Audit of the Westinghouse Waste Isolation Division Quality Assurance Program - February 1999 [A-98-49-II-A1-7]
Other documents for the same rulemaking (all, by stage)
References: 4 extracted, 0 linked to papers
EXECUTIVE SUMMARY The U.S. Environmental Protection Agency's (EPA) Office of Radiation and Indoor Air (ORIA) conducted an audit ofthe Westinghouse Waste Isolation Division (WID) Quality Assurance program on February 9-11, 1999. WID is located near Carlsbad, New Mexico at the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP). WID serves as the management and operations contractor to the DOE Carlsbad Area Office (CAO), which is responsible for the management ofthe WIPP. WID's responsibilities include the day-to-day management, operations, and maintenance ofthe WIPP. The purpose ofthe audit was to verify whether WID has maintained a quality assurance program in accordance with the requirements of 40 CFR 194.22(a)(1), which addresses quality assurance for activities associated with the WIPP. The audit was conducted under the authority of 40 CFR § 194.22(e). The audit team determined that WID has maintained a properly-executed quality assurance program that implements the requirements of 40 CFR 194.22(a)(1), which includes, by reference, the requirements of ASME NQA-1-1989 edition; ASME NQA-2a-1990 addenda, part 2.7 to
ASME NQA-2-1989 edition; and ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c), and Section 17.1). Team members agreed that the WID quality assurance program adequately addressed the requirements of 40 CFR 194.22(a)(1). The quality assurance program, including quality assurance procedures, was found to be fully implemented at the time of the audit. Three findings were discovered by the audit team, one of which was resolved prior to completion ofthe audit and two of which were responded to by WID. Two ofthe findings concern software, and the third finding concerns the listing of quality assurance records generated by a procedure. In addition, the audit team noted one concern, which was corrected during the audit. The audit team determined that findings and the concern did not affect the quality ofthe waste containment activities at the WIPP.
EPA's ORIA conducted an audit ofthe WID quality assurance program in February, 1997, with a follow-up visit to WID in June, 1997. In the audit report dated August, 1997, ORIA determined that WID had properly executed a quality assurance program that implements the requirements of 40 CFR 194.22(a). ORIA conducted a second maintenance audit ofthe WID quality assurance program from February 9-11, 1999. The purpose ofthis follow-up audit was to verify that WID has continued to maintain a quality assurance program in accordance with 40 CFR 194.22(a)(1), which includes, by reference, the requirements of ASME NQA-1-1989 edition; ASME NQA-2a1990 addenda, ASME NQA-2.7-1989 edition; and ASME NQA-3-1989 edition [excluding Section 2.1(b) and (c), and Section 17.1].
SCOPE The scope ofthis audit included all aspects ofthe WID quality assurance program that occurred between February, 1998 and January, 1999. The audit included, but was not limited to, the NQA requirements, the adoption ofthe CAO Quality Assurance Program Document (QAPD), quality assurance procedures (QAPs), and corrective action reports (CARs). The audit team assessed the adequacy and implementation of the WID quality assurance program, in accordance with the requirements of 40 CFR 194.22(a). P.10