{"document":{"doc_id":180611,"source":"docket_item","org":"EPA","doc_type":"report","title":"Don Hancock, SRIC Comments on CCA [A-93-02-II-H-30]","date":"2020-08-18","url":"https://www.regulations.gov/document/EPA-HQ-OAR-2002-0061-0466","source_native_id":"EPA-HQ-OAR-2002-0061-0466","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OAR-2002-0061"],"rins":["RIN 2060-AG85","RIN 2060-AE30"],"related":[{"doc_id":274910,"source":"docket_item","org":"EPA","doc_type":"data","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening\nof Public Comment Period","date":null},{"doc_id":25578,"source":"fr_rule","org":"Criteria for the Certification and Determination of the Waste Isolation; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Criteria for the Certification and Determination of the Waste Isolation Pilot Plant's Compliance With Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes","date":"1995-01-30"},{"doc_id":25610,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Criteria for the Certification and Determination of the Waste Isolation Pilot Plant's Compliance With Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive WastesProposed Rule","date":"1995-03-01"},{"doc_id":25711,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Criteria for the Certification and Determination of the Waste Isolation Pilot Plant's Compliance With Environmental Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes","date":"1995-08-01"},{"doc_id":24822,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations","date":"1996-02-09"},{"doc_id":25406,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Decision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria","date":"1996-11-15"},{"doc_id":24582,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Opportunity To Present Oral Testimony on the DOE's Compliance Certification Application for the Waste Isolation Pilot Plant; Notice of Public Hearings","date":"1997-01-21"},{"doc_id":24771,"source":"fr_rule","org":"Criteria for the Certification and Recertification of the Waste; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision","date":"1997-10-30"},{"doc_id":24787,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Opportunity To Present Oral Testimony on EPA's Proposed Rule: ``40 CFR Part 194, Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's (WIPP) Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision;'' Notice of Public Hearings","date":"1997-12-05"},{"doc_id":23817,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Opportunity to Comment on EPA's Analysis of Air Drilling as it Relates to EPA's Proposed Rule: ``40 CFR Part 194, Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's (WIPP) Compliance with the 40 CFR Part 191 Disposal Regulations: Certification Decision''","date":"1998-01-27"},{"doc_id":23529,"source":"fr_rule","org":"Criteria for the Certification and Recertification of the Waste; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision","date":"1998-05-18"},{"doc_id":23948,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Opportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision","date":"1998-05-21"},{"doc_id":23999,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Quality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1998-06-24"},{"doc_id":23012,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-03-25"},{"doc_id":23047,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-04-16"},{"doc_id":23049,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Change in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant","date":"1999-04-16"},{"doc_id":23098,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Inspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-05-13"},{"doc_id":23102,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-05-17"},{"doc_id":23264,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Opportunity To Present Oral Testimony on Environmental Radiation Protection Standards for Yucca Mountain, Nevada; Notice of Public Hearings","date":"1999-10-01"},{"doc_id":23277,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-10-18"},{"doc_id":23369,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-12-08"},{"doc_id":21687,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2000-04-14"},{"doc_id":21447,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2000-08-28"},{"doc_id":21309,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2000-11-28"},{"doc_id":21029,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-04-05"},{"doc_id":20903,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2001-07-13"},{"doc_id":20689,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-11-27"},{"doc_id":20690,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-11-27"},{"doc_id":20592,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant","date":"2002-02-13"},{"doc_id":20539,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant","date":"2002-03-20"},{"doc_id":20435,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2002-05-20"},{"doc_id":274192,"source":"docket_item","org":"EPA","doc_type":"report","title":"Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste","date":"2003-07-28"},{"doc_id":274193,"source":"docket_item","org":"EPA","doc_type":"report","title":"Idaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)","date":"2003-07-28"},{"doc_id":271722,"source":"docket_item","org":"EPA","doc_type":"report","title":"Draft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]","date":"2005-08-29"},{"doc_id":271514,"source":"docket_item","org":"EPA","doc_type":"report","title":"Final Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]","date":"2005-11-03"},{"doc_id":269984,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities","date":"2006-07-24"},{"doc_id":269986,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes","date":"2006-07-24"},{"doc_id":269987,"source":"docket_item","org":"EPA","doc_type":"data","title":"Technical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration","date":"2006-07-24"},{"doc_id":269988,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values","date":"2006-07-24"},{"doc_id":269989,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review","date":"2006-07-24"},{"doc_id":269990,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review","date":"2006-07-24"},{"doc_id":269991,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for 194.27: Salado Flow Conceptual Models Peer Review","date":"2006-07-24"},{"doc_id":269992,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment","date":"2006-07-24"},{"doc_id":269994,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.27: Spallings Conceptual Model Peer Review","date":"2006-07-24"},{"doc_id":269995,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review","date":"2006-07-24"},{"doc_id":269997,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review","date":"2006-07-24"},{"doc_id":269998,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.14:  Evaluation of Karst at the WIPP Site","date":"2006-07-24"},{"doc_id":269999,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation","date":"2006-07-24"},{"doc_id":270000,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation","date":"2006-07-24"},{"doc_id":269960,"source":"docket_item","org":"EPA","doc_type":"report","title":"Comparison of Effects of Brine Pocket Size","date":"2006-07-25"},{"doc_id":269961,"source":"docket_item","org":"EPA","doc_type":"report","title":"Plutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)","date":"2006-07-25"},{"doc_id":269962,"source":"docket_item","org":"EPA","doc_type":"report","title":"Sensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)","date":"2006-07-25"},{"doc_id":269963,"source":"docket_item","org":"EPA","doc_type":"report","title":"Salado Flow Peer Review Plan","date":"2006-07-25"},{"doc_id":269964,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report","date":"2006-07-25"},{"doc_id":269965,"source":"docket_item","org":"EPA","doc_type":"report","title":"II-G-22: Conceptual Models Third Supplementary Peer Review Report","date":"2006-07-25"},{"doc_id":269966,"source":"docket_item","org":"EPA","doc_type":"report","title":"II-G-12: Conceptual Models Supplementary Peer Review Report","date":"2006-07-25"},{"doc_id":269967,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report","date":"2006-07-25"},{"doc_id":269968,"source":"docket_item","org":"EPA","doc_type":"report","title":"Spallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow","date":"2006-07-25"},{"doc_id":269969,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Conceptual Models Peer Review Report","date":"2006-07-25"},{"doc_id":269971,"source":"docket_item","org":"EPA","doc_type":"report","title":"Quality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]","date":"2006-07-25"}],"references":[{"citation_id":2334050,"raw_reference":"Anderson, T.L. (1991) Fracture Mechanics—fundamentals and Applications: CRC Press, Boca Raton, FL.","cited_authors":"Anderson, T.L","cited_year":"1991","cited_title":"Fracture Mechanics—fundamentals and Applications: CRC Press, Boca Raton, FL","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334051,"raw_reference":"Stone (1994) Sandia memorandum to F.T. Mendenhall—5 January, 1994: Sandia,","cited_authors":"Stone","cited_year":"1994","cited_title":"Sandia memorandum to F.T. Mendenhall—5 January, 1994: Sandia","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334052,"raw_reference":"Larson (1994) Integrated modeling and experimental programs to predict brine and gas flow at the Waste Isolation Pilot Plant: Sandia (preprint of paper submitted to International Journal of Rock mechanics) SAND94-0599C, 15 p.","cited_authors":"Larson","cited_year":"1994","cited_title":"Integrated modeling and experimental programs to predict brine and gas flow at the Waste Isolation Pilot Plant: Sandia (preprint of paper submitted to International Journal of Rock mechanics) SAND94-0599C, 15 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334053,"raw_reference":"Roberts (1993) Coupled permeability and hydrofracture tests to assess the waste-contamination properties of fractured anhydrite: International Journal of Rock mechanics, v. 30, p. 1159-1163.","cited_authors":"Roberts","cited_year":"1993","cited_title":"Coupled permeability and hydrofracture tests to assess the waste-contamination properties of fractured anhydrite: International Journal of Rock mechanics, v","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334054,"raw_reference":"Bredehoeft, J.D. (1990) Microcomputer codes for simulating transient ground-water flow in two and three space dimensions: U.S. Geological Survey Open-File Report 90-559,106 p.","cited_authors":"Bredehoeft, J.D","cited_year":"1990","cited_title":"Microcomputer codes for simulating transient ground-water flow in two and three space dimensions: U.S. Geological Survey Open-File Report 90-559,106 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334055,"raw_reference":"Bredehoeft, J.D. (1994) JDB-MOC: ground-water flow and transport: GeoChem Software, Inc, Reston, VA, 47 p. & appendices.","cited_authors":"Bredehoeft, J.D","cited_year":"1994","cited_title":"JDB-MOC: ground-water flow and transport: GeoChem Software, Inc, Reston, VA, 47 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334056,"raw_reference":"Hall (1996) WIPP with magnesium oxide back-fill: prepared for NM Attomay General, 27 p.","cited_authors":"Hall","cited_year":"1996","cited_title":"WIPP with magnesium oxide back-fill: prepared for NM Attomay General, 27 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334057,"raw_reference":"Broek, D. (1986) Elementary Engineering Fracture Mechanics: 4* Edition, Kluwer Academic Publishers, Netherlands.","cited_authors":"Broek, D","cited_year":"1986","cited_title":"Elementary Engineering Fracture Mechanics: 4* Edition, Kluwer Academic Publishers, Netherlands","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334058,"raw_reference":"Davies, P.B. (1990) Observations on interbed pressurization from phase 2, waste generated gas simulations: June 26, 1990 memo to B.M. Butcher and F.T. Mendenhall, Sandia National Laboratory, Albuquerque, NM.","cited_authors":"Davies, P.B","cited_year":"1990","cited_title":"Observations on interbed pressurization from phase 2, waste generated gas simulations: June 26, 1990 memo to B.M. Butcher and F.T. Mendenhall, Sandia National Laboratory, Albuquerque, NM","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334059,"raw_reference":"DOE/WIPP (1996) Title 40 CFR part 191. compliance certification application for the Waste Isolation Pilot Plant, appendix SA: DOE/WIPP Carlsbad, NM, 69 p.","cited_authors":"DOE/WIPP","cited_year":"1996","cited_title":"Title 40 CFR part 191","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334060,"raw_reference":"Davies (1995) Coupled multiphase flow and closure analysis of repository response to waste generated gas at the Waste Isolation Pilot Plant (WIPP): Sandia Report, S AND93-1986.","cited_authors":"Davies","cited_year":"1995","cited_title":"Coupled multiphase flow and closure analysis of repository response to waste generated gas at the Waste Isolation Pilot Plant (WIPP): Sandia Report, S AND93-1986","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334061,"raw_reference":"Wawersik (1996) Predicted gas-driven hydrofrac at WIPP: Sandia, Albuquerque,","cited_authors":"Wawersik","cited_year":"1996","cited_title":"Predicted gas-driven hydrofrac at WIPP: Sandia, Albuquerque","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334062,"raw_reference":"Labreche (1994) Background and basis for thefluidflow model incorporated in BRAGFLO for representing pore pressure-induced alterations in permeability and porosity in the anhydrite interbeds above and below the WWP repository horizon: Sandia, SAND94-0381,31 p.","cited_authors":"Labreche","cited_year":"1994","cited_title":"Background and basis for thefluidflow model incorporated in BRAGFLO for representing pore pressure-induced alterations in permeability and porosity in the anhydrite interbeds above and below the WWP repository horizon: Sandia, SAND94-0381,31 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334063,"raw_reference":"Bredehoeft (1978) Computer model of two-dimensional solute transport and dispersion in groundwater: U.S. Geological Survey Techniques of Water-Resource Investigations, Chapter C2, Book 7,37 p. & appendices.","cited_authors":"Bredehoeft","cited_year":"1978","cited_title":"Computer model of two-dimensional solute transport and dispersion in groundwater: U.S. Geological Survey Techniques of Water-Resource Investigations, Chapter C2, Book 7,37 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334064,"raw_reference":"Fryar (1994) Abandoned well characterization: a methodology to evaluate regional hydraulic controls on flow from hydrocarbon reservoirs into underground sources of drinking water: Texas Bureau of Economic Geology, Austin, TX, 149 p.","cited_authors":"Fryar","cited_year":"1994","cited_title":"Abandoned well characterization: a methodology to evaluate regional hydraulic controls on flow from hydrocarbon reservoirs into underground sources of drinking water: Texas Bureau of Economic Geology, Austin, TX, 149 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334065,"raw_reference":"Larson, Kurt (1997) Derivation of fracture parameters from experimental data: Sandia, Memo to Lori Dotson, dated March 20,1997.","cited_authors":"Larson, Kurt","cited_year":"1997","cited_title":"Derivation of fracture parameters from experimental data: Sandia, Memo to Lori Dotson, dated March 20,1997","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334066,"raw_reference":"Davies (1993) Justification for larger exponential multiplierin fractured interbed permeability correlation for 1994 Performance Assessment Calculations: Sandia memo to Martin Tiemey, dated October 11,1993. La Venue, M.(1991) Anomalous Culebra water-level rises near the WIPP site: INTERA Technical Letter","cited_authors":"Davies","cited_year":"1993","cited_title":"Justification for larger exponential multiplierin fractured interbed permeability correlation for 1994 Performance Assessment Calculations: Sandia memo to Martin Tiemey, dated October 11,1993","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334067,"raw_reference":"McKamey, K.E. (1996) Groundwater Issues: NMED/DOE Oversight Bureau, 34 p.","cited_authors":"McKamey, K.E","cited_year":"1996","cited_title":"Groundwater Issues: NMED/DOE Oversight Bureau, 34 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334068,"raw_reference":"Gersde (1993) WIPP anhydrite fracture modeling: Memorandum—12/6/93, DOE CCA","cited_authors":"Gersde","cited_year":"1993","cited_title":"WIPP anhydrite fracture modeling: Memorandum—12/6/93, DOE CCA","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334069,"raw_reference":"Couet (1994) Modeling of gas-driven fracture propagation for oil and gas stimulation: Proceedings of Eurock '94, Rock Mechanics in Petroleum Engineering, Balkema, Rotterdam, Nedierlands, P. 455-462.","cited_authors":"Couet","cited_year":"1994","cited_title":"Modeling of gas-driven fracture propagation for oil and gas stimulation: Proceedings of Eurock '94, Rock Mechanics in Petroleum Engineering, Balkema, Rotterdam, Nedierlands, P. 455-462","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334070,"raw_reference":"Pollard, D.D. and G Holzhausen (1979) On the mechanical interaction between a fluid-filled fracture and the earth's surface: Tectonophysics, v. 53, p. 27-57.","cited_authors":"Pollard, D.D. and G Holzhausen","cited_year":"1979","cited_title":"On the mechanical interaction between a fluid-filled fracture and the earth's surface: Tectonophysics, v","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334071,"raw_reference":"Rubin, A.M. (1993) Tensile fracture of rock at high confining pressure: implication of dike propagation: Journal of Geophysical Research, v. 98, no. B9, p 15919-15935.","cited_authors":"Rubin, A.M","cited_year":"1993","cited_title":"Tensile fracture of rock at high confining pressure: implication of dike propagation: Journal of Geophysical Research, v","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334072,"raw_reference":"Chunovsky (1994) Review of recent developments in fracture mechanics with petroleum applications: Proceedings of Eurock '94, Rock Mechanics in Petroleum Engineering, Balkema, Rotterdam, Netherlands, P. 381-389.","cited_authors":"Chunovsky","cited_year":"1994","cited_title":"Review of recent developments in fracture mechanics with petroleum applications: Proceedings of Eurock '94, Rock Mechanics in Petroleum Engineering, Balkema, Rotterdam, Netherlands, P. 381-389","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334073,"raw_reference":"Silva, M.K. (1996) Fluid injection for salt water disposal and enhanced oil recovery as a potential problem for the","cited_authors":"Silva, M.K","cited_year":"1996","cited_title":"Fluid injection for salt water disposal and enhanced oil recovery as a potential problem for the","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334074,"raw_reference":"WIPP: proceedings ofa June 1995 workshop and analysis: Publication of New Mexico Environmental Evaluation Group » EEG-62,188 p. .Stoelzel, D.M. and D.G.","cited_authors":null,"cited_year":null,"cited_title":"WIPP: proceedings ofa June 1995 workshop and analysis: Publication of New Mexico Environmental Evaluation Group » EEG-62,188 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334075,"raw_reference":"O'Brien (1996) The effects of salt water disposal and waterflooding on WIPP: Sandia National Laboratory, Phase II FEPs Records Package—FEP NS-7a, 41 p. & appendices.","cited_authors":"O'Brien","cited_year":"1996","cited_title":"The effects of salt water disposal and waterflooding on WIPP: Sandia National Laboratory, Phase II FEPs Records Package—FEP NS-7a, 41 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334076,"raw_reference":"Swift (1997) Supplementary analysis ofthe effect of salt water disposal and waterflooding on the WIPP: Sandia, WPO # 44158,99 p.","cited_authors":"Swift","cited_year":"1997","cited_title":"Supplementary analysis ofthe effect of salt water disposal and waterflooding on the WIPP: Sandia, WPO # 44158,99 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334077,"raw_reference":"Vaughn (1997) Technical review of The HARTMAN Scenario: Implications for WIPP: written by John Bredehoeft: Sandia memo to M.S.Y. Chu (SWCF WPO * 45839), 29 p.","cited_authors":"Vaughn","cited_year":"1997","cited_title":"Technical review of The HARTMAN Scenario: Implications for WIPP: written by John Bredehoeft: Sandia memo to M.S.Y. Chu (SWCF WPO * 45839), 29 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334078,"raw_reference":"Roberts (1997) Hydraulic fracturing tests in anhydrite interbeds in the WIPP, Maricer Beds 139 and 140: Sandia Report, SAND950596,64 p. Van Kiik, C , 1994, Report concerning salt water blow-out January, 1991 on the Bates lease—sections 10 and 15, township 26 south, range 27 east, NMDM, Lea County, New Mexico: 16 p,&figures,& appendices. P.59 Printed Sept. 3, 1997 Linear Elastic Model for Hydrofracture at WIPP and Comparison with BRAGFLO Results Prepared for: New Mexico Attorney General Walter Gerstle Associate Professor Dept. of Civil Engineering Univ. of New Mexico","cited_authors":"Roberts","cited_year":"1997","cited_title":"Hydraulic fracturing tests in anhydrite interbeds in the WIPP, Maricer Beds 139 and 140: Sandia Report, SAND950596,64 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334079,"raw_reference":"FAX: (505)277-1988 Email: gerstleffiunm.edu John Bredehoeft The Hydrodynamics Group P.O. Box 354 (234 Scenic Dr.) La Honda, CA 94020 Phone: (415)747-0441","cited_authors":null,"cited_year":null,"cited_title":"FAX: (505)277-1988 Email: gerstleffiunm.edu John Bredehoeft The Hydrodynamics Group P.O. Box 354 (234 Scenic Dr.) La Honda, CA 94020 Phone: (415)747-0441","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334080,"raw_reference":"INTRODUCTION Linear elasticfracturemechanics (LEFM) has been used for predicting the behavior and extent of hydrofractures at WIPP induced by various causes (Mendenhall and Gerstle 1993,","cited_authors":"INTRODUCTION Linear elasticfracturemechanics (LEFM) has been used for predicting the behavior and extent of hydrofractures at WIPP induced by various causes (Mendenhall and Gerstle","cited_year":"1993","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334081,"raw_reference":"Anonymous, \"Summary of EPA-Mandated Performance Assessment Verification Test (Replicate I) and Comparison with Compliance Certification Application Calculations\", July 25, 1997.","cited_authors":"Anonymous, \"Summary of EPA-Mandated Performance Assessment Verification Test (Replicate I) and Comparison with Compliance Certification Application Calculations\", July 25","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334082,"raw_reference":"Beauheim, R.L., Wawersik, W.R., and Roberts, R.M., \"Coupled Permeability and Hydrofracture Tests to .Assess the Waste-Containment Properties of Fractured Anhydrite\", Int. J. Rock Mech. Mineral Science and Geomechanics Abstracts, Vol. 30, No. &, pp. 1159-1163, 1993.","cited_authors":"Beauheim, R.L., Wawersik, W.R., and Roberts, R.M., \"Coupled Permeability and Hydrofracture Tests to .Assess the Waste-Containment Properties of Fractured Anhydrite\", Int. J. Rock Mech. Mineral Science and Geomechanics Abstracts, Vol. 30, No. &, pp. 1159-1163","cited_year":"1993","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334083,"raw_reference":"Beauheim, R.L., Howarth, S.M., Vaughn, P., Webb, S.W., and Larson, K.W. 1994. \"Integrated Modeling and Experimental Programs to Predict Brine and Gas Flow at the Waste Isolation Pilot Plant\". In NEA/OECD: GEOV.AL 1994. Proceedings of an NEA/SKI Symposium, Paris,","cited_authors":"Beauheim, R.L., Howarth, S.M., Vaughn, P., Webb, S.W., and Larson, K.W","cited_year":"1994","cited_title":"Integrated Modeling and Experimental Programs to Predict Brine and Gas Flow at the Waste Isolation Pilot Plant","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334084,"raw_reference":"Bredehoeft, J., and Gerstle, W., \"The Hartman Scenario Revisited: Implications for WIPP\", The Hydrodynamics Group, La Honda, CA, 1997.","cited_authors":"Bredehoeft, J., and Gerstle, W., \"The Hartman Scenario Revisited: Implications for WIPP\", The Hydrodynamics Group, La Honda, CA","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334085,"raw_reference":"Economy, K. E., 1996. \"Drilling into a Salado Zone of Contamination Within the Controlled Area; Drilling into a Non-Salado Zone of Contamination Within the Controlled .Area\". Summary Memo of Record for S-9 and NS-6. SWCF-A 1.1.6.3:PA:QA:TSK:NS-6,S-9. Sandia National Laboratories, Albuquerque, NM WPO 39495.","cited_authors":"Economy, K. E","cited_year":"1996","cited_title":"Drilling into a Salado Zone of Contamination Within the Controlled Area; Drilling into a Non-Salado Zone of Contamination Within the Controlled .Area","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334086,"raw_reference":"WIPP\", Department of Civil Engineering, University of New Mexico, Albuquerque, NM, 1996.","cited_authors":"WIPP\", Department of Civil Engineering, University of New Mexico, Albuquerque, NM","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334087,"raw_reference":"Memorandum, dated Dec. 6, 1993, to Distribution, Sandia National Laboratories, .Albuquerque, New Mexico.","cited_authors":"Memorandum, dated Dec. 6","cited_year":"1993","cited_title":"to Distribution, Sandia National Laboratories, .Albuquerque, New Mexico","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334088,"raw_reference":"Larson, K., Beauheim, R., and Weart, W., \"Experimental Data and BRAGFLO Fracture Model Parameter Values\" memo to Les Shephard, March 31, 1997, Sandia National Laboratories, .Albuquerque, NM.","cited_authors":"Larson, K., Beauheim, R., and Weart, W., \"Experimental Data and BRAGFLO Fracture Model Parameter Values\" memo to Les Shephard, March 31","cited_year":"1997","cited_title":"Sandia National Laboratories, .Albuquerque, NM","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334089,"raw_reference":"Lord, Michael. 1996. \"Parameters describing the variable porosity sand permeability within anhydrite material\". Unpublished memorandum to Margaret Chu, January 29, 1996.","cited_authors":"Lord, Michael","cited_year":"1996","cited_title":"Parameters describing the variable porosity sand permeability within anhydrite material","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334090,"raw_reference":"NM, 1997. Wawersik, W.R., Carlson, L.W., Henfling, J.A., Borns, D.J., Beauheim, R.L., Howard, C.L., and Roberts, R.M., \"Hydraulic Fracturing Tests in Anhydrite Interbeds in the WIPP, Marker Beds 139 and 140\", SAND95-0596, Sandia National Laboratories, Albuquerque, NM, May, 1997. P.72","cited_authors":"NM","cited_year":"1997","cited_title":"Hydraulic Fracturing Tests in Anhydrite Interbeds in the WIPP, Marker Beds 139 and 140","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334091,"raw_reference":"APPENDIX P.73 Printed September 3, 1997 Linear Elastic Models for Hydrofracture at WIPP Prepared for: New Mexico Attorney General Walter Gerstle Associate Professor Department of Civil Engineering Univ. of New Mexico","cited_authors":null,"cited_year":null,"cited_title":"APPENDIX P.73 Printed September 3, 1997 Linear Elastic Models for Hydrofracture at WIPP Prepared for: New Mexico Attorney General Walter Gerstle Associate Professor Department of Civil Engineering Univ","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334092,"raw_reference":"FAX: (505)277-1988 Email: gerstle@unm.edu John Bredehoeft The Hydrodynamics Group P.O. Box 354 (234 Scenic Dr.) La Honda, CA 94020 Phone: (415)747-0441","cited_authors":null,"cited_year":null,"cited_title":"FAX: (505)277-1988 Email: gerstle@unm.edu John Bredehoeft The Hydrodynamics Group P.O. Box 354 (234 Scenic Dr.) La Honda, CA 94020 Phone: (415)747-0441","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334093,"raw_reference":"FPZ is on the order of centimeters; perhaps up to one meter in length at most (Gerstle, Mendenhall and Wawersik 1996). Hydrofracture lengths associated with WIPP may be on the order of kilometers in length. As explained in (Bazant and Cedolin 1991) fracture-sensitive finite element models using a local continuum constitutive model will produce mesh-size dependent results, especially if the finite element size is on the order ofthe size ofthe FPZ or larger. It is hoped that this report will help to answer some of the questions regarding hydrofracture scenarios at WEPP. 1.2 Scope The purpose of this report is to first elucidate the need for LEFM modeling when considering largefracturesat WIPP. The second purpose for this report is to present analytical","cited_authors":"FPZ is on the order of centimeters; perhaps up to one meter in length at most (Gerstle, Mendenhall and Wawersik","cited_year":"1996","cited_title":"Hydrofracture lengths associated with WIPP may be on the order of kilometers in length","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334094,"raw_reference":"Arguello, J.G., J.R. Weatherby, CM. Stone, and F.T. Mendenhall. 1992. \"Effect of Internal Gas Generation on the Extension of Pre-existing Fractures Around WIPP Disposal Rooms\", Rock Mechanics, Proceedings ofthe 33rd U.S. Symposium, Santa Fe, NM, June 3-5, 1992. Eds. J.R. Tillerson and W.R. Wawersik. Brookfield, VT: AA. Balkema. 399408.","cited_authors":"Arguello, J.G., J.R. Weatherby, CM. Stone, and F.T. Mendenhall","cited_year":"1992","cited_title":"Effect of Internal Gas Generation on the Extension of Pre-existing Fractures Around WIPP Disposal Rooms","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334095,"raw_reference":"Arguello, J. G, and C. M. Stone, Internal Memorandum, dated Jan. 5, 1994, to F. T. Mendenhall, Div. 6345, Sandia National Laboratories, Albuquerque, New Mexico.","cited_authors":"Arguello, J. G, and C. M. Stone, Internal Memorandum, dated Jan. 5","cited_year":"1994","cited_title":"to F. T. Mendenhall, Div","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334096,"raw_reference":"Bazant, Z.P., and Cedolin, L., 1991. \"Stability of Structures\", Oxford University Press, New York.","cited_authors":"Bazant, Z.P., and Cedolin, L","cited_year":"1991","cited_title":"Stability of Structures","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334097,"raw_reference":"Beauheim, R.L., W.R. Wawersik, and R.M. Roberts. 1993. \"Coupled Permeability and Hydrofracture Tests to Assess the Waste-Containment Properties of Fractured Anhydrite\", International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts. Vol. 30, No. 7, 1159-1163.","cited_authors":"Beauheim, R.L., W.R. Wawersik, and R.M. Roberts","cited_year":"1993","cited_title":"Coupled Permeability and Hydrofracture Tests to Assess the Waste-Containment Properties of Fractured Anhydrite","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334098,"raw_reference":"Boresi, A.P., O.M. Sidebottom, F.B. Seely, and J.O. Smith, 1978. Advanced Mechanics of","cited_authors":"Boresi, A.P., O.M. Sidebottom, F.B. Seely, and J.O. Smith","cited_year":"1978","cited_title":"Advanced Mechanics of","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334099,"raw_reference":"Materials, Third Edition: Wiley. Bredehoeft, J., and Gerstle, W., \"The HARTMAN Scenario Revisited: Implications for WIPP\", The Hydrodynamics Group, La Honda, CA, August, 1997.","cited_authors":"Materials, Third Edition: Wiley. Bredehoeft, J., and Gerstle, W., \"The HARTMAN Scenario Revisited: Implications for WIPP\", The Hydrodynamics Group, La Honda, CA, August","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334100,"raw_reference":"Broek, D. 1986. Elementary Engineering Fracture Mechanics, Fourth Revised Edition, Kluwer Academic Publishers, Dordrecht, The Netherlands.","cited_authors":"Broek, D","cited_year":"1986","cited_title":"Elementary Engineering Fracture Mechanics, Fourth Revised Edition, Kluwer Academic Publishers, Dordrecht, The Netherlands","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334101,"raw_reference":"Brown, W.T., and J.R. Weatherby. 1990. \"Influence of Gas Generation Potential and Gas Generation Rate on the Performance of CH-TRU Disposal Rooms\", September 17, 1990 memo to B.M. Butcher and F.T. Mendenhall. Albuquerque, NM: Sandia National Laboratories.","cited_authors":"Brown, W.T., and J.R. Weatherby","cited_year":"1990","cited_title":"Influence of Gas Generation Potential and Gas Generation Rate on the Performance of CH-TRU Disposal Rooms","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334102,"raw_reference":"Davies, P.B. 1990a. \"Observations on Interbed Pressurization from Recent 2-Phase, WasteGenerated Gas Simulations\", June 26, 1990 memo to B.M. Butcher and F.T. Mendenhall.","cited_authors":"Davies, P.B","cited_year":"1990a","cited_title":"Observations on Interbed Pressurization from Recent 2-Phase, WasteGenerated Gas Simulations","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334103,"raw_reference":"Davies, P.B. 1990b. \"First Fluid Pressurization Data Set for InterbeoVFracture Dilation Calculations\", October 4, 1990 memo to F.T. Mendenhall. .Albuquerque, NM: Sandia National Laboratories.","cited_authors":"Davies, P.B","cited_year":"1990b","cited_title":"First Fluid Pressurization Data Set for InterbeoVFracture Dilation Calculations","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334104,"raw_reference":"Freeze, G.A., Larson, K.W., and Davies, P.B., \"Coupled Multiphase Flow and Closure Analysis of Repository Response to Waste-Generated Gas at the Waste Isolation Pilot Plant (WIPP)\", SAND93-1968, Sandia National .Laboratories, Albuquerque, New Mexico,","cited_authors":null,"cited_year":null,"cited_title":"Coupled Multiphase Flow and Closure Analysis of Repository Response to Waste-Generated Gas at the Waste Isolation Pilot Plant (WIPP)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334105,"raw_reference":"October, 1995. Gerstle, W. H., Mendenhall, F., and Wawersik, W. \"Prediction of Gas-Driven Hydrofracture at","cited_authors":"October","cited_year":"1995","cited_title":"Gerstle, W. H., Mendenhall, F., and Wawersik, W. \"Prediction of Gas-Driven Hydrofracture at","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334106,"raw_reference":"WTPP\", Department of Civil Engineering University of New Mexico, Albuquerque, NM, 1996.","cited_authors":"WTPP\", Department of Civil Engineering University of New Mexico, Albuquerque, NM","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334107,"raw_reference":"Gerstle, W., Xie, M., Panthaki, M., .Labreche, D. and Christian-Frear, T., 1991. ComeT: An Integrated Computer Graphical Structural Zooming System Topical Report RSI-0410,","cited_authors":"Gerstle, W., Xie, M., Panthaki, M., .Labreche, D. and Christian-Frear, T","cited_year":"1991","cited_title":"ComeT: An Integrated Computer Graphical Structural Zooming System Topical Report RSI-0410","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334108,"raw_reference":"RE/SPEC, Inc. Gerstle, W. and Xie, M., 1992. \"FEM Modeling of Fictitious Crack Propagation in Concrete\",","cited_authors":"RE/SPEC, Inc. Gerstle, W. and Xie, M","cited_year":"1992","cited_title":"FEM Modeling of Fictitious Crack Propagation in Concrete","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334109,"raw_reference":"Ingraffea, A.R. and V. Saouma. 1985. \"Numerical Modeling of Discrete Crack Propagation in Reinforced and Plain Concrete\", Fracture Mechanics of Concrete, Sih., G.C. and","cited_authors":"Ingraffea, A.R. and V. Saouma","cited_year":"1985","cited_title":"Numerical Modeling of Discrete Crack Propagation in Reinforced and Plain Concrete","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334110,"raw_reference":"Mendenhall, F. T. and W. H. Gerstle. 1993. \"WIPP Anhydrite Fracture Modeling\", Internal","cited_authors":"Mendenhall, F. T. and W. H. Gerstle","cited_year":"1993","cited_title":"WIPP Anhydrite Fracture Modeling","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334111,"raw_reference":"Stoelzel, D., P. Vaughn, J. Bean, and J. Schreiber. 1995. \"Summaiy of 1993-94 WTPP Preliminary Undisturbed Repository Calculations,\" Coupled Multiphase Flow and Page 6-1 Closure Analysis of Repository Response to Waste-Generated Gas at the Waste Isolation Pilot Plant (WIPP)\", G.A. Freeze, K.W. Larson, and P.B. Davies, SAND93-1986.","cited_authors":"Stoelzel, D., P. Vaughn, J. Bean, and J. Schreiber","cited_year":"1995","cited_title":"Summaiy of 1993-94 WTPP Preliminary Undisturbed Repository Calculations","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334112,"raw_reference":"Tada, H., P. C. Paris, and G. R. Irwin. 1985. \"The Stress Analysis of Cracks Handbook\", Del Research Corp., Hellertown, Pennsylvania.","cited_authors":"Tada, H., P. C. Paris, and G. R. Irwin","cited_year":"1985","cited_title":"The Stress Analysis of Cracks Handbook","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334113,"raw_reference":"Wallner, M. 1984. \"Frac-Pressure for Cavities in Rock Salt\", in Proceedings of the Second Conference on the Mechanical Behavior of Salt. Hanover, Federal Republic of Germany, September 24-28,1984, pp. 645-658.","cited_authors":"Wallner, M","cited_year":"1984","cited_title":"Frac-Pressure for Cavities in Rock Salt","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334114,"raw_reference":"Wawersik, W.R., and R.L. Beauheim March, 1991. Test Plan - Hydraulic Fracturing and Hydrologic Tests in Markerbeds 139 and 140, Sandia National Laboratories,","cited_authors":"Wawersik, W.R., and R.L. Beauheim March","cited_year":"1991","cited_title":"Test Plan - Hydraulic Fracturing and Hydrologic Tests in Markerbeds 139 and 140, Sandia National Laboratories","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334115,"raw_reference":"Wawersik, W.R., and CM. Stone. 1985. Application of Hydraulic Fracturing to Determine Virgin In Situ Stress State Around Waste Isolation Pilot Plant - In Situ Measurements SAND85-1776, October 1985, Albuquerque, NM: Sandia National Laboratories.","cited_authors":"Wawersik, W.R., and CM. Stone","cited_year":"1985","cited_title":"Application of Hydraulic Fracturing to Determine Virgin In Situ Stress State Around Waste Isolation Pilot Plant - In Situ Measurements SAND85-1776, October 1985, Albuquerque, NM: Sandia National Laboratories","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334116,"raw_reference":"Wawersik, W.R., and CM. Stone. 1989. \"A Characterization of Pressure Records in Inelastic Rock Demonstrated by Hydraulic Fracturing Measurements in Salt\", International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts. Vol. 26, No. 6, 613-627.","cited_authors":"Wawersik, W.R., and CM. Stone","cited_year":"1989","cited_title":"A Characterization of Pressure Records in Inelastic Rock Demonstrated by Hydraulic Fracturing Measurements in Salt","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334117,"raw_reference":"Wawersik, W.R., L.W. Carlson, J.A. Henfling, CL. Howard, D.J. Borns, R.L. Beauheim, and R.M. Roberts. 1995. Hydraulic Fracturing Tests in Anhydrite Interbeds in the WIPP, Marker Beds 139 and 140, SAND95-0596, Sandia National Laboratories, Albuquerque, New Mexico.","cited_authors":"Wawersik, W.R., L.W. Carlson, J.A. Henfling, CL. Howard, D.J. Borns, R.L. Beauheim, and R.M. Roberts","cited_year":"1995","cited_title":"Hydraulic Fracturing Tests in Anhydrite Interbeds in the WIPP, Marker Beds 139 and 140, SAND95-0596, Sandia National Laboratories, Albuquerque, New Mexico","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334118,"raw_reference":"Weatherby, J.R., and J.G. Arguello. 1990. \"The Effect of Gas Generation on the Extension of Preexisting Fractures Around WIPP Disposal Rooms\", March 28, 1990 memo to B.M.","cited_authors":"Weatherby, J.R., and J.G. Arguello","cited_year":"1990","cited_title":"The Effect of Gas Generation on the Extension of Preexisting Fractures Around WIPP Disposal Rooms","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334119,"raw_reference":"Weatherby, J.R., J.G. Arguello, and CM. Stone. 1989. \"The Effect of Gas Generation on the Performance of CH-TRU Disposal Rooms\", November 14, 1989 memo to B.M. Butcher and D.E. Munson, Albuquerque, NM: Sandia National Laboratories.","cited_authors":"Weatherby, J.R., J.G. Arguello, and CM. Stone","cited_year":"1989","cited_title":"The Effect of Gas Generation on the Performance of CH-TRU Disposal Rooms","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334120,"raw_reference":"Weatherby, J.R., J.G. Arguello, B.M. Butcher, and CM. Stone. 1991. \"The Structural Response of a WIPP Disposal Room with Internal Gas Generation\", Rock Mechanics as a Multidisciplinary Science, Proceedings of the 32nd U.S. Symposium , University of","cited_authors":"Weatherby, J.R., J.G. Arguello, B.M. Butcher, and CM. Stone","cited_year":"1991","cited_title":"The Structural Response of a WIPP Disposal Room with Internal Gas Generation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334121,"raw_reference":"Oklahoma, Norman, OK, July 10-12, 1991. Ed. J-C Roegiers. Brookfield, VT: AA.","cited_authors":"Oklahoma, Norman, OK, July 10-12","cited_year":"1991","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334122,"raw_reference":"Barrer, R. C, Diffusion in and through solids, Cambridge University Press, 1951 (available in our CSEL/libray 541.37 B274d)","cited_authors":null,"cited_year":null,"cited_title":"Barrer, R. C, Diffusion in and through solids, Cambridge University Press, 1951 (available in our CSEL/libray 541.37 B274d)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334123,"raw_reference":"Callister, William D., Jr., Materials Science and Engineering An Introduction, John Wiley & Sons, Inc. 1994. calculations.nb Hydrogen Diffusion Calculations • Hydrogen generation rate In[l):= 2 moles / (yr drum) * 6800 drum* 120 //N out 11)-. 1.632 x l O 6 m o l e s Hyrodgen diffusion in water prjUa) = - / ) £ = - D ^ Z S ) , J (X in cm) • Concentration of hydrogen in water (Lange, pg. 10-4) 0.0001603 g/100 g H 2 0 . Concentration in moles/cc is 8.015 x 10A-7 (@20 C and 1 atm) In[2):= 0 . 0 0 0 1 6 0 3 / ( 1 0 0 * 2 ) / / N (* Molea H 2 / c c H20 *) Out{2]= 8.015xl0~7 In[3):= Cl B 8 . 0 1 5 * 1 0 * - 7 m o l e s / c m * 3 „ ,,, 0UC[3)= 8.015 xlO\"7 moles In[4):= „ ,„, Out[4)= Dl n 5.85* 10*-5 cm* 2 I B (* Perry' s Handbook 3-259 e 25 C *) 0.0000585 cm2 ln[5j:= dx s 100 cm (* assume 1 m t h i c k n e s s o f w a t e r *) Ouc[5]= 100 cm In [6}:= F l u x B Dl * Cl / dx Out[6)z cm2 s ln[7):= Area = 1 0 0 m * 50 m (100 cm) * 2 / m * 2 / / N (* Area f o r r e l e a s e of hydrogen *) 0uc[7]= 5.xl07cm2 (* Calculate sec/yr *) calculations.nb In[8] .•= conv = 3600 s / h r * 24 hr / d a y * 365 d a y / y r Ouc[8)= 31536000 s","cited_authors":"Callister, William D., Jr., Materials Science and Engineering An Introduction, John Wiley & Sons, Inc","cited_year":"1994","cited_title":"calculations.nb Hydrogen Diffusion Calculations • Hydrogen generation rate In[l):= 2 moles / (yr drum) * 6800 drum* 120 //N out 11)-. 1.632 x l O 6 m o l e s Hyrodgen diffusion in water prjUa) = - / ) £ = - D ^ Z S ) , J (X in cm) • Concentration of hydrogen in water (Lange, pg","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334124,"raw_reference":"DOE (1995) Engineered Alternatives Cost Benefit Study: WIPP Compliance Certification Application,","cited_authors":"DOE","cited_year":"1995","cited_title":"Engineered Alternatives Cost Benefit Study: WIPP Compliance Certification Application","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334125,"raw_reference":"Appendix EBS, (DOE/WIPP 95-2135, September, 1996)","cited_authors":"Appendix EBS, (DOE/WIPP 95-2135, September","cited_year":"1996","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334126,"raw_reference":"Hansen (1997) Spallings release positions paper: description and evaluation of a mechanistically based conceptual model for spall: Sandia National Laboratories and Carlsbad Technical Assistance Contractor, WIPP Spallings Record Package (A-93-02, II-2-23).","cited_authors":"Hansen","cited_year":"1997","cited_title":"Spallings release positions paper: description and evaluation of a mechanistically based conceptual model for spall: Sandia National Laboratories and Carlsbad Technical Assistance Contractor, WIPP Spallings Record Package (A-93-02, II-2-23)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334127,"raw_reference":"Lyons, W.C. (1984) Air and gas drilling manual: Gulf Publishing Co., Houston, TX, 183 p.","cited_authors":"Lyons, W.C","cited_year":"1984","cited_title":"Air and gas drilling manual: Gulf Publishing Co., Houston, TX, 183 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334128,"raw_reference":"PAGE October 2, 1997 Mr. Lindsey Lovejoy New Mexico Attomev General's Office Re: phone conversation September 30, 1997: Mr. Lovejoy, Following are some clarifications for your quotation of our conversaftbn. Symbol Inc., acquired the trailer mounted air compressor fleet from I Hesser-Rand Compression Services. We own approxinurtely 90 units consisting of primary coi |] lessors, booster compressors and mist pumps. We rent these units with personnel to operate thee | for various high pressure air needs. Our primary business is supplying air for air drilling operatic n 3. Presently we have 16 sets of units working on air drillmg locations. A set consists of four to e g it of our individual units. Since I have been with Symbol Inc., we have leased equipment to rlington Resources to air drill a well from surface to 6000 feet at a location approximately 10 mile West of Ft. Stockton. We have also drilled four wells for Louis Dreyfus from surface to apprc^imattery 300 feet near Carslbad. We have also drilled into the Devonian formation near Kami it, Pyote, and Coyanosa, Texas. These last three wells had casing set above the producing inifje rval then were air drilled to reduce formation damage. Symbol is actively seeking air drilling opportunities through out the P acmian Basin. b^sf'/f^","cited_authors":null,"cited_year":null,"cited_title":"PAGE October 2, 1997 Mr","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334129,"raw_reference":"DEFINITIONS Before proceeding it is useful to restate the definitions used by DOE to describe the phenomena of concern (Berglund, 1994): 1. Cuttings: are the waste contained in the cylindrical volume created by the cutting action ofthe drill bit passing through the waste. 2. Cavings: waste that erodesfromthe borehole in response to the upward-flowing drillingfluidwithin the annulus. 3. Spallings: waste introduced into the drillingfluidcaused by the release of waste generated gas escaping to the lower pressure borehole. P.41 5 January, 1998","cited_authors":"DEFINITIONS Before proceeding it is useful to restate the definitions used by DOE to describe the phenomena of concern (Berglund","cited_year":"1994","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334130,"raw_reference":"THE DOE SPALLINGS SCENARIO—FAILURE ANALYSIS Spallings in the current Performance Assessment (PA) are thought to occur from a drilling intrusion when the repository pressure is above hydrostatic. The usual scenario is that drilling encounters the repository. When the repository pressure is higher than the weight ofthe mud column used in drilling, the mud is blownfromthe hole—a blowout, and gas thenflowsup the borehole carrying with it particlesfromthe waste—these particles are the spallings. To recapitulate: 1) there is blowout ofthe drilling mud; 2) this is followed by a flow of gasfromthe repository that carries with it particles ofthe waste. Spallings are one ofthe more difficult ofthe calculations associated with the repository. The Conceptual Model Peer Review Panel iterated back and forth with Sandia before it was satisfied that the spallings model was reasonable (Wilson et al., 1997). It finally settled on a model that was based upon a limiting size for the cavity formed in the waste after a drilling intrusion. The limiting size was determined by the amount of material that failed dynamically around the borehole (Hansen et al., 1997).","cited_authors":"THE DOE SPALLINGS SCENARIO—FAILURE ANALYSIS Spallings in the current Performance Assessment (PA) are thought to occur from a drilling intrusion when the repository pressure is above hydrostatic. The usual scenario is that drilling encounters the repository. When the repository pressure is higher than the weight ofthe mud column used in drilling, the mud is blownfromthe hole—a blowout, and gas thenflowsup the borehole carrying with it particlesfromthe waste—these particles are the spallings. To recapitulate: 1) there is blowout ofthe drilling mud; 2) this is followed by a flow of gasfromthe repository that carries with it particles ofthe waste. Spallings are one ofthe more difficult ofthe calculations associated with the repository. The Conceptual Model Peer Review Panel iterated back and forth with Sandia before it was satisfied that the spallings model was reasonable (Wilson et al","cited_year":"1997","cited_title":"It finally settled on a model that was based upon a limiting size for the cavity formed in the waste after a drilling intrusion","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334131,"raw_reference":"MATERIAL FAILURE AROUND BOREHOLE—MUD IN THE BOREHOLE How large the failure of material is during a drilling intrusion was the subject ofthe recent analysis by DOE (Hansen et al., 1997). The work by Hansen, et al. (1997) shows that a dynamic tensile failure happens rapidly around the borehole; the failure occurs within a few milliseconds to a few seconds. The GASOUT code of Schatz (1997) was designed to model dynamics ofthe processes involved. The processes involved in a drilling are several, are coupled, and complex. GASOUT is designed to model 1) theflowof gasfromthe pressurized repository, 2) the dynamic failure of material in both shear and tension around the intruding borehole, and 3) the dynamic expulsion ofthe mudfromthe borehole. The code calculates the amount of material failed around the borehole. It does not model gas transport of spalled material in the borehole; it assumes that all the material that fails around the borehole is carried up the hole. In the case of larger failed volumes this assumption is invalid. Even though","cited_authors":"MATERIAL FAILURE AROUND BOREHOLE—MUD IN THE BOREHOLE How large the failure of material is during a drilling intrusion was the subject ofthe recent analysis by DOE (Hansen et al","cited_year":"1997","cited_title":"The work by Hansen, et al","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334132,"raw_reference":"Curiously, Hansen et al. (1997, p. 3-35) explored the effect of permeability on spalling in the case of mud, but did not report results for the failed volume of material other than at a waste permeability of 1.7 x IO*13 m2. At permeabilities ofthe order of IO'14 m2 with high repository pressure (12 to 14.8 MPa),","cited_authors":"Curiously, Hansen et al","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334133,"raw_reference":"EEG (1997) in its comments to EPA came to similar conclusions regarding the volumes of failed waste material that would accompany a drilling intrusion.","cited_authors":"EEG","cited_year":"1997","cited_title":"in its comments to EPA came to similar conclusions regarding the volumes of failed waste material that would accompany a drilling intrusion","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334134,"raw_reference":"EEG (1997) pointed out that magnesium oxide backfill, in the presence of brine, will tend to precipitate and cement the waste. This will decrease the waste permeability. This too suggests that the permeability could be lower than the 1.7 x 10\"13 m2 assumed in the CCA.. P.44 5 January, 1998","cited_authors":"EEG","cited_year":"1997","cited_title":"pointed out that magnesium oxide backfill, in the presence of brine, will tend to precipitate and cement the waste","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334135,"raw_reference":"MR DRHAING In a report dated October, 1997 (Bredehoeft, 1997), prepared for the Attorney General of New","cited_authors":"MR DRHAING In a report dated October, 1997 (Bredehoeft","cited_year":"1997","cited_title":"prepared for the Attorney General of New","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334136,"raw_reference":"WIPP depth) pressure in the repository. 2. The release of contaminated brine to the surface during drilling will increase because ofthe reduced pressure in the borehole (EEG, 1997). EEG explored this aspect of drilling with air extensively. 3. Spallings will be increased because ofthe reduced borehole pressure. 4. The amount of waste material that fails within the repository is increased with the reduced borehole pressure. 5. Because ofthe increase in the volume of failed material within WIPP, a scenario involving stuck pipe appears to be probable. Neither DOE or EPA has analyzed the full consequences of drilling into WIPP with air. All of the scenarios involving drilling into WIPP analyzed both by DOE and EPA involve drilling with mud as the drilling fluid.","cited_authors":"WIPP depth) pressure in the repository. 2. The release of contaminated brine to the surface during drilling will increase because ofthe reduced pressure in the borehole (EEG","cited_year":"1997","cited_title":"EEG explored this aspect of drilling with air extensively","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334137,"raw_reference":"POTASH MINED AREAS Drilling with air eliminates the problems of lost circulation of drilling mud. Further review of the WIPP literature suggests it may be the method of choice for drilling where potash is believed to have been mined. In the questions and answers Jack Ahlen, an acknowledged drilling expert, commented (WIPP Inadvertent Intrusion Advisory Panel, 1995): \"Lost circulation will be a significant problem once the potash enclave is openedfor drilling Drilling with air through this part ofthe hole will significantly reduce the impact ofthe open cavities on circulation. \" P.45 5 January, 1998","cited_authors":"POTASH MINED AREAS Drilling with air eliminates the problems of lost circulation of drilling mud. Further review of the WIPP literature suggests it may be the method of choice for drilling where potash is believed to have been mined. In the questions and answers Jack Ahlen, an acknowledged drilling expert, commented (WIPP Inadvertent Intrusion Advisory Panel","cited_year":"1995","cited_title":"Lost circulation will be a significant problem once the potash enclave is openedfor drilling Drilling with air through this part ofthe hole will significantly reduce the impact ofthe open cavities on circulation","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334138,"raw_reference":"MATERIAL FAILURE AROUND THE BOREHOLE—AD* AS DRILLING FLUID The pressure in the annulus when drilling with air at a depth of 2100 feet is less than 2 MPa—not 8 MPa, the weight of an equivalent mud column. In our earlier report (Bredehoeft, 1997), we replaced the hypothetical mud in the GASOUT code with air and looked at how much failed material occurred within the repository. GASOUT assumes that all the material that fails will be carried up the borehole. This assumption, while appropriate for small failed volumes, is inappropriate when the volume of failed material is large. Nevertheless, GASOUT provides a good representation ofthe failure processes within the repository. It should provide a reasonable projection ofthe volume of material that fails within the repository even if we replace the column of mud with a column of air in the code. Our use of GASOUT is summarized in Figure 3; it shows the volume of failed material in the air drilling scenario. The volumes are large; however, they are only a factor of 2 to 4 times larger than with mud—see Figure 1. GASOUT also suggests that the failure of material occurs quickly—in a matter of a few seconds. In making the calculations for Figure 3 we restricted the simulation ofthe blowout to the first 5 seconds after the repository is penetrated. We also explored the effect on the failed volume ofthe tensile strength ofthe waste using","cited_authors":"MATERIAL FAILURE AROUND THE BOREHOLE—AD* AS DRILLING FLUID The pressure in the annulus when drilling with air at a depth of 2100 feet is less than 2 MPa—not 8 MPa, the weight of an equivalent mud column. In our earlier report (Bredehoeft","cited_year":"1997","cited_title":"we replaced the hypothetical mud in the GASOUT code with air and looked at how much failed material occurred within the repository","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334139,"raw_reference":"EEG (1997) came to a similar conclusion that the volume of failed material associated with a drilling intrusion would be large, especially at the permeabilities of waste likely to exist in WIPP. P.47 5 January, 1998 10000.0 -=, Drilling with Air 1000.0 — 100.0 — 10.0 1.0 — 1E-15 1E-14 1E-13 Permeability (m*m) 1E-12 Figure 3. Failed volumes during a drilling intrusion with air predicted by GASOUT—in the cylindrical mode; waste tensile strength is 10 psi. The lines are best fit lines through the data; the repository pressure is indicated in MPa. P.48 5 January, 1998 Release Spherical Geometry Z level contours-5 m*m*m Cylindrical Release Geometry Z level contours--10 m*m*m Figure 4. Failed volumes for an air drilling intrusion at varying repository pressure and tensile strength for a constant instant permeability of 1.7 x IO\"13 m2, predicted by GASOUT. P.49 5 January, 1998","cited_authors":"EEG","cited_year":"1997","cited_title":"came to a similar conclusion that the volume of failed material associated with a drilling intrusion would be large, especially at the permeabilities of waste likely to exist in WIPP. P.47 5 January, 1998 10000.0 -=, Drilling with Air 1000.0 — 100.0 — 10.0 1.0 — 1E-15 1E-14 1E-13 Permeability (m*m) 1E-12 Figure 3","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334140,"raw_reference":"IV STUCK PIPE In the earlier analysis Berglund (1994) suggested that stuck pipe was only a problem when the waste permeability was less man IO\"16 m2. Figure 5 is taken from Berglund (1994). Since the waste permeability was assumed in the CCA to be 1.7 x IO\"13 m2 stuck pipe was not regarded as a problem. 194.^194:^^9*1 tirA,{i:±A'AAAi^lM ~.:c •*.*.* '.f. .j*» A,,t,.i Hydrostatic Prtuur* Repository Pressure (MPa) Figure 3 Volume (m3) of Compacted Waste Releasedto the Accessible Environment (Upper bound for blowout, lower and upper boundfi for Gas Erosion and Stuck Pipe) Figure 5. scenario. Figure from Berglund (1994) predicting the release from each type of drilling intrusion P.50 5 January, 1998","cited_authors":"IV STUCK PIPE In the earlier analysis Berglund","cited_year":"1994","cited_title":"16 m2. Figure 5 is taken from Berglund (1994). Since the waste permeability was assumed in the CCA to be 1.7 x IO","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334141,"raw_reference":"DRILLING WITH MUD At waste permeabilities between IO'14 and IO\"15 m2, and lower, the flow of gasfromthe repository is insufficient to blow the mudfromthe hole—a spallings release does not occur (Hansen et al., 1997).","cited_authors":"DRILLING WITH MUD At waste permeabilities between IO'14 and IO\"15 m2, and lower, the flow of gasfromthe repository is insufficient to blow the mudfromthe hole—a spallings release does not occur (Hansen et al","cited_year":"1997","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334142,"raw_reference":"However, at these lower permeabilities the amount of failed material is large, even with mud in the hole, as shown above—Figure 1. It seems likely that even though the mud is not blownfromthe hole the amount of failed material is sufficient to \"stick\" the pipe. EEG came to a similar conclusion (EEG, 1997). These scenarios contradict Berglund's (1994) earlier conclusion that stuck pipe was not a problem until the waste permeability was lower than IO'16 m2. Berglund's conclusion was based upon an earlier model of drilling intrusion that now has been replaced.","cited_authors":"However, at these lower permeabilities the amount of failed material is large, even with mud in the hole, as shown above—Figure 1. It seems likely that even though the mud is not blownfromthe hole the amount of failed material is sufficient to \"stick\" the pipe. EEG came to a similar conclusion (EEG","cited_year":"1997","cited_title":"These scenarios contradict Berglund's (1994) earlier conclusion that stuck pipe was not a problem until the waste permeability was lower than IO'16 m2","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334143,"raw_reference":"AIR DRILLING Let's return to the air drilling scenario outlined above. If one is drilling with a circulation rate of 1800 scf/min at 2100 feet, one has a capacity to drill at approximately 120ft/hr,or about 2 ft/min. This means that one has the ability to remove approximately 1.6ftVminof rock at this depth—or approximately 0.0008 m3/sec. If one drills into WIPP the drilling circulated air plus the flow of gas from the repository cannot remove the volume of failed material; the failed volumes are simply too large.","cited_authors":null,"cited_year":null,"cited_title":"AIR DRILLING Let's return to the air drilling scenario outlined above","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334144,"raw_reference":"CLEAN OUT Berglund (1994) describes the typical clean out procedure after sticking the drill pipe: \"When sticking occurs the driller will usually initiate a cleanoutprocedure wherein the drill bit is raised and lower repeatedly into the stickingformation to clear the obstruction. Theprocess can be continued for as much as 12-24 hours if it is shown to be effective.\" P.51 5 January, 1998 The other variation on this procedure is to raise the drill string above the obstruction (as Bergland indicates), and then drill out the obstruction, lowering the bit slowly in an effort to efficiently remove all the cuttings as drilling proceeds. How much material is brought to the surface during drill operations to free stuck pipe? In the case of a large volume of material initially failed, it is reasonable to expect that much of the failed material will be eroded by further drilling. Most ofthe failed material will eventually reach the land surface—as cavings. If the GASOUT calculations are at all correct, the volume of failed material is large.","cited_authors":"CLEAN OUT Berglund","cited_year":"1994","cited_title":"When sticking occurs the driller will usually initiate a cleanoutprocedure wherein the drill bit is raised and lower repeatedly into the stickingformation to clear the obstruction. Theprocess can be continued for as much as 12-24 hours if it is shown to be effective","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334145,"raw_reference":"Berglund (1994) estimated the volume of material that could be brought to the surface during a 12 to 24 hour clean out, with mud as the drilling fluid. His estimates rangedfrom43 to 238 m3 of waste. While Berglund's numbers are not quite as large as the largest estimated volumes of failed material, they are within 1 or 2 orders of magnitude. They suggest a violation ofthe EPA disposal criteria. These volumes assume a limit of 24 hours for the period of cleanout. However, if the cleanout proceeds","cited_authors":"Berglund","cited_year":"1994","cited_title":"estimated the volume of material that could be brought to the surface during a 12 to 24 hour clean out, with mud as the drilling fluid","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334146,"raw_reference":"PA results to explore how large the spallings release would have to be to violate the EPA standard (EEG, 1997). He showed that if the spallings are increased in the PA calculations by a factor of 16 the CCDF violates the EPA criteria. In PA the spallings release volumes are sampledfroma distribution mat ranges for 0.5 to 4.0 m3. Rucker's result indicates that if the range of releases is sampled from a distribution that is increased by a factor of 16 times, to 8 to 64 m3, the EPA standard would be violated (EEG, 1997). The volume of waste is estimatedfromGASOUT, and summarized in Table 1. P.52 5 January, 1998 Table 1. Estimated failed waste volume (m 3 ) using GASOUT (Schatz, 1997)—see Figures 1 and 3, lines of best fit. For these calculations the waste has tensile strength of 10 psi. During clean-out much of this volume would be carried to the land surface. Waste Permeability 10- 13 m 2","cited_authors":"PA results to explore how large the spallings release would have to be to violate the EPA standard (EEG","cited_year":"1997","cited_title":"He showed that if the spallings are increased in the PA calculations by a factor of 16 the CCDF violates the EPA criteria","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334147,"raw_reference":"IO\"14 m 10- 15 m 2 MUD DRILLING Repository Pressure 10 .MPA 300 m3 14.8 (lithostatic) A D l DRILLING Repository Pressure 6 MPA 2000 3000 14.8 (lithostatic) 1200 2000 We reiterate that the EEG (1997) determined that the EPA criterion is exceeded in the range of 8 to 64 m 3 —PA samples a range of spallings releases. Our analysis suggests that at lower waste permeabilities the EPA criterion is clearly exceeded; it may be exceeded even at low repository pressures. Assuming air drilling at the higher capacity of 2700 scf/min we can easily drill out the failed volume of material, in most instances in less than one day; at the lower drilling capacity of 1800 scf/min, it would take a number of days to drill out the maximum amount of failed material at the higher repository pressures. P.53 5 January, 1998","cited_authors":"IO\"14 m 10- 15 m 2 MUD DRILLING Repository Pressure 10 .MPA 300 m3 14.8 (lithostatic) A D l DRILLING Repository Pressure 6 MPA 2000 3000 14.8 (lithostatic) 1200 2000 We reiterate that the EEG","cited_year":"1997","cited_title":"determined that the EPA criterion is exceeded in the range of 8 to 64 m 3 —PA samples a range of spallings releases","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334148,"raw_reference":"EPA issued two supporting documents as part of its proposed certification ruling—Technical Support Documents, III-B-10 & 11: Spallings Evaluation (EPA, 1997a, EPA 1997b). These two documents analyze the particle size of material that might be carried by a gas release that followed the blowout described above. The analysis modeled the rate of gasflowfroma WIPP room to a borehole after the mud was removed—step 2 in the mud blowout scenario discussed above. They explored waste permeabilities up to 500 md, and concluded that the maximum size of particles that could be transported by theflowinggas was generally less than 100 microns—less than 0.1 mm. In the extreme case, of a 2 foot drilling penetration into the repository and a waste permeability of 500 md, the maximum size particle that could be transported was 570 microns. Based upon this analysis EPA agreed with the CCA calculations done by DOE that suggested the total spallings releases would be in the range sampled by PA—0.5 to 4 m3 of waste material. This size release was shown in the CCA to be well within the certification limit.","cited_authors":"EPA issued two supporting documents as part of its proposed certification ruling—Technical Support Documents, III-B-10 & 11: Spallings Evaluation (EPA","cited_year":"1997a","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334149,"raw_reference":"SANDIA Sandia did a similar analysis to that of EPA in which they attempted to examine the maximum size of particle that could be transported to the surface during a spalling event. Figure 4 is taken from S.AND97-1369 (Figure 4-22). Figure 4 indicates that the maximum size particle that can be transported is approximately 30 mm (30,000 microns—3 cm). P.54 5 January, 1998 Q jpaoooo Ol 0 0O<*l9 0 o o o o Time (s) Figure 6. Maximum size of particles (diameter) expelled as a function of time (Figure 4-22, Hansen etal., 1997). The discrepancy between the two models is marked; the results are approximately two orders of magnitude, or more, different. Clearly both models cannot be appropriate for this analysis. The two investigations by DOE and EPA are not coherent and contradict one another (EPA, 1997a, EPA, 1997b, Hansen et. al., 1997). In both cases the models omit the process ofthe drilling and actions ofthe driller. They do not full describe the entire drilling process. These are critical omissions as we show above. P.55 5 January, 1998","cited_authors":"SANDIA Sandia did a similar analysis to that of EPA in which they attempted to examine the maximum size of particle that could be transported to the surface during a spalling event. Figure 4 is taken from S.AND97-1369 (Figure 4-22). Figure 4 indicates that the maximum size particle that can be transported is approximately 30 mm (30,000 microns—3 cm). P.54 5 January, 1998 Q jpaoooo Ol 0 0O<*l9 0 o o o o Time (s) Figure 6. Maximum size of particles (diameter) expelled as a function of time (Figure 4-22, Hansen etal","cited_year":"1997","cited_title":"The discrepancy between the two models is marked; the results are approximately two orders of magnitude, or more, different","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334150,"raw_reference":"Berglund, J.W., 1994, Memorandum of record—the direct removal of waste caused by a drilling intrusion into a WIPP pannel—a position paper: University of New Mexico, New Mexico Engineering Research Institute, 23 p.","cited_authors":"Berglund, J.W","cited_year":"1994","cited_title":"Memorandum of record—the direct removal of waste caused by a drilling intrusion into a WIPP pannel—a position paper: University of New Mexico, New Mexico Engineering Research Institute, 23 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334151,"raw_reference":"Bredehoeft, J., 1997, Air drilling into WIPP: The Hydrodynamics Group, prepared for the Attorney General of New Mexico, submitted to the WIPP docket no. A-93-02. Environmental Evaluation Group (EEG), 1997, Letter to Frank Marcinowski, Office ofRadiation and Indoor Air, EPA, Washington, DC—December 31, 1997: Albuquerque, NM, 14 p. and enclosures.","cited_authors":"Bredehoeft, J","cited_year":"1997","cited_title":"Air drilling into WIPP: The Hydrodynamics Group, prepared for the Attorney General of New Mexico, submitted to the WIPP docket no","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334152,"raw_reference":"Hansen, F.D., M.K. Knowles, T.W. Thompson, M. Gross, J.D. McLennan, J.F. Schatz, 1997, Description and evaluation of a mechanistically based conceptual model for spall: Sandia Report, SAND97-1369,","cited_authors":"Hansen, F.D., M.K. Knowles, T.W. Thompson, M. Gross, J.D. McLennan, J.F. Schatz","cited_year":"1997","cited_title":"Description and evaluation of a mechanistically based conceptual model for spall: Sandia Report, SAND97-1369","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334153,"raw_reference":"UC-721. Lyons, W.C, 1984, Air and gas drilling manual: Gulf Publishing Co., Houston, 183 p.","cited_authors":"UC-721. Lyons, W.C","cited_year":"1984","cited_title":"Air and gas drilling manual: Gulf Publishing Co., Houston, 183 p","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334154,"raw_reference":"OECD Nuclear Energy Agency/International Atomic Energy Agency (NEA/IAEA), 1997, International peer review ofthe 1996 Performance Assessment ofthe US Waste Isolation Pilot Plant (WIPP): Report ofthe NEA/IAEA International Review Group.","cited_authors":"OECD Nuclear Energy Agency/International Atomic Energy Agency (NEA/IAEA)","cited_year":"1997","cited_title":"International peer review ofthe 1996 Performance Assessment ofthe US Waste Isolation Pilot Plant (WIPP): Report ofthe NEA/IAEA International Review Group","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334155,"raw_reference":"Schatz, J., 1997, Waste spallings calculation (GASOUT): John F. Schatz Research & Consulting, Inc.,","cited_authors":"Schatz, J","cited_year":"1997","cited_title":"Waste spallings calculation (GASOUT): John F. Schatz Research & Consulting, Inc","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334156,"raw_reference":"WIPP Spallings Record Package. U.S. Environmental Protection Agency (EPA), 1997a, Spallings evaluation: Technical Support Document for Section 194.23, WIPP docket no. A-93-02, III-B-10. U.S. Environmental Protection Agency (EPA), 1997b, Supplemental spallings evaluation: Technical Support Document for Section 194.23, WIPP docket no. A-93-02, III-B-11.","cited_authors":"WIPP Spallings Record Package. U.S. Environmental Protection Agency (EPA)","cited_year":"1997a","cited_title":"Spallings evaluation: Technical Support Document for Section 194.23, WIPP docket no","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334157,"raw_reference":"Wilson, C, D. Porter, J. Gibbons, E. Oswald, G. Sjoblom, and F. Caporuscio, 1997, WIPP conceptual model 3rd supplementary peer review report—final report: DOE, Carlsbad Area Office, Office of Regulatory Compliance—April, 1997","cited_authors":"Wilson, C, D. Porter, J. Gibbons, E. Oswald, G. Sjoblom, and F. Caporuscio","cited_year":"1997","cited_title":"WIPP conceptual model 3rd supplementary peer review report—final report: DOE, Carlsbad Area Office, Office of Regulatory Compliance—April, 1997","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334158,"raw_reference":"WIPP Inadvertent Intrusion Advisory Panel, 1995, Analytical study of an inadvertent intrusion ofthe","cited_authors":"WIPP Inadvertent Intrusion Advisory Panel","cited_year":"1995","cited_title":"Analytical study of an inadvertent intrusion ofthe","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334159,"raw_reference":"LISTS OF CCA- AND PAVT-RELATED DOCUMENTS SENT TO SANDIA WIPP CENTRAL FILES BETWEEN OCTOBER 1,1996 AND DECEMBER 31,1997 (INCLUDING ONE SET OF GLOSSARY AND SPREADSHEET INSTRUCTIONS EACH FOR THE CCA AND PAVT LISTS)","cited_authors":null,"cited_year":null,"cited_title":"LISTS OF CCA- AND PAVT-RELATED DOCUMENTS SENT TO SANDIA WIPP CENTRAL FILES BETWEEN OCTOBER 1,1996 AND DECEMBER 31,1997 (INCLUDING ONE SET OF GLOSSARY AND SPREADSHEET INSTRUCTIONS EACH FOR THE CCA AND PAVT LISTS)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334160,"raw_reference":"RECORDS CENTER COLLECTION BETWEEN OCTOBER 1,1996 AND JULY 31,1997 record package dele record package was subrecord or tstablished or segment segment segment modified","cited_authors":null,"cited_year":null,"cited_title":"RECORDS CENTER COLLECTION BETWEEN OCTOBER 1,1996 AND JULY 31,1997 record package dele record package was subrecord or tstablished or segment segment segment modified","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334161,"raw_reference":"REFERENCES SAN066-4666. OUTSTANDING REFERENCE ISSUES FOR SAND66-4660. OUTSTANDING REFERENCE ISSUES FOR SAND96-4800 SAND96-4800 EPA2) SALADO HYDROLOGY FIELD DATA. AUGUST 1989 THRU","cited_authors":null,"cited_year":null,"cited_title":"REFERENCES SAN066-4666","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334162,"raw_reference":"STATEMENT OF CONTENT tnm OCTOBER 1995 EPA4| SALADO HYDROLOGY FIELD OATA. AUGUST 1648 THRU 8/15/97 OCTOBER 1685","cited_authors":null,"cited_year":null,"cited_title":"STATEMENT OF CONTENT tnm OCTOBER 1995 EPA4| SALADO HYDROLOGY FIELD OATA. AUGUST 1648 THRU 8/15/97 OCTOBER 1685","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334163,"raw_reference":"STATEMENT OF CONDITION EPA4| SALADO HYDROLOGY FIELD DATA, AUGUST 1869 THRU 6/1S/B7 OCTOBER 1995 6.0 EQUIPMENT DESCRIPTION EPA4] SALADO HYDROLOGY FIELD DATA, AUGUST 1666 THRU 8/15/97 OCTOBER 1695 6.1 TEST AND MONITORING TOOLS EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1668 THRU 9/15/97 OCTOBER 1995 6.1.4 MONITORING TOOLS","cited_authors":null,"cited_year":null,"cited_title":"STATEMENT OF CONDITION EPA4| SALADO HYDROLOGY FIELD DATA, AUGUST 1869 THRU 6/1S/B7 OCTOBER 1995 6.0 EQUIPMENT DESCRIPTION EPA4] SALADO HYDROLOGY FIELD DATA, AUGUST 1666 THRU 8/15/97 OCTOBER 1695 6.1 TEST AND MONITORING TOOLS EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1668 THRU 9/15/97 OCTOBER 1995 6.1.4 MONITORING TOOLS","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334164,"raw_reference":"EPAS| SALADO HYDROLOGY FIELD DATA, AUGUST 1946 THRU 9/15/97 OCTOBER 1985 6.3 DATA-ACQUISITION SYSTEM EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1666 THRU 6/15/87 OCTOBER 1895 6.5 PRESSURE-TRANSDUCER-CALIBRATION SYSTEM EPA4] SALADO HYDROLOGY FIELD DATA. AUGUST 1666 THRU 8/15/97 OCTOBER 1695 6.6 THERMOCOUPLES EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1646 THRU 9/15/97 OCTOBER 1885 6.7 LINEAR VARIABLE-DIFFERENTIAL TRANSFORMERS EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1969 THRU 9/15/97 OCTOBER 1995 6.8 DIFFERENTIAL-PRESSURE-TRANSMITTER PANEL EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1666 THRU 6/15/87 OCTOBER 1895 6.9 PRESSURIZED-BRINE SAMPLING APPARATUS EPA4| SALADO HYDROLOGY FIELD DATA, AUGUST 1666 THRU 8/15/87 OCTOBER 1695 6.10 PRESSURE-MAINTENANCE SYSTEM EPA4| SALADO HYDROLOGY FIELD OATA. AUGUST 1969 THRU 8/15/67 OCTOBER 1995 6.12 PRESSURE REGULATORS EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1664 THRU 6/15/87 OCTOBER 1495 7.4 THERMOCOUPLE CALIBRATIONS EPA4| SALADO HYDROLOGY FIELD DATA, AUGUST i486 THRU 7.5 LINEAR VARIABLE-DIFFERENTIAL TRANSFORMERS 8/15/87 OCTOBER 1495","cited_authors":null,"cited_year":null,"cited_title":"EPAS| SALADO HYDROLOGY FIELD DATA, AUGUST 1946 THRU 9/15/97 OCTOBER 1985 6.3 DATA-ACQUISITION SYSTEM EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1666 THRU 6/15/87 OCTOBER 1895 6.5 PRESSURE-TRANSDUCER-CALIBRATION SYSTEM EPA4] SALADO HYDROLOGY FIELD DATA. AUGUST 1666 THRU 8/15/97 OCTOBER 1695 6.6 THERMOCOUPLES EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1646 THRU 9/15/97 OCTOBER 1885 6.7 LINEAR VARIABLE-DIFFERENTIAL TRANSFORMERS EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1969 THRU 9/15/97 OCTOBER 1995 6.8 DIFFERENTIAL-PRESSURE-TRANSMITTER PANEL EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1666 THRU 6/15/87 OCTOBER 1895 6.9 PRESSURIZED-BRINE SAMPLING APPARATUS EPA4| SALADO HYDROLOGY FIELD DATA, AUGUST 1666 THRU 8/15/87 OCTOBER 1695 6.10 PRESSURE-MAINTENANCE SYSTEM EPA4| SALADO HYDROLOGY FIELD OATA. AUGUST 1969 THRU 8/15/67 OCTOBER 1995 6.12 PRESSURE REGULATORS EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1664 THRU 6/15/87 OCTOBER 1495 7.4 THERMOCOUPLE CALIBRATIONS EPA4| SALADO HYDROLOGY FIELD DATA, AUGUST i486 THRU 7.5 LINEAR VARIABLE-DIFFERENTIAL TRANSFORMERS 8/15/87 OCTOBER 1495","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334165,"raw_reference":"CALIBRATIONS EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1966 THRU 6/15797 OCTOBER 1995 7.6 DIFFERENTIAL PRESSURE TRANSMITTER CALIBRATION 63 SAND96-2800","cited_authors":null,"cited_year":null,"cited_title":"CALIBRATIONS EPA4| SALADO HYDROLOGY FIELD DATA. AUGUST 1966 THRU 6/15797 OCTOBER 1995 7.6 DIFFERENTIAL PRESSURE TRANSMITTER CALIBRATION 63 SAND96-2800","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334166,"raw_reference":"SEGMENTS, AND RECORDS - ADDED TO THE RECORDS CENTER COLLECTION BETWEEN OCTOBER 1,1997 AND OCTOBER 31, 1997","cited_authors":null,"cited_year":null,"cited_title":"SEGMENTS, AND RECORDS - ADDED TO THE RECORDS CENTER COLLECTION BETWEEN OCTOBER 1,1997 AND OCTOBER 31, 1997","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334167,"raw_reference":"GAME THEORY 1928-1944 [REFERENCE] LEONARD, R.","cited_authors":null,"cited_year":null,"cited_title":"GAME THEORY 1928-1944 [REFERENCE] LEONARD, R","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334168,"raw_reference":"SEGMENTS, AND RECORDS - ADDED TO THE RECORDS CENTER COLLECTION BETWEEN OCTOBER 1,1997 AND OCTOBER 31,1997 10/1/97 47401 1/1/96","cited_authors":null,"cited_year":null,"cited_title":"SEGMENTS, AND RECORDS - ADDED TO THE RECORDS CENTER COLLECTION BETWEEN OCTOBER 1,1997 AND OCTOBER 31,1997 10/1/97 47401 1/1/96","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334169,"raw_reference":"RETARDATION JULY 30 1997, ATTENDANCE LOG, AGENDA, AND","cited_authors":"RETARDATION JULY 30","cited_year":"1997","cited_title":"ATTENDANCE LOG, AGENDA, AND","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334170,"raw_reference":"SEGMENTS, AND RECORDS - ADDED TO THE RECORDS CENTER COLLECTION BETWEEN OCTOBER 1, 1997 AND OCTOBER 31,1997 SAND97-1991 J, BENTONITE SHAFT SEALS I R I W T ^ R MiS/fiTcTOS?!","cited_authors":null,"cited_year":null,"cited_title":"SEGMENTS, AND RECORDS - ADDED TO THE RECORDS CENTER COLLECTION BETWEEN OCTOBER 1, 1997 AND OCTOBER 31,1997 SAND97-1991 J, BENTONITE SHAFT SEALS I R I W T ^ R MiS/fiTcTOS?!","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334171,"raw_reference":"SEGMENTS, AND RECORDS - ADDED TO THE RECORDS CENTER COLLECTION BETWEEN OCTOBER 1,1997 AND OCTOBER 31,1997 88^i^TloWi[T^EMifElviEMO","cited_authors":null,"cited_year":null,"cited_title":"SEGMENTS, AND RECORDS - ADDED TO THE RECORDS CENTER COLLECTION BETWEEN OCTOBER 1,1997 AND OCTOBER 31,1997 88^i^TloWi[T^EMifElviEMO","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334172,"raw_reference":"FEBRUARY 1997 10/13/97 SAND97-2128A, APPLICATION OF FLOWDIMENSIONS TO WELL-TEST ANALYSIS","cited_authors":null,"cited_year":null,"cited_title":"FEBRUARY 1997 10/13/97 SAND97-2128A, APPLICATION OF FLOWDIMENSIONS TO WELL-TEST ANALYSIS","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334173,"raw_reference":"PANEL ON THE EFFECTIVE LIFE OF ROOMS IN PANEL 1 JUNE 1991 [REFERENCE] 11/11/97 47950 SfePfcRT QEJJHF^GEQIECHNICAL 11/11/97 47949 10/16/97","cited_authors":null,"cited_year":null,"cited_title":"PANEL ON THE EFFECTIVE LIFE OF ROOMS IN PANEL 1 JUNE 1991 [REFERENCE] 11/11/97 47950 SfePfcRT QEJJHF^GEQIECHNICAL 11/11/97 47949 10/16/97","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334174,"raw_reference":"ASME NQA-2A-1990 ADDENDA TO ASME NQA-2-1989 EDITION QUALITY","cited_authors":null,"cited_year":null,"cited_title":"ASME NQA-2A-1990 ADDENDA TO ASME NQA-2-1989 EDITION QUALITY","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334175,"raw_reference":"REQUEST FOR WIPP DOCUMENTS, DATED SEPTEMBER 26, 1997, [EEG](W/ATT. FAX M. SILVA TO M. IRWIN","cited_authors":"REQUEST FOR WIPP DOCUMENTS, DATED SEPTEMBER 26","cited_year":"1997","cited_title":"[EEG](W/ATT. FAX M. SILVA TO M. IRWIN","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334176,"raw_reference":"NUCLEAR WASTE POLICY ACT OF 1982 [REFERENCE]","cited_authors":null,"cited_year":null,"cited_title":"NUCLEAR WASTE POLICY ACT OF 1982 [REFERENCE]","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334177,"raw_reference":"CCA Related - November 1997 HELTON, J. SWCF","cited_authors":null,"cited_year":null,"cited_title":"CCA Related - November 1997 HELTON, J. SWCF","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334178,"raw_reference":"BROWN, R. W., 6319 10941 10845 Sandia National Labs Confidential Related to CCA - December 1997 Author Suffix Record Date 10121 Recipient 12/2/93","cited_authors":null,"cited_year":null,"cited_title":"BROWN, R. W., 6319 10941 10845 Sandia National Labs Confidential Related to CCA - December 1997 Author Suffix Record Date 10121 Recipient 12/2/93","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2334179,"raw_reference":"DECEMBER 1, 1997 AND DECEMBER 31,1997 BROWN, R. Page 1 of 253 Recipient o xi -n m","cited_authors":null,"cited_year":null,"cited_title":"DECEMBER 1, 1997 AND DECEMBER 31,1997 BROWN, R. Page 1 of 253 Recipient o xi -n m","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}