Ltr/EPA/F. Marcinowski to DOE/I. Triay transmitting inspection reports: SLN's QA Program and LANL's QA program. [A-98-49-II-A1-13]
Other documents for the same rulemaking (all, by stage)
References: 18 extracted, 0 linked to papers
PURPOSE At § 194.22(a)(1), the Agency requires the DOE to adhere to a quality assurance program that implements the requirements ofthe following: 1) ASME NQA-1-1989 edition; 2) ASME NQA2a-1990 addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The EPA verified that the DOE established these requirements in its Compliance Certification Application (CCA) to the EPA for the WIPP. The QAPD is the documented quality assurance program plan for the WIPP project, as a whole, to comply with the NQA requirements. The QAPD is implemented by the DOE's Carlsbad Area Office (CAO), which has the authority to audit all other organizations associated with waste disposal at the WIPP to ensure that their lower-tier quality assurance programs establish and implement the applicable requirements ofthe QAPD. Each DOE generator site (including
EPA's ORIA conducted initial audits ofthe LANL quality assurance program on May 12, August 18-22 and September 10-11, 1997. Subsequently, the Agency conducted a maintenance inspection, on September 21-25,1998, of DOE Audit A-98-30 ofthe LANL quality assurance program for transuranic waste characterization activities. The purpose ofthe inspection was to verify whether LANL had maintained a quality assurance program in accordance with the requirements of 40 CFR 194.22(a)(1), which addresses quality assurance for activities associated with the WIPP. This inspection also served to verify the DOE audit was performed in compliance with NQA-1, Element 18, entitled "Audits". The EPA conducted its current maintenance inspection on November 9-10, 1999 of DOE Audit A-00-03 ofthe LANL quality assurance program for waste characterization activities. The
SCOPE The scope ofthe inspection covered all aspects ofthe CAO's Audit A-00-03, which was performed on November 9-10, 1999. The activities performed by the EPA's inspection team included, but were not limited to, interviews with the auditors, audit checklists and all applicable
DOE Los Alamos National Laboratory. TWCP Organization Chart, TWCP Interface Organization Charts, November 1, 1999.
DOE Los Alamos National Laboratory. Developing Procedures, TRU Waste Characterization Program Quality Procedure TWCP-QP-1.1-001, R.4, September 15, 1998.
The U.S. Environmental Protection Agency (EPA) conducted an inspection, on November 8-11, 1999, ofthe U.S. Department of Energy (DOE) Audit A-00-01 ofthe quality assurance program for the Sandia National Laboratory (SNL) Nuclear Waste Management Program (NWMP). SNL is located in both Albuquerque and Carlsbad, New Mexico and serves in a contractor capacity to the DOE Carlsbad Area Office (CAO), which is responsible for the management ofthe Waste Isolation Pilot Plant (WIPP). SNL has conducted numerous research programs in support ofthe
WIPP, the geologic repository for the disposal ofthe nation's transuranic wastes. The purpose of the inspection was to confirm the continued compliance of SNL's quality assurance program with the requirements of 40 CFR 194.22(a)(1), which addresses quality assurance for activities associated with the WIPP. This inspection was conducted under the authority of 40 CFR 194.8(a)(4). The EPA's Office of Radiation and Indoor Air (ORIA) found that SNL's quality assurance program continues to comply with the requirements for quality assurance programs as set forth in 194.22(a), which includes by reference, the requirements of ASME NQA-1-1989 edition; ASME
NQA-2a-1990 addenda, part 2,7 to ASME NQA-2-1989 edition; and ASME NQA-3-1989 edition (excluding Section 2.1 (b) and (c), and Section 17.1). During the inspection, the EPA: 1) verified the proper execution ofthe SNL's quality assurance program; 2) verified the DOE audit was performed in compliance with NQA-1, Element 18, entitled "Audits;" and 3) independently verified the implementation of a sample of NQA requirements by the SNL quality assurance program. The DOE audit team concluded that SNL's QA program continues to be satisfactorily implemented. The EPA inspectors: 1) agree with the DOE audit team's general conclusion at the audit close-out meeting, 2) found no instances of nonconformance in DOE's performance ofthe audit, and 3) found no instances of nonconformance in SNL's QA program. This report will be made available to the public through the Agency's public dockets.
EPA's ORIA conducted an initial audit ofthe SNL WIPP quality assurance program from January 13-24, 1997. Subsequently, the Agency conducted a maintenance inspection, on September 21-25, 1998, of DOE Audit A-98-19 ofthe SNL quality assurance program for transuranic waste characterization activities. The purpose of this inspection was to verify whether SNL had maintained a quality assurance program in accordance with the requirements of 40 CFR 194.22(a)(1), which addresses quality assurance for activities associated with the WIPP. This inspection also served to verify that the DOE audit was performed in compliance with
NQA-1, Element 18, entitled "Audits". The EPA conducted its current maintenance inspection on November 8-11, 1999 of DOE Audit A-00-01 of SNL's NWMP quality assurance program for WIPP activities. The DOE's audit encompassed only the activities associated with the proposed disposal of transuranic wastes at the WIPP. The EPA conducted the following activities: In accordance with § 194.22(e), the EPA inspection team evaluated the SNL quality assurance program plan to verify the establishment of applicable NQA requirements of § 194.22(a)(1). In accordance with § 194.22(e), the EPA inspection team performed the following activities to verify the proper maintenance of SNL's quality assurance program: Inspected the DOE audit ofthe SNL quality assurance program; Witnessed the DOE audit team properly implementing NQA-1, Element 18 requirements for the performance of audits; and, Conducted an independent assessment of selected NQA requirements that P.30 are applicable to WIPP activities.
SCOPE The scope ofthe inspection covered all aspects ofthe CAO's Audit A-00-01, which was performed on November 8-11, 1999. The activities performed by the EPA's inspection team included, but were not limited to, interviews with the auditors and the assessment ofthe DOE audit reports, corrective action reports, audit checklists and all applicable DOE audit working papers. The EPA inspection team assessed the adequacy ofthe CAO's audits in accordance with the requirements of 40 CFR 194.22(a)(1), as discussed above in Section 2.0 ofthis report. The EPA's inspection team selected two NQA-1 elements to independently ensure the implementation of SNL's quality assurance program. The NQA-1 elements chosen by the EPA to inspect are:
DOE Sandia National Laboratory. NP 1 -1, Organization and QA Program, Rev. 2, effective date: June 14, 1999.
DOE Sandia National Laboratory. NP 4-1, Procurement, Rev. 2, effective date: October 13, 1999.
DOE Sandia National Laboratory. SNL NWMP Organization Chart (revised during CAO Audit A-00-01), November 11, 1999.
DOE Sandia National Laboratory. Sandia WIPP Management Assessment Report, June 22, 1999.
DOE Sandia National Laboratory. Audit EA9905, Duke Engineering, March 15-17, 1999.
DOE Sandia National Laboratory. Audit EA9910, Los Alamos National Laboratory, July 7-8, 1999.
Laboratory, August 31-September 2, 1999. DOE Sandia National Laboratory. Audit EA9912, Florida State University, September 14-16, 1999.