClain and Boch 1974, -52- P.76 ii. limits thermal loading, p. 4-76, ES of WM of LWR Cycle, NRC 1976,, C ? 4. Thermal Loading Should Be Limited: i. upper operating temperature should be prescribed for the combination of the host rock type, waste composition and form to ensure that thermally and radiation induced geophysical processes remain within predictable limits, p. 11-13, NAS/NRC 1978 , M ii. in salt beds at 300m, about .032 kW/square meter is an acceptable heat generation rate. Same order of magnitude will probably apply to other media, p. 6, AECL Canada 1976 , E ^ iii. bulk temperature of salt should not exceed 392 degrees F; not an upper limit - operating experience may indicate higher temperature is allowable and thus provide a possible avenue for improving the economy of the operation, p. 46, AEC Lyons ES, 1971 ,T>6> iv. HLW: temperature in salt should not exceed 200 degrees C; limit total power in any one ten ft canister to 7,500 W; space containers so that the centerline temperature is not over 900 degrees C and the temperature of salt at distance of 8 inches is less than 250 degrees;
TRU - initial heat generation will be limited to about 0.1 W/cubic ft, p. 18-22; NAS/NRC i.Bedded Salt, 1970 , A X v. limit peak temperature safely below the waste's solidification or processing temperature and in salt to 200 degrees C except immediately adjacent to canister; spacing such that 65 kW/hectare heat generation rate, ORNL McClain and Boch, 1974 , T>3 vi. for rep in salt, reasonable limitation is that temperature should not exceed 200 degrees C, p. 76-78, Considerations for HLWM, Gera and
Jacobs, ORNL 1972 , "D S vii. conservative limits need to be set initially on thermal load until problems are resolved, i.e. of the effects of thermal output on the whole system. The uncertainties associated with hot wastes that interact chemically and mechanically with rock and fluid system appear very high. General rule - restrain the maximum permissible temperature to a level lower than that which will cause gas phase to appear, p. 6; uncertainties involved with all media, at least initially, are greatly reduced if used only for relatively cool waste (surface temperature of less than 100 degrees C ) , p. 12-13, USGS, ES Perspectives 1978,"^10 viii. minimize complications of elevated temperature by design of low heat generation rate /canister, p. 111-16; for clay buffer to keep plasticity (KBS plan), maximum temperature in range of 100 to 200 degrees, p. 111-26, KBS Rydberg and Winchester 1978, ES ix. limit thermal loading of HLW to about 150 kW/acre, p. 4-76,
ES of WM of LWR Cycle, NRC 1976 , C « ix. current techniques are adequate for predicting radiation intensity (gamma), p. 2-2; waste-rock interactions - preliminary understanding of these in salt appears adequate and of minor consideration: role of radiolysis in corrosion relative to other corrosion considerations, energy stored when annealing effects are insignificant (at temperature of less than 150 degrees C ) , p. 2-3; Critical information needs for salt: explosive potential of unstable species formed by radiolysis, release of stored energy when salt is below annealing temperature, p. 2-5,
ESTP, USGS and DOE, 1979 "P^4 -54- P.78 Part II: No. 7 Hydrology: Groundwater/Nuclide Transport: 1. Should be taken into account/information useful for site selection/evaluation: i. hydrological transport - for WIPP a secondary factor; evaluate it to allow quantitative calculations of consequences of failure scenarios; slow transport of isotopes is acceptable if more critical factors have been satisfied, p. 2:17-18, GCR, 1978 , "D\0 ii.to be considered in making criteria - hydrology, p. 12-13, AECL Canada 1976 , E l iii. p. 53, USGS 4339-1, 1972,^3. iv. p. 2-3, Supplemental areas, Kn GS, 19721 ^.U v. among most important general and basic considerations: hydrology, p. 9,
AD Little, Assessment 1978 , C 3 xx. site selection - determine suitability of broad regions in terms of suitable regional hydrology, p. 13; site characterization - detailed definition needed of distribution of hydrological properties of rock masses of site, p. 14; long term risk analysis - includes knowledge of natural features that influence nuclide migration, p. 16; need information on regional distribution of rock types and structural features as they affect groundwater flow, p. 16-17; information needed on regional movement of groundwater or surface water supplied by -55- P.79 groundwater; prediction of nuclide concentrations in system as functions of time and space should be done, p. 17, ESTP USGS and
Kehnemuyi, Battelle M. , 1979, "D"*3 viii. salt site selection factor - groundwater : minimal, to limit the rate of dissolution and, if the waste does escape the salt, to limit widespread dispersal in groundwater, p. 9, BSPP SS Factors,
ORNL 1973 jTrv. -56- P.80 ix. or little or no movement of groundwater, (see following factors), p. 2; one of.the two principal reasons for considering a formation no or negligible amounts of migrating groundwater, p. 19, (what is considered negligible must be worked out separately for each site, p. 20); generally host rock should be free of circulating groundwater although over- and under-lying formations may contain water-bearing zones if these are separated from rep by aquiludes, p. 42, IAEA SS Factors 1977 , E U x. salt - at time of disposal, assume there is no circulating groundwater present, 80-81; site selection criteria that should be used formation must be characterized by an absence of groundwater, p. 100, p. 131, Considerations for HLWM, Gera and Jacobs, ORNL 1972, " D ^ xi. but water is almost universally present, de Marsily et al, Guarantee Isolation? 1977 , E S xii. p. 2-9, ES of WM of LWR Cycle, NRC 1976 , C 2 permeability: i. for salt rep, low permeability is desirable in interbeds and surrounding media. Salt permeability to gases may be Important in establishing waste acceptance criteria, p. 2:19-20, GCR 1978 ,"D«0 ii. formation should be impervious to moving groundwater and/or isolated from it, p. 15, Canada AECL 1975, El iii. to be considered in making criteria, a key factor, p. 12-13,
NAS/NRC 1978 , Pr\ iii. to be considered in making criteria - key factor, p. 12-13, AECL Canada 1976 , E X iv. advantage of argillaceous rocks - high ion exchange capacity, p. 3,
EPA State of Knowledge 1978 , CTxv. factors making transport slow - sorption, p. 6-8; factor making bedded salt a leading candidate - presence of shale interbeds that have high sorption capacity, p. 63, AD Little Assessment 1978 , -3 xvi. for long term risk analysis - need information on sorption capacity of system, p. 17; recommended sensitivity analysis - analysis varying K<i's should be performed for realistic conditions.Study will determine accuracy requirements and type of K<j measurements required for sorption coefficients, p. 48, ESTP, USGS and DOE, 1979, "J>^-4 xvii. geochemical redistribution within rep itself may be important for chemical stability of rep prior to large scale mobilization of waste; chemical interactions could affect ultimate rates of transport; so design should be optimized as a system with respect to important chemical processes occuring near field and at larger distance scales; sortion capacity may be inhibited by dissolving canister materials; conditions that inhibit large scale transport still may allow waste to be redistributed locally, i.e. by ion exchange chromatographic effects, creating zones of concentration within rep (see also Criticality),