Policy Replication

Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting report for inspection no. EPA - CBFO -1.01-22 [A-98-49-II-A1-24]

Docket document2022-10-24 · EPA · report · EPA-HQ-OAR-2004-0430-0058
RIN 2060-AG85 · Docket EPA-HQ-OAR-2004-0430

Other documents for the same rulemaking (all, by stage)

Docket documentWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening of Public Comment Period
1996-11-15 Federal RegisterDecision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria
1997-10-30 Federal RegisterCriteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision
1998-05-18 Federal RegisterCriteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-05-21 Federal RegisterOpportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-06-24 Federal RegisterQuality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-03-25 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterChange in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant
1999-05-13 Federal RegisterInspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant
1999-05-17 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-10-18 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-12-08 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2000-04-14 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2000-08-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2000-11-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-04-05 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2001-07-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant
2002-02-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant
2002-03-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant
2002-05-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)
2005-08-29 Docket documentDraft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]
2005-11-03 Docket documentFinal Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]
2006-07-24 Docket documentTechnical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities
2006-07-24 Docket documentTechnical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review
2006-07-24 Docket documentTechnical Support Document for 194.27: Salado Flow Conceptual Models Peer Review
2006-07-24 Docket documentTechnical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment
2006-07-24 Docket documentTechnical Support Document for Section 194.27: Spallings Conceptual Model Peer Review
2006-07-24 Docket documentTechnical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review
2006-07-24 Docket documentTechnical Support Document for Section 194.14: Evaluation of Karst at the WIPP Site
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation
2006-07-25 Docket documentComparison of Effects of Brine Pocket Size
2006-07-25 Docket documentPlutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)
2006-07-25 Docket documentSensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)
2006-07-25 Docket documentSalado Flow Peer Review Plan
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report
2006-07-25 Docket documentII-G-22: Conceptual Models Third Supplementary Peer Review Report
2006-07-25 Docket documentII-G-12: Conceptual Models Supplementary Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report
2006-07-25 Docket documentSpallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow
2006-07-25 Docket documentWaste Isolation Pilot Plant: Conceptual Models Peer Review Report
2006-07-25 Docket documentQuality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]
2006-07-25 Docket documentEvaluation Of Risks And Waste Characterization Requirements For The Transuranic Waste Emplaced In WIPP During 1999 [DOE/AL58309-75] (EEG-75)
2006-07-25 Docket documentAnalysis of Emplaced Waste Data and Implications of Non-Random Emplacement for Performance Assessment for the WIPP [DOE/AL58309-85]-(EEG-85)
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models, Final Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Peer Review Plan
2006-07-25 Docket documentIndividual Radiation Doses From Transuranic Waste Brought To The Surface By Human Intrusion At The WIPP [DOE/AL/58309-66] (EEG-66)
2006-07-25 Docket documentPEER 1-Conceptual Models Peer Review (CMPR)
2006-07-25 Docket documentEvaluation of the WIPP Project's Compliance with the EPA Radiation Protection Standards for Disposal of Transuranic Waste [DOE/AL/58309-68] (EEG-68)
2006-07-25 Docket documentInternational Peer Review of the 1996 Performance Assessment of the US Waste Isolation Pilot Plant (WIPP)

References: 36 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA) conducted an annual audit ofthe Department of Energy (DOE) Carlsbad Field Office (CBFO) quality assurance program from January 9-10, 2001. The CBFO is responsible for the management ofthe Waste Isolation Pilot Plant (WIPP), the geologic repository for the disposal ofthe nation's transuranic wastes. The purpose ofthe
research reportNot linked to a paper · refsec
CBFO has appropriately maintained its QA program since the previous EPA audit conducted in Jaunuary 2000. This report will be made available to the public through the Agency's public dockets. .- -.. -. • - • --=-_•• ^> _„ The EPA found that CBFO's quality assurance program continues to comply with the EPA requirements for WIPP quality assurance programs. During the audit, the EPA: 1) verified the continued establishment ofthe applicable QA requirements in the CBFO Quality Assurance Program Plan (QAPD); 2) verified the implementation of a sample of-QA requirements through interviews and reviews of CBFO documents. The EPA identified four findings of non-conformance and one concern during its audit ofthe
research reportNot linked to a paper · refsec
BACKGROUND Regulatory Background EPA promulgated criteria in 40 CFR Part 194 to determine whether the DOE WIPP will comply with EPA's environmental radiation protection standards for the disposal of transuranic wastes. At § 194.22(a)(1), EPA requires DOE to adhere to a QA program that implements the requirements ofthe following: 1) ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990
research reportNot linked to a paper · refsec
Addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The Agency verified that DOE established these requirements in the Quality Assurance Program Doc"unTeTiF(tfAPD) included in the Compliance Certification Application (CCA) for the WIPP. The QAPD is the documented QA program plan for the WIPP project, as a whole, to comply with the NQA requirements. The
research reportNot linked to a paper · refsec
QA programs establish and implement the applicable requirements ofthe QAPD. The DOE generator sites, which will characterize and ship waste for disposal in the WIPP, must prepare site-specific QA program plans that establish the applicable NQA requirements. In accordance with 40 CFR 194.22(e), the EPA Administrator verifies the "appropriate execution of quality assurance programs through inspections, record reviews and recordkeeping requirements, which may include, but may not be limited to, surveillance, audits and management systems reviews." In December 1996, EPA conducted an audit that determined that
research reportNot linked to a paper · refsec
CFR 194.22(a) Audit January 6-8, 1999 Audit for maintenance of QA program for conformance with 40
research reportNot linked to a paper · refsec
CFR 194.22(a) Audit January 4-6, 2000 Audit for maintenance of QA program for conformance with 40
research reportNot linked to a paper · refsec
CFR 194.22(a) Audit January 9-10,2001 Audit for maintenance of QA program for conformance with 40
research reportNot linked to a paper · refsec
WIPP, the CBFO conducts an audit ofthe QA program, as well as waste characterization program, to certify that they are in compliance with the CBFO QAPD. Prior to September 2000, the CBFO was known as the Carlsbad Area Office (CAO). In this audit report, discussions of actions by CAO or documents prepared by CAO have been changed to reflect the new name, Carlsbad Field Office, or abbreviation (CBFO).
research reportNot linked to a paper · refsec
PURPOSE AND SCOPE The EPA's ORIA conducted an audit from January 9-10, 2001 ofthe CBFO QA program. The purpose ofthe audit was to confirm the continued compliance of CBFO's QA program with the requirements of 40 CFR 194.22, which addresses quality assurance for activities associated with the WIPP. The inspection was conducted under the authority of 40 CFR 194.22(e), which allows the Agency to verify the appropriate execution of QA programs through inspections, record reviews, and other measures. This report documents the results ofthe EPA audit to verify whether or not CBFO has appropriately maintained its QA program. The scope ofthis audit covers all aspects ofthe CBFO quality ¥lstifance program for all items and activities important to the containment of tranuranic waste at the WIPP. The EPA inspection team conducted the following activities: In accordance with § 194.22(e), the EPA inspection team evaluated Revision 3 of the QAPD and a sample of CBFO management and team procedures (MPs and TPs) to verify that revisions do not diminish the establishment of applicable NQA requirements. In accordance with § 194.22(e), the inspection team performed the following activities to verify the proper implementation of a sample of NQA requirements by the CBFO QA program: conducted interviews of CBFO management, staff, and support contractors; and conducted an assessment of CBFO's implementation of quality assurance requirements pursuant to NQA-1, Elements 1, 2, 5, 6, 17, and 18. P.10
research reportNot linked to a paper · refsec
ATTACHMENT 4 REFERENCES DOE Carlsbad Field Office. Quality Assurance Program Document, CAO-94-1012, Rev. 3, November 1999.
research reportNot linked to a paper · refsec
DOE/WIPP-98-2287, Rev.2, January 2000. DOE Carlsbad Field Office. Management Assessment JAeport-February 16-19, 1999. Approved January 16,1999.
research reportNot linked to a paper · refsec
DOE Carlsbad Field Office. Management Procedure 1.2, Rev. 1, Selection of Quality Levels and Applicable QA Requirement, October 20,1998. ICN#1 (December 7, 1998)
research reportNot linked to a paper · refsec
Procedure, August 13, 1998. ICN#1 (August 18, 1998) and ICN#2 (December 13, 2000)
research reportNot linked to a paper · refsec
Reporting, November 28, 2000. DOE Carlsbad Field Office. Team Procedure 3.2, Rev. 1, Corrective Action Report (CAR) Trend Analysis and Reporting (QA only), December 6, 1999.
research reportNot linked to a paper · refsec
DOE Carlsbad Field Office. Management Procedure 4.1, Rev. 3, Preparation and Maintenance of CBFO Procedures, January 5, 2001.
research reportNot linked to a paper · refsec
DOE Carlsbad Field Office. Management Procedure 4.2, Rev. 2, Document Review, January 5, 2001.
journal articleNot linked to a paper · refsec
Control, January 5, 2001. 11. DOE Carlsbad Field Office. Management Procedure 4.5, Rev. 1, Generating, Receiving,
research reportNot linked to a paper · refsec
Storing, and Controlling Active CAO Project Records, December 28, 1996.
research reportNot linked to a paper · refsec
Inventorying, Scheduling, and Dispositioning, December 28, 1996.
research reportNot linked to a paper · refsec
16. DOE Carlsbad Field Office. Management Procedure 7.1, Rev. 1, QA Requirements for Procurement of Goods and Services, June 25, 1998.
research reportNot linked to a paper · refsec
17. DOE Carlsbad Field Office. Management Procedure 9.1, Rev. 2, Management Assessment, November 17, 2000.
research reportNot linked to a paper · refsec
18. DOE Carlsbad Field Office. Team Procedure 10.1, Rev.2, Qualification of Audit Personnel and Certification of Lead Auditors, October 26,2000.
research reportNot linked to a paper · refsec
19. DOE Carlsbad Field Office. Management Procedure 10.2, Rev. 2, Surveillances, September 4, 1998.
research reportNot linked to a paper · refsec
20. DOE Carlsbad Field Office. Management Procedure 10.3, Rev. 3, Audits, November 24, 1999. ICN#1 (February 3, 2000) and ICN#2 (July 12, 2000)
research reportNot linked to a paper · refsec
21. DOE Carlsbad Field Office. Management Procedure 10.4, Rev. 3, Observations, May 18, 1999.
research reportNot linked to a paper · refsec
22. DOE Carlsbad Field Office. CAO Corrective Action Report Log, Fiscal Year 1999.
research reportNot linked to a paper · refsec
23. DOE Carlsbad Field Office. CAO Corrective Action Report Log, Fiscal Year 2000.
research reportNot linked to a paper · refsec
24. DOE Carlsbad Field Office. Organization Chart. January 2, 2001.
research reportNot linked to a paper · refsec
27. DOE Carlsbad Field Office. Audit Report ofthe Idaho National Engineering and Environmental Laboratory, Audit Number A-01-02, December 5-7, 2000. Approved January 4, 2001.
research reportNot linked to a paper · refsec
28. DOE Carlsbad Field Office. Carlsbad Field Office Audit Plan, Audit Number-A-01 -02. Approved October 12,2001.
research reportNot linked to a paper · refsec
29. DOE Carlsbad field Office. Audit Report ofthe Los Alamos National Laboratory, Audit Number A-00-13, August 28-31, 2000. Approved September 19, 2000. P.61
research reportNot linked to a paper · refsec
30. DOE Carlsbad Field Office. Audit Report ofthe Savannah River Site, Audit Number A-01 01, November 7-16,2000. Approved December 14, 2000.
research reportNot linked to a paper · refsec
31. DOE Carlsbad Field Office. Management Assessment Plan, "Plan for a Management Assessment ofthe Organizational Climate for Quality," November 1, 2000.
research reportNot linked to a paper · refsec
32. DOE Carlsbad Field Office. Management Assessment Report, "The Organizational Climate for Quality," December 13,2000. Approved December 21, 2000.
research reportNot linked to a paper · refsec
33. DOE Carlsbad Field Office. Management Assessment Plan, "Plan for a Management Assessment ofthe QA Program at the Carlsbad Field Office," November 1, 2000.
research reportNot linked to a paper · refsec