Policy Replication

Don Hancock, SRIC Comments on CCA [A-93-02-II-H-30]

Docket document2020-08-18 · EPA · report · EPA-HQ-OAR-2002-0061-0466
RIN 2060-AG85, RIN 2060-AE30 · Docket EPA-HQ-OAR-2002-0061

Other documents for the same rulemaking

Docket documentWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening of Public Comment Period
1995-01-30 Federal RegisterCriteria for the Certification and Determination of the Waste Isolation Pilot Plant's Compliance With Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes
1995-03-01 Federal RegisterCriteria for the Certification and Determination of the Waste Isolation Pilot Plant's Compliance With Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive WastesProposed Rule
1995-08-01 Federal RegisterCriteria for the Certification and Determination of the Waste Isolation Pilot Plant's Compliance With Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes
1996-02-09 Federal RegisterCriteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations
1996-11-15 Federal RegisterDecision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria
1997-01-21 Federal RegisterOpportunity To Present Oral Testimony on the DOE's Compliance Certification Application for the Waste Isolation Pilot Plant; Notice of Public Hearings
1997-10-30 Federal RegisterCriteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision
1997-12-05 Federal RegisterOpportunity To Present Oral Testimony on EPA's Proposed Rule: ``40 CFR Part 194, Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's (WIPP) Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision;'' Notice of Public Hearings
1998-01-27 Federal RegisterOpportunity to Comment on EPA's Analysis of Air Drilling as it Relates to EPA's Proposed Rule: ``40 CFR Part 194, Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's (WIPP) Compliance with the 40 CFR Part 191 Disposal Regulations: Certification Decision''
1998-05-18 Federal RegisterCriteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-05-21 Federal RegisterOpportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-06-24 Federal RegisterQuality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-03-25 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterChange in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant
1999-05-13 Federal RegisterInspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant
1999-05-17 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-10-01 Federal RegisterOpportunity To Present Oral Testimony on Environmental Radiation Protection Standards for Yucca Mountain, Nevada; Notice of Public Hearings
1999-10-18 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-12-08 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2000-04-14 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2000-08-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2000-11-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-04-05 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2001-07-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant
2002-02-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant
2002-03-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant
2002-05-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)
2005-08-29 Docket documentDraft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]
2005-11-03 Docket documentFinal Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]
2006-07-24 Docket documentTechnical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities
2006-07-24 Docket documentTechnical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review
2006-07-24 Docket documentTechnical Support Document for 194.27: Salado Flow Conceptual Models Peer Review
2006-07-24 Docket documentTechnical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment
2006-07-24 Docket documentTechnical Support Document for Section 194.27: Spallings Conceptual Model Peer Review
2006-07-24 Docket documentTechnical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review
2006-07-24 Docket documentTechnical Support Document for Section 194.14: Evaluation of Karst at the WIPP Site
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation
2006-07-25 Docket documentComparison of Effects of Brine Pocket Size
2006-07-25 Docket documentPlutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)
2006-07-25 Docket documentSensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)
2006-07-25 Docket documentSalado Flow Peer Review Plan
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report
2006-07-25 Docket documentII-G-22: Conceptual Models Third Supplementary Peer Review Report
2006-07-25 Docket documentII-G-12: Conceptual Models Supplementary Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report
2006-07-25 Docket documentSpallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow
2006-07-25 Docket documentWaste Isolation Pilot Plant: Conceptual Models Peer Review Report
2006-07-25 Docket documentQuality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]

References: 130 extracted, 0 linked to papers

Page 2Download these results: CSV · JSON
Broek, D. 1986. Elementary Engineering Fracture Mechanics, Fourth Revised Edition, Kluwer Academic Publishers, Dordrecht, The Netherlands.
research reportNot linked to a paper · refsec
Brown, W.T., and J.R. Weatherby. 1990. "Influence of Gas Generation Potential and Gas Generation Rate on the Performance of CH-TRU Disposal Rooms", September 17, 1990 memo to B.M. Butcher and F.T. Mendenhall. Albuquerque, NM: Sandia National Laboratories.
research reportNot linked to a paper · refsec
Davies, P.B. 1990a. "Observations on Interbed Pressurization from Recent 2-Phase, WasteGenerated Gas Simulations", June 26, 1990 memo to B.M. Butcher and F.T. Mendenhall.
research reportNot linked to a paper · refsec
Davies, P.B. 1990b. "First Fluid Pressurization Data Set for InterbeoVFracture Dilation Calculations", October 4, 1990 memo to F.T. Mendenhall. .Albuquerque, NM: Sandia National Laboratories.
research reportNot linked to a paper · refsec
Freeze, G.A., Larson, K.W., and Davies, P.B., "Coupled Multiphase Flow and Closure Analysis of Repository Response to Waste-Generated Gas at the Waste Isolation Pilot Plant (WIPP)", SAND93-1968, Sandia National .Laboratories, Albuquerque, New Mexico,
research reportNot linked to a paper · refsec
October, 1995. Gerstle, W. H., Mendenhall, F., and Wawersik, W. "Prediction of Gas-Driven Hydrofracture at
research reportNot linked to a paper · refsec
WTPP", Department of Civil Engineering University of New Mexico, Albuquerque, NM, 1996.
research reportNot linked to a paper · refsec
Gerstle, W., Xie, M., Panthaki, M., .Labreche, D. and Christian-Frear, T., 1991. ComeT: An Integrated Computer Graphical Structural Zooming System Topical Report RSI-0410,
research reportNot linked to a paper · refsec
RE/SPEC, Inc. Gerstle, W. and Xie, M., 1992. "FEM Modeling of Fictitious Crack Propagation in Concrete",
research reportNot linked to a paper · refsec
Ingraffea, A.R. and V. Saouma. 1985. "Numerical Modeling of Discrete Crack Propagation in Reinforced and Plain Concrete", Fracture Mechanics of Concrete, Sih., G.C. and
research reportNot linked to a paper · refsec
Mendenhall, F. T. and W. H. Gerstle. 1993. "WIPP Anhydrite Fracture Modeling", Internal
research reportNot linked to a paper · refsec
Stoelzel, D., P. Vaughn, J. Bean, and J. Schreiber. 1995. "Summaiy of 1993-94 WTPP Preliminary Undisturbed Repository Calculations," Coupled Multiphase Flow and Page 6-1 Closure Analysis of Repository Response to Waste-Generated Gas at the Waste Isolation Pilot Plant (WIPP)", G.A. Freeze, K.W. Larson, and P.B. Davies, SAND93-1986.
research reportNot linked to a paper · refsec
Tada, H., P. C. Paris, and G. R. Irwin. 1985. "The Stress Analysis of Cracks Handbook", Del Research Corp., Hellertown, Pennsylvania.
journal articleNot linked to a paper · refsec
Wallner, M. 1984. "Frac-Pressure for Cavities in Rock Salt", in Proceedings of the Second Conference on the Mechanical Behavior of Salt. Hanover, Federal Republic of Germany, September 24-28,1984, pp. 645-658.
journal articleNot linked to a paper · refsec
Wawersik, W.R., and R.L. Beauheim March, 1991. Test Plan - Hydraulic Fracturing and Hydrologic Tests in Markerbeds 139 and 140, Sandia National Laboratories,
research reportNot linked to a paper · refsec
Wawersik, W.R., and CM. Stone. 1985. Application of Hydraulic Fracturing to Determine Virgin In Situ Stress State Around Waste Isolation Pilot Plant - In Situ Measurements SAND85-1776, October 1985, Albuquerque, NM: Sandia National Laboratories.
research reportNot linked to a paper · refsec
Wawersik, W.R., and CM. Stone. 1989. "A Characterization of Pressure Records in Inelastic Rock Demonstrated by Hydraulic Fracturing Measurements in Salt", International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts. Vol. 26, No. 6, 613-627.
journal articleNot linked to a paper · refsec
Wawersik, W.R., L.W. Carlson, J.A. Henfling, CL. Howard, D.J. Borns, R.L. Beauheim, and R.M. Roberts. 1995. Hydraulic Fracturing Tests in Anhydrite Interbeds in the WIPP, Marker Beds 139 and 140, SAND95-0596, Sandia National Laboratories, Albuquerque, New Mexico.
research reportNot linked to a paper · refsec
Weatherby, J.R., and J.G. Arguello. 1990. "The Effect of Gas Generation on the Extension of Preexisting Fractures Around WIPP Disposal Rooms", March 28, 1990 memo to B.M.
research reportNot linked to a paper · refsec
Weatherby, J.R., J.G. Arguello, and CM. Stone. 1989. "The Effect of Gas Generation on the Performance of CH-TRU Disposal Rooms", November 14, 1989 memo to B.M. Butcher and D.E. Munson, Albuquerque, NM: Sandia National Laboratories.
research reportNot linked to a paper · refsec
Weatherby, J.R., J.G. Arguello, B.M. Butcher, and CM. Stone. 1991. "The Structural Response of a WIPP Disposal Room with Internal Gas Generation", Rock Mechanics as a Multidisciplinary Science, Proceedings of the 32nd U.S. Symposium , University of
journal articleNot linked to a paper · refsec
Oklahoma, Norman, OK, July 10-12, 1991. Ed. J-C Roegiers. Brookfield, VT: AA.
research reportNot linked to a paper · refsec
Barrer, R. C, Diffusion in and through solids, Cambridge University Press, 1951 (available in our CSEL/libray 541.37 B274d)
journal articleNot linked to a paper · refsec
Callister, William D., Jr., Materials Science and Engineering An Introduction, John Wiley & Sons, Inc. 1994. calculations.nb Hydrogen Diffusion Calculations • Hydrogen generation rate In[l):= 2 moles / (yr drum) * 6800 drum* 120 //N out 11)-. 1.632 x l O 6 m o l e s Hyrodgen diffusion in water prjUa) = - / ) £ = - D ^ Z S ) , J (X in cm) • Concentration of hydrogen in water (Lange, pg. 10-4) 0.0001603 g/100 g H 2 0 . Concentration in moles/cc is 8.015 x 10A-7 (@20 C and 1 atm) In[2):= 0 . 0 0 0 1 6 0 3 / ( 1 0 0 * 2 ) / / N (* Molea H 2 / c c H20 *) Out{2]= 8.015xl0~7 In[3):= Cl B 8 . 0 1 5 * 1 0 * - 7 m o l e s / c m * 3 „ ,,, 0UC[3)= 8.015 xlO"7 moles In[4):= „ ,„, Out[4)= Dl n 5.85* 10*-5 cm* 2 I B (* Perry' s Handbook 3-259 e 25 C *) 0.0000585 cm2 ln[5j:= dx s 100 cm (* assume 1 m t h i c k n e s s o f w a t e r *) Ouc[5]= 100 cm In [6}:= F l u x B Dl * Cl / dx Out[6)z cm2 s ln[7):= Area = 1 0 0 m * 50 m (100 cm) * 2 / m * 2 / / N (* Area f o r r e l e a s e of hydrogen *) 0uc[7]= 5.xl07cm2 (* Calculate sec/yr *) calculations.nb In[8] .•= conv = 3600 s / h r * 24 hr / d a y * 365 d a y / y r Ouc[8)= 31536000 s
journal articleNot linked to a paper · refsec
DOE (1995) Engineered Alternatives Cost Benefit Study: WIPP Compliance Certification Application,
government reportNot linked to a paper · refsec
Appendix EBS, (DOE/WIPP 95-2135, September, 1996)
research reportNot linked to a paper · refsec
Hansen (1997) Spallings release positions paper: description and evaluation of a mechanistically based conceptual model for spall: Sandia National Laboratories and Carlsbad Technical Assistance Contractor, WIPP Spallings Record Package (A-93-02, II-2-23).
government reportNot linked to a paper · refsec
Lyons, W.C. (1984) Air and gas drilling manual: Gulf Publishing Co., Houston, TX, 183 p.
research reportNot linked to a paper · refsec
PAGE October 2, 1997 Mr. Lindsey Lovejoy New Mexico Attomev General's Office Re: phone conversation September 30, 1997: Mr. Lovejoy, Following are some clarifications for your quotation of our conversaftbn. Symbol Inc., acquired the trailer mounted air compressor fleet from I Hesser-Rand Compression Services. We own approxinurtely 90 units consisting of primary coi |] lessors, booster compressors and mist pumps. We rent these units with personnel to operate thee | for various high pressure air needs. Our primary business is supplying air for air drilling operatic n 3. Presently we have 16 sets of units working on air drillmg locations. A set consists of four to e g it of our individual units. Since I have been with Symbol Inc., we have leased equipment to rlington Resources to air drill a well from surface to 6000 feet at a location approximately 10 mile West of Ft. Stockton. We have also drilled four wells for Louis Dreyfus from surface to apprc^imattery 300 feet near Carslbad. We have also drilled into the Devonian formation near Kami it, Pyote, and Coyanosa, Texas. These last three wells had casing set above the producing inifje rval then were air drilled to reduce formation damage. Symbol is actively seeking air drilling opportunities through out the P acmian Basin. b^sf'/f^
research reportNot linked to a paper · refsec
DEFINITIONS Before proceeding it is useful to restate the definitions used by DOE to describe the phenomena of concern (Berglund, 1994): 1. Cuttings: are the waste contained in the cylindrical volume created by the cutting action ofthe drill bit passing through the waste. 2. Cavings: waste that erodesfromthe borehole in response to the upward-flowing drillingfluidwithin the annulus. 3. Spallings: waste introduced into the drillingfluidcaused by the release of waste generated gas escaping to the lower pressure borehole. P.41 5 January, 1998
research reportNot linked to a paper · refsec
THE DOE SPALLINGS SCENARIO—FAILURE ANALYSIS Spallings in the current Performance Assessment (PA) are thought to occur from a drilling intrusion when the repository pressure is above hydrostatic. The usual scenario is that drilling encounters the repository. When the repository pressure is higher than the weight ofthe mud column used in drilling, the mud is blownfromthe hole—a blowout, and gas thenflowsup the borehole carrying with it particlesfromthe waste—these particles are the spallings. To recapitulate: 1) there is blowout ofthe drilling mud; 2) this is followed by a flow of gasfromthe repository that carries with it particles ofthe waste. Spallings are one ofthe more difficult ofthe calculations associated with the repository. The Conceptual Model Peer Review Panel iterated back and forth with Sandia before it was satisfied that the spallings model was reasonable (Wilson et al., 1997). It finally settled on a model that was based upon a limiting size for the cavity formed in the waste after a drilling intrusion. The limiting size was determined by the amount of material that failed dynamically around the borehole (Hansen et al., 1997).
journal articleNot linked to a paper · refsec
MATERIAL FAILURE AROUND BOREHOLE—MUD IN THE BOREHOLE How large the failure of material is during a drilling intrusion was the subject ofthe recent analysis by DOE (Hansen et al., 1997). The work by Hansen, et al. (1997) shows that a dynamic tensile failure happens rapidly around the borehole; the failure occurs within a few milliseconds to a few seconds. The GASOUT code of Schatz (1997) was designed to model dynamics ofthe processes involved. The processes involved in a drilling are several, are coupled, and complex. GASOUT is designed to model 1) theflowof gasfromthe pressurized repository, 2) the dynamic failure of material in both shear and tension around the intruding borehole, and 3) the dynamic expulsion ofthe mudfromthe borehole. The code calculates the amount of material failed around the borehole. It does not model gas transport of spalled material in the borehole; it assumes that all the material that fails around the borehole is carried up the hole. In the case of larger failed volumes this assumption is invalid. Even though
research reportNot linked to a paper · refsec
Curiously, Hansen et al. (1997, p. 3-35) explored the effect of permeability on spalling in the case of mud, but did not report results for the failed volume of material other than at a waste permeability of 1.7 x IO*13 m2. At permeabilities ofthe order of IO'14 m2 with high repository pressure (12 to 14.8 MPa),
research reportNot linked to a paper · refsec
EEG (1997) in its comments to EPA came to similar conclusions regarding the volumes of failed waste material that would accompany a drilling intrusion.
government reportNot linked to a paper · refsec
EEG (1997) pointed out that magnesium oxide backfill, in the presence of brine, will tend to precipitate and cement the waste. This will decrease the waste permeability. This too suggests that the permeability could be lower than the 1.7 x 10"13 m2 assumed in the CCA.. P.44 5 January, 1998
government reportNot linked to a paper · refsec
MR DRHAING In a report dated October, 1997 (Bredehoeft, 1997), prepared for the Attorney General of New
research reportNot linked to a paper · refsec
WIPP depth) pressure in the repository. 2. The release of contaminated brine to the surface during drilling will increase because ofthe reduced pressure in the borehole (EEG, 1997). EEG explored this aspect of drilling with air extensively. 3. Spallings will be increased because ofthe reduced borehole pressure. 4. The amount of waste material that fails within the repository is increased with the reduced borehole pressure. 5. Because ofthe increase in the volume of failed material within WIPP, a scenario involving stuck pipe appears to be probable. Neither DOE or EPA has analyzed the full consequences of drilling into WIPP with air. All of the scenarios involving drilling into WIPP analyzed both by DOE and EPA involve drilling with mud as the drilling fluid.
research reportNot linked to a paper · refsec
POTASH MINED AREAS Drilling with air eliminates the problems of lost circulation of drilling mud. Further review of the WIPP literature suggests it may be the method of choice for drilling where potash is believed to have been mined. In the questions and answers Jack Ahlen, an acknowledged drilling expert, commented (WIPP Inadvertent Intrusion Advisory Panel, 1995): "Lost circulation will be a significant problem once the potash enclave is openedfor drilling Drilling with air through this part ofthe hole will significantly reduce the impact ofthe open cavities on circulation. " P.45 5 January, 1998
research reportNot linked to a paper · refsec
MATERIAL FAILURE AROUND THE BOREHOLE—AD* AS DRILLING FLUID The pressure in the annulus when drilling with air at a depth of 2100 feet is less than 2 MPa—not 8 MPa, the weight of an equivalent mud column. In our earlier report (Bredehoeft, 1997), we replaced the hypothetical mud in the GASOUT code with air and looked at how much failed material occurred within the repository. GASOUT assumes that all the material that fails will be carried up the borehole. This assumption, while appropriate for small failed volumes, is inappropriate when the volume of failed material is large. Nevertheless, GASOUT provides a good representation ofthe failure processes within the repository. It should provide a reasonable projection ofthe volume of material that fails within the repository even if we replace the column of mud with a column of air in the code. Our use of GASOUT is summarized in Figure 3; it shows the volume of failed material in the air drilling scenario. The volumes are large; however, they are only a factor of 2 to 4 times larger than with mud—see Figure 1. GASOUT also suggests that the failure of material occurs quickly—in a matter of a few seconds. In making the calculations for Figure 3 we restricted the simulation ofthe blowout to the first 5 seconds after the repository is penetrated. We also explored the effect on the failed volume ofthe tensile strength ofthe waste using
research reportNot linked to a paper · refsec
EEG (1997) came to a similar conclusion that the volume of failed material associated with a drilling intrusion would be large, especially at the permeabilities of waste likely to exist in WIPP. P.47 5 January, 1998 10000.0 -=, Drilling with Air 1000.0 — 100.0 — 10.0 1.0 — 1E-15 1E-14 1E-13 Permeability (m*m) 1E-12 Figure 3. Failed volumes during a drilling intrusion with air predicted by GASOUT—in the cylindrical mode; waste tensile strength is 10 psi. The lines are best fit lines through the data; the repository pressure is indicated in MPa. P.48 5 January, 1998 Release Spherical Geometry Z level contours-5 m*m*m Cylindrical Release Geometry Z level contours--10 m*m*m Figure 4. Failed volumes for an air drilling intrusion at varying repository pressure and tensile strength for a constant instant permeability of 1.7 x IO"13 m2, predicted by GASOUT. P.49 5 January, 1998
government reportNot linked to a paper · refsec
IV STUCK PIPE In the earlier analysis Berglund (1994) suggested that stuck pipe was only a problem when the waste permeability was less man IO"16 m2. Figure 5 is taken from Berglund (1994). Since the waste permeability was assumed in the CCA to be 1.7 x IO"13 m2 stuck pipe was not regarded as a problem. 194.^194:^^9*1 tirA,{i:±A'AAAi^lM ~.:c •*.*.* '.f. .j*» A,,t,.i Hydrostatic Prtuur* Repository Pressure (MPa) Figure 3 Volume (m3) of Compacted Waste Releasedto the Accessible Environment (Upper bound for blowout, lower and upper boundfi for Gas Erosion and Stuck Pipe) Figure 5. scenario. Figure from Berglund (1994) predicting the release from each type of drilling intrusion P.50 5 January, 1998
research reportNot linked to a paper · refsec
DRILLING WITH MUD At waste permeabilities between IO'14 and IO"15 m2, and lower, the flow of gasfromthe repository is insufficient to blow the mudfromthe hole—a spallings release does not occur (Hansen et al., 1997).
research reportNot linked to a paper · refsec
However, at these lower permeabilities the amount of failed material is large, even with mud in the hole, as shown above—Figure 1. It seems likely that even though the mud is not blownfromthe hole the amount of failed material is sufficient to "stick" the pipe. EEG came to a similar conclusion (EEG, 1997). These scenarios contradict Berglund's (1994) earlier conclusion that stuck pipe was not a problem until the waste permeability was lower than IO'16 m2. Berglund's conclusion was based upon an earlier model of drilling intrusion that now has been replaced.
research reportNot linked to a paper · refsec
AIR DRILLING Let's return to the air drilling scenario outlined above. If one is drilling with a circulation rate of 1800 scf/min at 2100 feet, one has a capacity to drill at approximately 120ft/hr,or about 2 ft/min. This means that one has the ability to remove approximately 1.6ftVminof rock at this depth—or approximately 0.0008 m3/sec. If one drills into WIPP the drilling circulated air plus the flow of gas from the repository cannot remove the volume of failed material; the failed volumes are simply too large.
research reportNot linked to a paper · refsec
CLEAN OUT Berglund (1994) describes the typical clean out procedure after sticking the drill pipe: "When sticking occurs the driller will usually initiate a cleanoutprocedure wherein the drill bit is raised and lower repeatedly into the stickingformation to clear the obstruction. Theprocess can be continued for as much as 12-24 hours if it is shown to be effective." P.51 5 January, 1998 The other variation on this procedure is to raise the drill string above the obstruction (as Bergland indicates), and then drill out the obstruction, lowering the bit slowly in an effort to efficiently remove all the cuttings as drilling proceeds. How much material is brought to the surface during drill operations to free stuck pipe? In the case of a large volume of material initially failed, it is reasonable to expect that much of the failed material will be eroded by further drilling. Most ofthe failed material will eventually reach the land surface—as cavings. If the GASOUT calculations are at all correct, the volume of failed material is large.
research reportNot linked to a paper · refsec
Berglund (1994) estimated the volume of material that could be brought to the surface during a 12 to 24 hour clean out, with mud as the drilling fluid. His estimates rangedfrom43 to 238 m3 of waste. While Berglund's numbers are not quite as large as the largest estimated volumes of failed material, they are within 1 or 2 orders of magnitude. They suggest a violation ofthe EPA disposal criteria. These volumes assume a limit of 24 hours for the period of cleanout. However, if the cleanout proceeds
research reportNot linked to a paper · refsec
PA results to explore how large the spallings release would have to be to violate the EPA standard (EEG, 1997). He showed that if the spallings are increased in the PA calculations by a factor of 16 the CCDF violates the EPA criteria. In PA the spallings release volumes are sampledfroma distribution mat ranges for 0.5 to 4.0 m3. Rucker's result indicates that if the range of releases is sampled from a distribution that is increased by a factor of 16 times, to 8 to 64 m3, the EPA standard would be violated (EEG, 1997). The volume of waste is estimatedfromGASOUT, and summarized in Table 1. P.52 5 January, 1998 Table 1. Estimated failed waste volume (m 3 ) using GASOUT (Schatz, 1997)—see Figures 1 and 3, lines of best fit. For these calculations the waste has tensile strength of 10 psi. During clean-out much of this volume would be carried to the land surface. Waste Permeability 10- 13 m 2
datasetNot linked to a paper · refsec
IO"14 m 10- 15 m 2 MUD DRILLING Repository Pressure 10 .MPA 300 m3 14.8 (lithostatic) A D l DRILLING Repository Pressure 6 MPA 2000 3000 14.8 (lithostatic) 1200 2000 We reiterate that the EEG (1997) determined that the EPA criterion is exceeded in the range of 8 to 64 m 3 —PA samples a range of spallings releases. Our analysis suggests that at lower waste permeabilities the EPA criterion is clearly exceeded; it may be exceeded even at low repository pressures. Assuming air drilling at the higher capacity of 2700 scf/min we can easily drill out the failed volume of material, in most instances in less than one day; at the lower drilling capacity of 1800 scf/min, it would take a number of days to drill out the maximum amount of failed material at the higher repository pressures. P.53 5 January, 1998
research reportNot linked to a paper · refsec
EPA issued two supporting documents as part of its proposed certification ruling—Technical Support Documents, III-B-10 & 11: Spallings Evaluation (EPA, 1997a, EPA 1997b). These two documents analyze the particle size of material that might be carried by a gas release that followed the blowout described above. The analysis modeled the rate of gasflowfroma WIPP room to a borehole after the mud was removed—step 2 in the mud blowout scenario discussed above. They explored waste permeabilities up to 500 md, and concluded that the maximum size of particles that could be transported by theflowinggas was generally less than 100 microns—less than 0.1 mm. In the extreme case, of a 2 foot drilling penetration into the repository and a waste permeability of 500 md, the maximum size particle that could be transported was 570 microns. Based upon this analysis EPA agreed with the CCA calculations done by DOE that suggested the total spallings releases would be in the range sampled by PA—0.5 to 4 m3 of waste material. This size release was shown in the CCA to be well within the certification limit.
government reportNot linked to a paper · refsec
SANDIA Sandia did a similar analysis to that of EPA in which they attempted to examine the maximum size of particle that could be transported to the surface during a spalling event. Figure 4 is taken from S.AND97-1369 (Figure 4-22). Figure 4 indicates that the maximum size particle that can be transported is approximately 30 mm (30,000 microns—3 cm). P.54 5 January, 1998 Q jpaoooo Ol 0 0O<*l9 0 o o o o Time (s) Figure 6. Maximum size of particles (diameter) expelled as a function of time (Figure 4-22, Hansen etal., 1997). The discrepancy between the two models is marked; the results are approximately two orders of magnitude, or more, different. Clearly both models cannot be appropriate for this analysis. The two investigations by DOE and EPA are not coherent and contradict one another (EPA, 1997a, EPA, 1997b, Hansen et. al., 1997). In both cases the models omit the process ofthe drilling and actions ofthe driller. They do not full describe the entire drilling process. These are critical omissions as we show above. P.55 5 January, 1998
research reportNot linked to a paper · refsec
← PreviousNext →