Correspondence between EPA/F. Marcinowski and DOE/I. Triay regarding changes for Panel 1 utilization at WIPP [A-98-49-II-B3-19]

Docket document2022-10-24 · EPA · report · EPA-HQ-OAR-2004-0430-0135
RIN 2060-AG85 · Docket EPA-HQ-OAR-2004-0430

Other documents for the same rulemaking (all, by stage)

Docket documentWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening of Public Comment Period
1996-11-15 Federal RegisterDecision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria
1997-10-30 Federal RegisterCriteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision
1998-05-18 Federal RegisterCriteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-05-21 Federal RegisterOpportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-06-24 Federal RegisterQuality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-03-25 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterChange in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant
1999-05-13 Federal RegisterInspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant
1999-05-17 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-10-18 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-12-08 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2000-04-14 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2000-08-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2000-11-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-04-05 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2001-07-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant
2002-02-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant
2002-03-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant
2002-05-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)
2005-08-29 Docket documentDraft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]
2005-11-03 Docket documentFinal Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]
2006-07-24 Docket documentTechnical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities
2006-07-24 Docket documentTechnical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review
2006-07-24 Docket documentTechnical Support Document for 194.27: Salado Flow Conceptual Models Peer Review
2006-07-24 Docket documentTechnical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment
2006-07-24 Docket documentTechnical Support Document for Section 194.27: Spallings Conceptual Model Peer Review
2006-07-24 Docket documentTechnical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review
2006-07-24 Docket documentTechnical Support Document for Section 194.14: Evaluation of Karst at the WIPP Site
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation
2006-07-25 Docket documentComparison of Effects of Brine Pocket Size
2006-07-25 Docket documentPlutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)
2006-07-25 Docket documentSensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)
2006-07-25 Docket documentSalado Flow Peer Review Plan
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report
2006-07-25 Docket documentII-G-22: Conceptual Models Third Supplementary Peer Review Report
2006-07-25 Docket documentII-G-12: Conceptual Models Supplementary Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report
2006-07-25 Docket documentSpallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow
2006-07-25 Docket documentWaste Isolation Pilot Plant: Conceptual Models Peer Review Report
2006-07-25 Docket documentQuality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]
2006-07-25 Docket documentEvaluation Of Risks And Waste Characterization Requirements For The Transuranic Waste Emplaced In WIPP During 1999 [DOE/AL58309-75] (EEG-75)
2006-07-25 Docket documentAnalysis of Emplaced Waste Data and Implications of Non-Random Emplacement for Performance Assessment for the WIPP [DOE/AL58309-85]-(EEG-85)
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models, Final Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Peer Review Plan
2006-07-25 Docket documentIndividual Radiation Doses From Transuranic Waste Brought To The Surface By Human Intrusion At The WIPP [DOE/AL/58309-66] (EEG-66)
2006-07-25 Docket documentPEER 1-Conceptual Models Peer Review (CMPR)
2006-07-25 Docket documentEvaluation of the WIPP Project's Compliance with the EPA Radiation Protection Standards for Disposal of Transuranic Waste [DOE/AL/58309-68] (EEG-68)
2006-07-25 Docket documentInternational Peer Review of the 1996 Performance Assessment of the US Waste Isolation Pilot Plant (WIPP)

References: 17 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
INTRODUCTION The Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico is being operated for the disposal of transuranic (TRU) radioactive waste from Department of Energy (DOE) defense programs. In October 1996, the DOE submitted its Compliance Certification Application (CCA;
research reportNot linked to a paper · refsec
EPA (U.S. Environmental Protection Agency) 1993. 40 CFR Part 191: Environmental Radiation Protection Standards for the Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes; Final Rule. Federal Register, Vol. 58, No. 242, pp. 66398-66416. Office of Radiation and Indoor Air, Washington, D.C.
government reportNot linked to a paper · refsec
EPA(U.S. Environmental Protection Agency) 1998. 40CFRPartl94: Criteriafor the Certification and Re-certification ofthe Waste Isolation Pilot Plant's Compliance with the 40 CFR Part 191 ' Disposal Regulations: Certification Decision; Final Rule. Federal Register, Vol. 63, No. 95, pp. 27353-27406. Office of Radiation and Indoor Air, Washington, D.C.
government reportNot linked to a paper · refsec
MacKinnon, J. Miller, D. G. O'Brien, J. L. Ramsey, J.D. Schreiber, A. Shinta, L. N. Smith, D.M. Stoelzel,C. Stockman, and P. Vaughn. 1998. Uncertainty and Sensitivity Analysis Results Obtained in the 1996 Performance Assessment for the Waste Isolation Pilot Plant. SAND98-0365.
research reportNot linked to a paper · refsec
Stone, C. M. 1997. Final Disposal Room Structural Response Calculations. SAND97-0795. Sandia National Laboratories, Albuquerque, NM. 4/26/2001 10 of 10 Sandia National Laboratories Panel 1 Utilization Analysis for the Waste Isolation Pilot Plant
research reportNot linked to a paper · refsec
P. (2001). Direktor Kali und Salz GmbH. From discussions at the
research reportNot linked to a paper · refsec
Callahan, G. D. and K. L. DeVries. 1991. "Analyses of Backfilled Transuranic Wastes Disposal Rooms." SAND91-7052. Sandia National Laboratories, Albuquerque, NM.
research reportNot linked to a paper · refsec
Mraz, D., L. Rothenburg and J. Unrau. 1996. "Review of In-Situ Stress and Strain Monitoring Programs around Openings in a Deep Potash Mine," Proceedings 4th. Conference on the Mechanical Behavior of Salt, Montreal.
journal articleNot linked to a paper · refsec
Mellegard, K. D., T. W. Pfeifle and F. D. Hansen. 1998. "Laboratory Characterization of Mechanical and Permeability Properties of Dynamically Compacter Crushed Salt." SAND98-2046. Sandia National Laboratories, Albuquerque, NM.
research reportNot linked to a paper · refsec
Morgan, H. S., 1987. "Estimate ofthe Time Needed for TRU Storage Rooms to Close," Memorandum to D.E. Munson, in Butcher, B. M. and F. T. Mendenhall, 1993. "A Summary ofthe Models Used for the Mechanical Response of Disposal Rooms in the
research reportNot linked to a paper · refsec
NRC (National Research Council) 1996. "The Waste Isolation Pilot Plant: A Potential Solution for the Disposal of Transuranic Waste". Committee on the Waste Isolation Pilot Plant Board on Radioactive Waste Management. Washington, DC:National Academy Press (Available from the National Technical Information Service (NTIS), Springfield
government reportNot linked to a paper · refsec
VA as PB97-138069/XAB.) Sandia National Laboratories. 1996. "Waste Isolation Pilot Plant Shaft Sealing System Compliance Submittal Design Report." SAND96-1326. Sandia National Laboratories.
research reportNot linked to a paper · refsec
Albuquerque, NM. Stone, C. M. 1997. "Final Disposal Room Structural Response Calculations." SAND97-0795. Sandia National Laboratories, Albuquerque, NM. P.55 Response to Panel 1 Utilization Information Request l l l l | I I I H I I H | U l l f llllf llll |lll l|llll |l III | l l l l | II I l | M I I | llll|ll l l | l l l l | II l l | l l l l | I I I H I I I I | l l l l . . . . I . . . . I . . . . I . . . . I.... I.... I Page 5 of 9 I....I....I....I. 1Z0 140 160 180 200 110 130 ISO 170 190
research reportNot linked to a paper · refsec
TIME (YEPRS) Figure 1. Closure of Empty Storage Room (Morgan, 1987) 3500 3000 — Anhydrite Layer — Anhydrite Layer With Clay Seam — All Salt Stratigraphy ^ ^ H ^ * ^ i _ • ^ ^ > I ^ M J ^ ^ B ^ ^ ^ H > ^ ^ ^ ^ > Time (years) Figure 2. Disposal Room Volume (m3x) Reduction with Time P.56 Response to Panel 1 Utilization Information Request Page 6 of 9
government reportNot linked to a paper · refsec
Johnson, R.J. MacKinnon, J. Miller, D. G. O'Brien, J. L. Ramsey, J.D. Schreiber, A. Shinta, L. N. Smith, D.M. Stoelzel, C. Stockman, and P. Vaughn. 1998. Uncertainty and Sensitivity Analysis Results Obtained in the 1996 Performance Assessment for the Waste Isolation Pilot Plant. SAND98-0365. Albuquerque,
research reportNot linked to a paper · refsec
Carlsbad, NM 88221 Dear Dr. Triay: The Environmental Protection Agency (EPA) has completed an evaluation ofthe Department of Energy's (DOE) requests of April 26, 2001, and June 29, 2001, to consider an alternative use of Panel l ofthe Waste Isolation Pilot Plant (WIPP). Based on our review ofthe • information that you provided, and in accordance with section I94.4(b)(3)(vi) ofthe Compliance
research reportNot linked to a paper · refsec
Therefore, this evaluation considers the proposed changes of using all, part, or none of space in each ofthe rooms of Panel 1 and closing Panel 1 without RH-TRU waste (items 2 and 3 above). Review of Proposed Changes During numerous site visits EPA staff have noted the degraded condition of Panel 1 because of its advanced age, and we are concerned about the possible effects ofthe condition of Panel 1 on the safe emplacement of waste. The Environmental Evaluation Group (EEG) recommended in August 1996, EEG-63, Stability Evaluation ofthe Panel 1 Rooms and The El 40 Drift at WIPP (obtainable from EEG)
journal articleNot linked to a paper · refsec