EEG Reports [A-93-02-II-A-42]
Other documents for the same rulemaking
References: 1,049 extracted, 0 linked to papers
HLWM, Gera and Jacobs, ORNL 1972 , CX)*-) d.) effect on rate of erosion - sea level rise, isostatic uplift: i. can drastically effect the rate of erosion, p. 69-76, Considerations for HLWM, Gera and Jacobs, ORNL, 1972 , (/*>£) e.) possibility of inundation by creation of new lakes, streams, rivers: i. glacial lakes, p. 158-160; new lakes from the return of pluvial climate, p. 165, USGS 74-158, 1974,(^3") f.) possibility of inundation by sea level rise: i. unsuitable areas for rep - where sea level rise could inundate site, p. 2-3; if all ice in polar caps melted, would rise 200 ft - all sites within coastal area, especially those below 200 ft level, should be reviewed critically as site, p. 163, USGS 74-158, 1974, {. ^>%") ii. areas unsuitable for rep - where sea level rise could inundate site, p. 4.4, HLWM Alternatives, BNWL-1900, 1974 , ( T > l O iii. should be taken into consideration, p. 36-40, EPA State of Knowledge, 1978 (CTR g.) effect on rate of dissolutioning of salt formations: i. p. 26-27, USGS 74-158, 1974, C^S") ii. p. 4.63, HLWM Alternatives, BNWL-1900, 1974 J (x>lO h.) effect on rates of sedimentation: i. p. 158-160, USGS 74-158, 1974 , L%<&) i.) glaciation - effect of isostatic loading : faulting and fracturing: i. p. 158=160, USGS 74-158, 1974, C f c ^ ii. peak rates of glacial isostacy linked to extensive faulting, fracturing, seismic activity - should be factored into analysis, p. 122, Johansson and
Steen, Ringhals-3, 1978,CEVO) 3. So should an area which could be glaciated be considered for a rep? i. no or only for concept requiring several thousand feet of burial, p. 158-160, USGS 74-158, 1974, ITSS^ ii. no - most prudent to select a site in an area that has not been affected by any of the Pleistocene glaciations, p. 93, Considerations for HLWM, Gera and Jacobs, ORNL 1972 , CT>S") iii. sure - there may be certain advantages to selecting a site in areas likely to be reglaciated - effectively seals th<em from intrusion several thousand years hence, p. 36-40, EPA State of Knowledge, 1978. ( C ? ) 4. Can we predict climatic changes and its effects? i. yes - general location and maximum effects of glaciation can be predicted, - p. C12-13, ERDA/BNWL, Alternatives App C 1976, (TMS) - p. 44, IAEA SS Factors, 1977, C ^ V ^ P.30 ii. no - at present we don't have the capability to predict future climate so select a site not affected by past glaciations, p. 93, Considerations for HLWM, Gera and Jacobs, ORNL 1972, C T > S ) iii. Can we estimate the long term effects of climatic change? current state of knowledge: moderate understanding of principles, developing models, p. 44, ESTP, USGS and DOE, 1979 , <."*>^H) 5. So far as practicable, design and construction of rep should provide for the possible onset of conditions resulting from gross climatic change, p. 44, IAEA
SS Factors, 1977, C C U " ) P.31 Part I: No. 3 3. Hydrology - surface water 1. Should be taken into account/information useful for site selection/evaluation: i. p. 6-7, USGS 4339-1, 1972, V ^ O ii. p. 2-3, Supplemental areas, Kansas GS, 1972 ^ ^\SVO iii. p. 2:16-17, GCR 1978, l/DVO") iv. p. 25-45, AEC Lyons ES, 1971, C D 6 ) v. determine that present surface water will not interfere with short term or compromise long term containment, - p. 5-6, OWI/DOE, Salt Dep of US 1978, C D 3 A > - p. C10-12, ERDA/BNWL, Alternatives App C 1976,CDig) - p. 41, IAEA SS Factors 1977 •> C E \ 0 vi. future behavior of streams must be predicted in order to assure containment, - p. C10-12, ERDA/BNWL, Alternatives App C 1976 ,t'D\gv) - p. 41, IAEA SS Factors 1977 > K.HW) Because: a.) erosion: i. avoid features that tend to localize and/or accelerate erosion, p. 2:16-17,
GCR 1978 , \.T>\tf) ii. Los Medaflos site suitable - has escaped almost completely undamaged long periods of erssion, p. 34, USGS 4339-7, 1973, V."C>S) iii. potential hazard to rep in SENM - erosion by streams, p. 6
USGS 74-194, 1974, ^ 1 ) iv. site should be where danger of exhumation by erosion is nil, p. 2; most important general and basic considerations - effects of erosion and rates of denudation, p. 9; studies must be made to predict accurately denudation and erosion rates that will prevail during the lifetime of the rep, p. 26-27; USGS 74-158, 1974 , C^>S") v. long term considerations - stream erosion, p. 25-45, AEC Lyons ES 1971, CX>») vi. recommendation for Lyons - long term R&D needed to estimate future rate of erosion, p. 14-15, NAS/NRC, Bedded Salt, 1970 .,(^30 vii. range of tasks includes study of erosion and denudation, p. 32,
OWI/ERDA Program Plan for NWTSP, 1976 ( T ^ } viii. areas of rapid uplift/deformation are less desirable - effect on denudation, p. 3-4, OWI/DOE, Salt Dep of US 1978 , (l>^.\^ ix. site selection - need evaluation of erosion and denudation, p. 3
ORNL - Program Plan for BSPP 1973 , V.t>0 x. evaluation of site suitability must include investigation/evaluation of surface erosion and denudation, ORNL, McClain and Boch, 1974, (,T>3) xi. depth - must be sufficient to protect rep from erosion, Kehnemuyi
Battelle M, 1979 , CT*:L£) xii. rates of erosion - should be considered, p. 9-10, BSPP SS Factors, 1973^^ xiii. areas unsuitable for rep - where there is danger of exhumation by erosion, p. 4.4, HLWM Alternatives, BNWL-1900. 1974 , C-&U0 xiv. consider stream erosion, p. 61-69; necessary to select site in area with low rate of erosion, p. 93; site selection ctiterla that should be used - depth of burial should not be reduced excessively by erosion and the possibility of future increase in erosion rates due to uplift, climatic changes, people should be considered, p. 131, Considerations for HLWM, Gera and Jacobs, ORNL 1972 , C"bS} xv. erosion considered - can expose wastes or alter conditions of groundwater flow, p. 9-12, USGS, ES Perspectives 1978) (E>\0) xvi. geologic hazard to be taken into account - denudation and erosion, p. 36-40, EPA State of Knowledge, 1978, ( C > ) P.32 xvii. events taken into account in risk assessment - erosion, change in erosion rates due to climatic change, p. 162, AD Little,
Assessment, 1978, Cc3") xviii. ES aspects of long term risk analysis - need knowledge of processes affecting containment capability like erosion, p. 16-17,
ESTP, USGS and DOE, 1979, C D ^ H j xix. erosion to be evaluated for changes in hydrologic regime, p. 20, NAS/NRC Implementation of Standards, 1979, l K3") b.) Inundation/flooding: i. evaluate possibility, p. 2:16-17; surface water should not endanger penetrations while these are still unplugged, p. 2:17-18, GCR 1978 , (,T)VO>) ii. possibility considered for SENM, p. 6, USGS 74-194, 1974, C ^ f ) iii. waste should not be placed in natural hazard areas where there are (.DtJj frequent floods (criteria must be met), p. 13-14, Deep Rock, Klett Sandia 1974 iv. flood plains- not suitable for site unless unique design precautions are utilized. - p. C10-12, ERDA/BNWL Alternatives App C 1976,("IMS) - p. p. 41, IAEA SS Factors, 1977 J E W ) v. special problems with using flood plains for site, p. 5-6, OWI/DOE, Salt Dep of US, 1978, ("D^O vi. avoid flood plains and if area has been known to have been flooded within the recent past, its suitability needs careful consideration, Kehnemuyi,
Battelle M, 1979, (V.-X-0 vii. areas unsuitable for rep - where changes in drainage patterns could inundate site, p. 4.4, HLWM Alternatives BNWL-1900, 1974, (.T>\CO c.) rapid dispersal in case of an accident: i. avoid steep surface water gradients, p. 2, USGS 74-158, 1974, ("BS^ ii. so site should be remote from large surface water supplies, p. 9-10,
BSPP SS Factors, ORNL 1973, (.TOT) iii. as far removed from oceans, major lakes, streams as practicable, p. 4.63, HLWM Alternatives, BNWL-1900, 1974 , c."D IC) d.) conflict with surface water usage: i. no area adjacent to actual or potential dam site should be considered, (due to disruption of hydrologic system by presence of lake), p. 13-15,
NAS/NRC, 1978 , ( M ) ii. consideration - possible conflict with recreational, scenic, industrial interest in large lakes and streams - p. C10-12, ERDA/BNWL Alternatives App C 1976, CDVg') - p. 41, IAEA SS Factors, 1977->(EU) iii. areas potentiallly attractive for development of surface water resources shall be avoided as much as possible, p. 6, Brunton and McClain, OWI/ERDA 1977, IT>^0> e.) sedimentation: i. events taken into account in risk assessment - sedimentation, p. 162,
AD Little, Assessment, 1978, (.CV) f.) stream capture: i. to be evaluated/considered for changes in hydrologic regime, p. 20,
NAS/NRC Implementation of Standards, 1979, (t\"*D g.) ES aspects of long term risk analysis - need knowledge of regional movement of surface water supplied by groundwater, p. 16-17, ESTP, USGS and DOE, 1979, P.33 2. So site selection criteria with regard to surface water are: a. mere presence of streams,lakes , ponds above an otherwise suitable site should not necessarily rule it out - determine it will not interfere with operation or jeopardize containment i. p. 5-6, OWI/DOE, Salt Dep of US, 1978,(.T>"xO ii. p. CIO-12, ERDA/BNWL Alternatives App C 1976 ^ T > l O iii. p. 41, IAEA SS Factors, 1977 •.(EW) b.) promising area - Shafer Dome which is crossed by a bend of the Colorado River (this does not seem to bother the authors), p. 62-66, USGS 4339-6, 1973 , W ) c.) site should be far removed from oceans, major drainages, major lakes: i. p. 2, USGS 74-158, 1974, (.W) . ii. Kehnemuyi, Battelle M, 1979, ("P13} iii. surface water should be remote, Summary of SS Factors,
BSPP SS Factors, ORNL 1973 > (."fcl^ iv. p. 4.5; as far as practicable, p. 4.63, HLWM Alternatives,
BNWL-1900, 1974,(T>Vt>j 3. Can we predict future erosion? There is a finite but very low probability that a rep buried at depth will reappear at the earth's surface. How one can make an order of magnitude conjecture concerning the probability is beyond the Panel's ability to resolve, p. 36-40, EPA, State of Knowledge, 1978, C C " ! ) Part I: No. 4 4. Tectonic Stability/Seismicity/Faulting 1. Should be taken into account/information useful for site selection/evaluation: i. take into account location, frequency and intensity of seismic activity, p. 5, USGS 4339-5, 1973, t>3 ii. should be considered in making criteria - seismicity, faulting, p. 12-13, Canada AECL 1976 , C3k iii. consider complexity of internal structure/faulting, p. 45,
USGS 4339-6, 1973, T i ^ iv. features of interest - seismicity, p. 1, faulting, p. 20,
USGS 74-60, 1974,\iC v. features of interest - deformation due to compressional forces or tectonic stresses, p. 17, USGS 74-190, 1974j^q vi. tectonics, p. 25-45, AEC Lyons ES, 1971,"£>•& vii. future occurence of faulting and earthquakes must be considered in site selection, - p. C12-13, ERDA/BNWL Alternatives App C 1976 ,T> I* p. 44, IAEA SS Factors, 1977, E U viii. range of tasks - evaluation of structural stability, seismicity, and tectonics for long periods into the future, p. 32, OWI/ERDA Program Plan for NWTSP, 1976,1)11 ix. must investigate tectonism, especially faulting, diapirism, and microseismicity (can indicate deeply buried faults), ORNL, McClain and
Boch, 1974 ,"*>•£ x. consider tectonism and seismicity - can transport waste to surface, alter initial conditions of groundwater flow, p. 9-12, USGS, ES
SS Factors, ORNL 1973 ,T>"3^ -10- P.35 2. Site preferably located in an area of tectonic stability/low seismicity, low seismic risk: i. in structurally stable block far from tectonic boundary - p. 6-9, NAS/NRC Aug 1978, M - Kehnemuyi, Battelle M, 1979 ,T>13 ii. p. 2:18-19, GCR, 1978,T>VO iii. p. 4, p. 15, Canada AECL 1975, El iv. information useful in evaluating suitability of Carlsbad area tectonically stable since the Tertiary, p. 28-32, USGS 4339-1, 1972, "B3L v. Los Medanos suitable because has long history of tectonic stability, only slightly structurally deformed, p. 34, USGS 4339-7, 1973 )"&£ vi. area suitable - prerequisites of catastrophic events like earthquakes and mountain building not known to exist in SENM, p. 6, USGS 74-194, 1974,B? vii. p. 2; areas unsuitable - where seismic risk is high, p. 3; rep should not be located in seismic risk zone 3, yes in zones 2 or less if zones of active faulting are avoided, p. 187-189; not in S. California, p. 173,
USGS 74-158, 1974 , ^ « viii. areas considered unsuitable - where seismic risk is high, p. 4.4; rep should not be located in seismic risk zone 3, yes in zones 2 or less if zones of active faulting are avoided, p. 4.62, HLWM Alternatives,
BNWL-1900, 1974, T>lt ix. site selection criteria, p. 21, AEC Lyons ES 1971,"E>6 x. p. 5, USGS 4339-5, 1973, "£3 xi. waste should not be placed in natural hazard areas where there are frequent earthquakes, waste should be safe from geologic change, i.e. media must be stable (criteria must be met), p. 13-14, Deep Rock, Klett
Sandia, 1974 ,T>$ xii. criteria for bedded salt, p. 4-5, NAS/NRC Bedded Salt 1970, ft^L xiii. site shall not have experienced events in past 10 (10,000,000) years of type and magnitude that would compromise integrity of rep in future, p. 4-5, NRC State Review, Nureg 0353, 1977, C 4 xiv.siting should be based on geological investigation and predictions of future stability in entire region, p. 30, NRC State Review/Analysis, Nureg 0354, 1978 j C £ xv. dominating factor - geological stability, p. 23.15-17, ERDA/BNWL Alternatives Vol. 4, 1976,T>r? xvi. p. Cl, C2, ERDA/BNWL Alternatives App C 1976jT>Vfl xvii. p. 31-32, IAEA SS Factors 1977 ,E»i xviii. p. 5; regional characteristics important for disposal - regions that have been tectonically stable over the past tens of millions of years are likely to remain so for a while, p. 3-4, OWI/DOE, Salt Dep of US 1978,"T«.\ xix. p. 2, ORNL Program Plan for BSPP, 1973 y T>\ xx. avoid areas of high relief - may indicate questionable stability,
Kehnemuyi, Battelle M, 1979 ,"X>U3 xxi. Summary of SS Factors - tectonic stability, low historic seismicity,
BSPP SS Factors, ORNL 1 9 7 3 ^ - ^ xxii. one of principal reasons for considering a formation - has existed undisturbed for up to many millions of years, p. 19, IAEA SS Factors, 1977,E" xxiii. Criteria must be met - predicted seismic activity of region shall be low enough so as not to pose a threat to operation or integrity of rep, p. 5, Brunton and McClain, OWI/ERDA 1977,"ti'aJD xxiv. site selection criteria that should be used - site distant from orogenic belts, tectonically stable in last few million years, p. 131, Considerations for HLWM, Gera and Jacobs, ORNL 1972, T>5 xxv. to make rep inaccessible and inviolable, de Marsily et al, Guarantee Isolation? 1977.. ES xxvi. one of most important technical aspects - geological stability, rep should not be jeopardized by earthquakes, p. III-6-9, KBS Rydberg and
Winchester, 1978 } E*\ -11- P.36 xxvii. p. 2-9, p. 4-73, ES of WM of LWR Cycle, NRC 1976 , C g xxviii. assumption for safe rep - in an area not subject -to high energy earthquakes, in stable geological environment, p. 1, EPA State of Knowledge, 1978, CTxxix. U. of Uppsala - site should be far from earthquake center in
Sweden, p. 168, Johansson and Steen, Ringhals-3, 1978, t-\0 xxx. select site not prone to seismic activity, p. 15; it must be demonstrated quantitatively that the proposed location of the rep is tectonically very stable, p. 26, NAS/NRC, Implementation of
Standards, 1979 , *3> Reasons for prefering an area of low seismicity/tectonic stability: a.) earthquake induced faulting through rep - a major concern: i. p. 6-9, NAS/NRC 1978, M ii. p. 2, USGS 74-158, 1974,<2>« iii. p. Cl-2, ERDA/BNWL Alternatives App C 1976 ,T>lg iv. p. 5, OWI/DOE Salt Dep of US 1978,T)-a.\ v. p. 31-32, IAEA SS Factors 1977, SW vi. p. 79, p. 92, Considerations for HLWM, Gera and Jacobs, ORNL 1972JD5 vii. p. Ill 6-9, KBS Rydberg and Winchester, 1978, \t°. viii. taken into account in risk assessment, p. 162, AD Little
Assessment, 1978, C3> b.) changes in hydrologic regime: i. p. 9-12, USGS ES Perspectives 1978,TMO ii. p. 20, NAS/NRC Implementation of Standards, 1979 , *^> c.) Trigger diapirism: i. tectonic stability is a factor that militates against salt flow, p. 4-5, NAS/NRC Bedded Salt 1970j *\3*ii. ORNL, McClain and Boch, 1974 ,"T>3 iii. risk of containment failure due to diapirism is negligible if, among other things, the formation is located in a tectonically stable area - Gera, Salt Tectonics, ORNL, GSA 1972>T>lt - p. 115-116, Considerations for HLWM, Gera and
Jacobs, ORNL 1972,1>S iv. p. 3, Brunton and McClain, OWI/ERDA 1977, \)-i© d.) problems wirh areas of pronounced uplift/subsidence: i. avoid such areas as it makes prediction of future dissolution, erosion and salt flow uncertain, p. 2:18-19, GCR 1978, "£> VO ii. avoid areas of rapid uplift - accelerated erosion, p. 3-4,
OWI/DOE Salt Dep of US 1978,-p>\ iii. uplift/subsidence shall not pose a threat to integrity of rep, criteria must be met, p. 3, Brunton and McClain, OWI/ERDA 1977j"t>"^0 iv. uplift - accelerated erosion, p. 69; subsidence - deep burial and subsequent change in temperature and pressure conditions,p. 76-78; uplift can be fast enough to affect the rates of erosion in a way relevant to waste disposal and therefore site should be located in an area where the earth's crust is in isostatic equilibrium and where no uplifting is occuring. Subsidence on the other hand might be a desirable feature, p. 93-4, Considerations for HLWM, Gera and Jacobs,
USGS 74-158, 1974 , T2>3 vi. faults - generally deleterious effect - major faults should be avoided entirely; choose area with no or few faults - if faults are present they should be locatable - p. C4-5, ERDA/BNWL Alternatives App C 1976,"3>« - p. 35, IAEA SS Factors, 1977, E\\ vii. generally undesirable, p. 3-4, OWI/DOE Salt Dep of US 1978-,"t>:a.\ viii. faults along which rupture could occur must be avoided; avoid faults that are active or have been within last million years,
Kehnemuyi, Battelle M, 1979, T)2.3 ix. assure that active fault systems are avoided, p. 4.62, HLWM
Jacobs, ORNL 1972 , D C , v. assumption for safe rep, p. 1, EPA State of Knowledge, 1978, C^ vi. currently active regions not suitably stable for site, p. 14-15; select site not prone to volcanic activity, p. 15, NAS/NRC Implementation of Standards, 1979, f\3 -vii. prerequisites for catastrophic events, i.e. volcanic, not known to be present in SENM - area promising, p. 6, USGS 74-194. 1974 ^ "B> 3. Select site to avoid areas of abnormally high geothermal gradient ( may indicate igneous or tectonic activity): i. p. 6-9, NAS/NRC, 1978 , M ii. p. 2:18-19. GCR, 1978JT>\C iii. Kehnemuyi, Battelle M, 1979/T)"i-«> . iv. p. 32, IAEA SS Factors, 1 9 7 7 t ? \ \ v. p. C2-4, ERDA/BNWL Alternatives App C 1976 ^t)\3
4. ES aspects of long term risk analysis - need knowledge of processes that effect containment capability: for prediction of disruptive events like volcanism that could breach rep., p. 16-17, ESTP, USGS and DOE, 1979 , TViH 5. Can we predict future volcanic activity? i. examine the geologic record of history and frequency of volcanic activity over region to determine the probability of futuce activity, p. 14-15,
NAS/NRC, Implementation of Standards, 1979, A 3 ii. based on geologic history the general location and maximum effects can be predicted - p. C12-13, ERDA/BNWL Alternatives App C 1976 ,t.\€ - p. 44, IAEA SS Factors 1977, E H iii. within different specified regions we may estimate the relative order of danger, but for very few areas can we have confidence in orders of magnitude estimates of ridk probability. Of all the world's volcanoes under observation, only a few exist whose short term behavior is remotely predictable, p. 36-40, EPA State of Knowledge, 1978 , c > -16- P.41 Part: I No.. 6 6. Aquifers Their presence (above, below,interbedded) detracts from suitability/absence preferred: i) questions regarding suitability of salt as host media - sedimentary basins can contain prolific aquifers both above and below salt horizons, p 9 AECL 1976,t"3» ii) Most shales in U S probably not suitable because they are underlain or overlain by important aquifers, p 39-40 USGS 4339-5, 19733 G>2> iii) Preferred salt environment - where there are no important aquifers above rep, p3,
BNWL Alternatives App C 1976,T».^;p 42, LAEA SS Factors 1977, Eu iii) Necessary to assure that wastes are protected from aquifers by showing salt formation is separated and isolated from flowing aquifers by suitable impermeable formations in such a way that water could not contact the salt; or showing that although aquifer is in contact with salt, the available thickness of salt between wastes and aquifers is more than adequate to assure confinement at maxffvpo\ential dissolution rate p 6-7^ So vertical isolation must be adequate to assure confinement., BSPP SS Factors ORNL 1973 (See also Dissolutioning). , 1^1-. -17- P.42 barriers between rep and closest aquifer should be adequate to withstand possible geologic processes, such as faulting, p 131, Considerations for
SS procedure), p 4-82 ES of WM of LWR Cycle, NRC 1976jC# On groundwater: i) nature and characteristics of water bearing strata near disposal zone are critical elements in establishing suitability p 5-6, OWI/DOE Salt Dep of U S 1978iT>a\ essential to determine hydrological characteristics of rocks close to salt formation - p 5,0RNL Program Plan for BSPP 1973 , T>\ iii) for risk analysis need knowledge of featureSthat affect containment capability and nuclide migration like the regional distribution of rock types and structural features as they affect groundwater flow, p 16-17,
ORNL McClain and Boch 1974-, T>3 ix. potential sites in salt should be evaluated for potential exploitation and/or contamination of oil, gas, and water resevoirs, and of salt, potash and other valuable or potentially valuable commodities, p. 4.63, HLWM
Alternatives, BNWL-1900, 1974 , "5) 14> x. site selection - determine suitability of broad regions in terms of potential for denial of natural resources, p. 13; site evaluation - need detailed definition of distribution of physical properties throughout site (i.e. petrologic and mineralogic features), p. 14; ES aspects of long term risk analysis - need knowledge of processes that affect containment capability: identification of mineral resources that might serve to cause people to penetrate rep, p. 16-17, ESTP USGS and DOE 1979 ,"EoH xi. events taken into account in risk analysis - human intrusion: gas/oil exploration, mineral exploration, p. 95-103, AD Little, Assessment 1978 jC3 2. Formation should not be associated with or be in the immediate vicinity of potentially valuable mineral resources: i. no area with present or past history of resource extraction except by surface quarrying should be considered, p. 13-15, NAS/NRC 1978 , AI ii. to the extent possible, p. 2:10; unavoidable conflict with resources should be minimized to the extent possible (large scale site selection criteria), p. 2:20-21, GCR 1978, T>\0 -20- P.45 111 )
PIS', Canada AECL 1975 , £V tract considered is most promising since it is 5 miles or more from any center of industrial activity, i.e.gas or oil wells or mines, p 34-35,
USGS 4339-7, 1973, "G»S preferred salt environment -where oil and gas potential is low; unsuitable area - where strata have high oil or gas potential, p 3 USGS 74-158, ("&) 1974; p 4.4, HLWM Alternative?, BWNL - \*,00 1974 >l.TM C^ p 21 AEC, Lyons E. S. 1971 ..-£>(„ Criteria must be met: waste must not be placed in potentially useful mineral deposits, p 13-14, Deep Rock, Klett/Sandra 1974 jUSf
SS criteria p 12-13, SS WIPP/Sandia 1977, "D9 Site should not offer an attractive resource target p 5; actual or potential resource of site should be such that it will not und I'd y depriv this or future generations of necessary and valuable resources, p 5-6, Nureg 0353, NRC-State Review 1977, CH Would make site more favorable, p 6, OWI/DOE Salt Dep of US 1978 jlilV p 3-4, ORNL, Program Plan for BSPP 1973 , "D \ Avoid areas where mineral resources are "known to abound" and where . resources were "worked out" in formation below rep, Kehnerv\yi Battel M>197<, , T ) D 3 xiii avoid areas of existing production or extensive exploration as much as possible, p 10, mineral potential should be minimal to minimize probability of future operations, p 11, summary, BSPPSS Factors
BSPP SS Factors, ORNL 1973^ " D "i- Must have no natural resources in area that would attract prospection deMars.IVJJ et al, Guarantee I w V ^ ' w ? 1977, (Eg site should not offer attractive resource target, p 5, NRC, State
ORNL Program Plan for BSPP 1973 ,"E>\ viii. in site suitability study, need to consider/evaluate the prevention of adverse conditions from penetrations, ORNL McClain and Boch 1974 ^353 ix. factor to be considered for various criteria: the quantity and spacial distribution of boreholes, mineshafts, and other excavations that may be potential subsurface pathways for water around rep, Glossary, p. 7, Brunton and McClain, OWI/ERDA 1977 N T> Q.O x. method by which nuclides could escape (to be considered) - accidental drilling through formation, p. 86, Considerations for HLWM, Gera and Jacobs ORNL 1972,U5 xi. uncertainties introduced into model-making of nuclide transport: presence of boreholes - must be considered as potential short circuit in containment, p. 8, USGS ES Perspectives 1978, T2>\0 xii. events taken into account in risk analysis: rep stresses cause shaft seal failure, abandoned borehole, mine, not properly plugged, p. 95-103,
WIPP Conceptual Design Report 1977 ,t5V^. v. WIPP - shaft will be lined to provide adequate water seal below the lowest potential aquifer penetrated; aquifers penetrated will be pressure grouted using formation-compatible grouts. Chapter 5, p. 9, WIPP Design Criteria 1978,M vi. KBS plan - leave shaft open for 30 years - there may be problems with this that could make sealing more difficult, p. IV 30-31, KBS Rydberg and Winchester 1978 , E** c. Studies needed: i. sealing technology must be demonstrated. - p. 10, Letter from Beckner to Schueler, 1 9 7 8 , 3 5 ^ - p. IV 8-9; "The shaft sealing problem is.one of the most important technologies to be demonstrated before the KBS design can be considered absolutely safe." p. IV 30-31, KBS Rydberg and Winchester 1978, t°. - set aside test area so concepts planned for seals and backfills can be tested to assure that proper designs have been selected, p.2-7,
NRC Info Base for Rep Design 1979 , 0 0 - concern with KBS proposed scheme: neither small nor large scale experimental simulations have been made to verify its properties.
NRC Info Base for Rep Design 1979 5 CVO - consequence of plugged and unplugged boreholes in vicinity of rep should be evaluated. Leakage should be varied over a reasonable range, flow rates through 'and around plug under normal conditions should be simulated using realistic geologic and hydrologic conditions, p. 48, ESTP USGS and DOE 1979 ,T>-XH d. State of Current Knowledge: - Do we adequately understand how to seal shafts and boreholes? moderate amount of data, developing models. -Do we adequately understand sealing material-media compatibility? limited data, currently expanding data base. - Can we adequately demonstrate the long term stability of sealing materials? limited data, currently expanding data base. - Can we adequately measure/evaluate the in situ permeability of seals? approach unknown, developing techniques - Do we adequately understand the mechanical and chemical stability of sealing materials? moderate amount of data, developing models. p. 42, ESTP USGS and DOE, 1979 ,!>:i>\ -29- P.54 Part II; No.l 1.Depth of disposal formation 1. Should be considered in site selection: i. study looked at depth of salt formations in US, Pierce and Rich,
USGS Bulletin 1148, 1962 , \ M ii. area studied has formation at reasonable depth below surface,p. 78,