EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA) performed inspection no. EPAINEEL-7.01-24 on July 2-3, 2001, at the Idaho National Engineering and Environmental Laboratory (INEEL). The purpose of the inspection was to investigate a nonconformance whereby hundreds of waste drums were shipped to the Waste Isolation Pilot Plant (WIPP) despite having been characterized by radioassay equipment that had not been reviewed and approved by EPA under authority of the WIPP Compliance Criteria at 40 CFR 194.8. Inspectors interviewed INEEL personnel and performed an independent test comparing the unapproved equipment (Waste Assay Gamma Spectrometer) to a very similar system (SWEPP Gamma-Ray Spectrometer) that was approved by EPA. During the inspection, EPA was able to verify which drums were shipped to the WIPP, and whether they were situated in the mine or on the surface. INEEL has assessed the causes of the nonconformance and undertaken appropriate actions to prevent recurrence. Additionally, independent testing of the WAGS suggested that it produces assay results comparable to that of the SGRS. Therefore, there does not appear to be an immediate cause to remove WAGScharacterized drums from the WIPP, either for public safety or for further characterization.
TC-AI-2-& JUL 2 7 2001 EPA AIR DOCKET INSPECTION NO. EPA-INEEL-7.01-24
APPENDICES APPENDIX A - Procedure Basis 412.09 ;02/16/2000-Rev.0S)
TPR-1654 4 of 37 .-..'. APPENDIX B - Menu Options Unavailable to the SO. 412.09 (02/16/2000 • Rev. 05) Technical Procedure Radioactive Waste Management Complex
PRD-101 7.2.1.2 P.42 412.09 (02/16/2000 - Rev. 05) Technical Procedure Radioactive Waste Management Complex
Program, latest revision. PLN-577, TRUPACT-n Authorized Methods for Payload Control (TRAMPAC) Compliance Plan, latest revision. P.76 Management Control Procedure 3,100 m3 Project 412.09 102/16/2000- Rev. 05)